A hotel bathroom specification can be signed off in a single email exchange, or it can stall for weeks over one missing drawing. The difference is rarely the product itself — it is whether the enquiry carried enough information for the factory to price the right configuration the first time. If you are sourcing a two piece washdown toilet 1038A for guest rooms, corridors or service floors, this guide lists exactly what to send and why each item changes the quotation.

Send five things in your first message: the room count by floor type, the drainage layout with trap type and rough-in dimension, the flush valve and cistern arrangement you expect, the finish and branding requirements, and the delivery destination with a target on-site date. Everything else — spare parts, packaging, inspection level — can be settled after the first price comes back.

Why the two-piece configuration is easy to quote, and where it still goes wrong

A two-piece toilet arrives as two separate bodies — pan and cistern — so it packs more compactly, travels with less risk of damage, and can be replaced part by part during the operating life of a hotel. For procurement teams that matters more than the styling argument: freight space is used more efficiently, and housekeeping or engineering can swap a cracked cistern without touching the pan.

The 1038A is made from vitreous china ceramic with a smooth glazed surface, using a washdown flushing action. The part of the specification that suppliers most often have to ask about again is the outlet. This model supports two drainage routes: an 180 mm wall-mounted P-trap and a 250 mm floor S-trap rough-in. Those are different castings and different installation details, so a quotation that does not state which one applies is not comparable with a competitor's price.

A practical caution: the trap and rough-in figures above come from the published product page. Before you lock them into a tender document, ask the supplier to confirm them on the current technical drawing for your order quantity. Slab depths, floor build-ups and wall finishes move these numbers in real projects.

The six items that determine the price

1. Room count, split by room type

Give a quantity per location rather than one total: guest rooms, public and corridor WCs, staff and back-of-house areas, villas or suites. The split drives unit price bands, carton count and whether mixed loading is possible in one container. It also tells the factory where a matching suite is needed — for example the floor standing bidet 1038F from the same series, which is specified in some markets and omitted entirely in others.

2. Drainage layout: trap type and rough-in dimension

This is the item that causes the most rework. State for each room type whether the waste exits through the floor or the wall, and give the measured centre distance from the finished wall face. Attach a marked-up plumbing drawing or even a site photograph with dimensions written on it. If your project mixes both layouts — P-trap in refurbished rooms, S-trap in new build — say so explicitly and ask for the two configurations to be quoted as separate line items.

Also confirm what happens behind the fixture: exposed pipework versus a ducted shaft, and whether the wall can carry the load if any rooms are later changed to a wall-hung layout such as the wall hung toilet 1038W. A two-piece floor-standing pan and a concealed-tank wall-hung WC are different systems, with different carrier frames and different spare-part inventories.

3. Cistern, flush volume and actuation

Tell the supplier which cistern arrangement your drawings show — close-coupled to the pan, or a separate tank — and what flushing interface the design calls for: single flush, dual flush, top button or side lever. Where the local water code sets a maximum per flush, quote that requirement in your message rather than expecting the factory to know it. If different room types need different volumes, list them; mixing flush sets across one order is normal but has to be planned at production.

4. Seat, lid and hardware specification

State whether seats are included in the quotation or excluded so you can source locally, and if included, give the material, hinge type and closing action you expect — soft-close is a common hotel choice because it reduces both noise complaints and lid replacement. For high-traffic public WCs, ask what the replacement seat is and how it attaches, because that determines whether maintenance staff can change one without tools.

5. Finish, branding and packaging

Colour and glaze choice, printed logos on cistern lids, private labelling and custom cartons fall under the custom furniture manufacturer and OEM service. Each has a different lead-time consequence, so specify them at enquiry stage instead of adding them after production starts. Packaging instructions matter for hotels too: if fixtures are delivered before the bathrooms are sealed off, ask for cartons that survive storage on site and label them by room number or floor.

6. Delivery destination, incoterms and phasing

Give the delivery address, the port if you are handling import yourself, and whether the order arrives in one shipment or in phases matching the construction programme. SANTERSON handles freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, so a phased schedule can be built into production planning rather than solved later by air freight. Confirm incoterms, duties and insurance for your specific country in writing — published service descriptions are not a substitute for an order-level agreement.

A quotation request you can copy

Subject: RFQ — 1038A two piece washdown toilet, [project name], [country]

1. Product: Two Piece Washdown Toilet 1038A, vitreous china, washdown flush.
2. Quantities: guest rooms ___ ; public WCs ___ ; back-of-house ___ ; matching bidets ___ .
3. Drainage: P-trap wall outlet 180 mm for ___ rooms; S-trap floor outlet 250 mm rough-in for ___ rooms. Drawings attached.
4. Cistern and flush: ___ (single / dual, top button / side lever). Local flush-volume requirement: ___ .
5. Seat: included / excluded; material ___ ; soft-close required yes/no.
6. Finish and branding: colour ___ ; logo printing yes/no; carton labelling by room number yes/no.
7. Delivery: destination ___ ; incoterms ___ ; one shipment or phased against programme ___ .
8. Please confirm the trap and rough-in dimensions on the technical drawing for this quantity, and state packing list, carton count and total volume.

How these fixtures fit a wider bathroom package

Hotels rarely buy ceramics one model at a time. Grouping your sanitary ware — WC pans, bidets, basins, counters and shower sets — with the vanities, mirrors, lighting and wall finishes from the same supplier means one set of drawings, one packing list and one inspection visit. That is how turnkey interior project solutions for hospitality projects work in practice: design consultation and space planning, material selection and product specification, manufacturing with quality control, then project management and site coordination through to handover.

It also simplifies the operating phase. When every fixture in a floor group comes from one production run, spare cistern covers, seats and flush mechanisms stay interchangeable across rooms for years, which is worth more to an engineering department than a marginally lower unit price on a single line.

Before you send the enquiry — check these six

  • Trap type and rough-in dimension are stated per room type, with drawings attached.
  • Quantities are split by location, not given as one total.
  • Cistern arrangement, flush type and any local water-volume requirement are written in the message.
  • Seat inclusion, material and closing action are decided.
  • Colour, branding and carton labelling instructions are stated up front.
  • Delivery address, incoterms and phasing are named, with a target on-site date.

Send that and the first quotation you receive is already comparable — same outlet, same flush set, same seat specification, same delivery basis. If any item is still open, say so in the enquiry and ask for it as a priced option rather than leaving the supplier to guess.

SANTERSON is a one-stop furniture and building materials supplier for hotel, villa and office projects, supplying ceramic sanitary ware alongside cabinetry, lighting, flooring and interior finishes. To request a quotation for the 1038A or to consolidate it into a full bathroom fixtures for hotel projects package, send your enquiry through the contact page.