A request for quote for grey minimalist cabinets often comes back with a single number and nothing behind it. That usually happens because the enquiry did not give the manufacturer enough to price against. Grey minimalist cabinetry is made to measure — finish, layout and dimensions are specified per project — so two enquiries that look identical on paper can carry very different costs once panel material, door construction and hardware are defined.

The checklist below covers what a buyer should settle before the enquiry leaves the office. Send this level of detail and you get quotations you can actually compare.

1. Project type, quantity and unit of measure

State whether the order is one villa kitchen, an apartment block, or a boutique hotel fit-out, and say how many sets or linear metres of run you need. Quantity decides the pricing tier and the production slot. Then state the unit you want quoted in — per set, per linear metre, or itemised by cabinet module. Quotations that use different units cannot be put side by side.

If the layout is not final, say so and ask for an indicative range together with the assumptions behind it.

2. Drawings or measured dimensions

Attach what you actually have: a designer's elevation, a CAD plan, a marked-up floor plan, or a site measurement sheet. For a minimalist kitchen the drawing should show base cabinets, wall cabinets and tall pantry or appliance housings as separate runs, with heights called out — including whether tall units run to the ceiling. Where drawings are not ready, give room length, wall lengths, ceiling height, and the position of windows, doors, sockets and existing services.

Mark which dimensions are fixed and which can move by a few centimetres. Scribe and filler panels are priced differently from cabinet modules, and an undeclared out-of-plumb wall is a common source of a variation order later on.

3. Panel material and surface finish

"Grey" is not a specification. These cabinets are offered in matte solid finishes, wood-grain effects and other surface options, and each behaves differently under kitchen use. In the enquiry, name:

  • the board or core material to quote, plus any grade requirement for your market;
  • the surface type — matte laminate, matte lacquer, acrylic, PVC wrap, or a wood-effect panel in a grey tone;
  • the grey reference: a RAL or Pantone code, or a photo of the sample you are matching, and whether a physical sample must be approved before production;
  • whether doors, carcasses and internal boxes are the same colour or different ones.

Ask the supplier to write the material and finish into the quotation. That one line protects you when comparing bids or reordering for a second phase.

4. Door style and handle treatment

Flat slab is the default in this category, but state which construction you want: flat panel with a handleless detail, recessed pull, or a visible handle in a named finish. Handleless work changes both the door build and the clearance needed at walls and appliances, so declare it up front. If you want touch-to-open on some doors only, list which ones — assisted opening is priced per opening, not per kitchen.

5. Hardware specification

Hardware is where a quotation looks cheapest and turns out most expensive. Specify hinges, drawer runners, lift systems, soft-close requirement, levelling legs, and any integrated bins or internal fittings, and say whether you want a branded hardware line or the supplier's standard range. If the project has a maintenance reality — hotel rooms turned over daily, rentals with tenant changeovers — mention it, because that points to heavier-duty runners and hinges.

6. Appliance integration and services

List every appliance to be built in: oven, steam oven, microwave drawer, refrigerator, dishwasher, wine cabinet, coffee machine. Give model numbers or at least cut-out dimensions, and say whether a tall housing is for a stacked pair. Integrated lighting belongs in the same list — LED strips under wall cabinets and lit glass display cabinets, with transformer positions and wiring runs shown on the drawing.

7. Countertops, splashbacks and adjacent trades

Make clear whether you are also asking for a stone worktop and splashback or whether another trade supplies them. If the cabinets must meet a worktop thickness already chosen, state that thickness. Note who cuts out for sinks and hobs, and whether the installer templates on site.

8. Delivery terms, packaging and site access

Give the delivery address, the Incoterms you want quoted (FOB, CIF or delivered to site), the destination port or city, and your preferred ship window. For apartments, mention lift size, stair width and any delivery-hour restriction — flat-packed cartons and assembled tall units are handled very differently on site. Ask how the cabinets are packed and how crates are labelled by room and run, because that decides how fast an installation crew can work.

9. Assembly, installation and after-sales scope

State whether you need flat-pack supply only, partly assembled units, or installation and after-sales support. Ask what is covered if a panel arrives damaged, how a replacement panel is ordered, and what the spare-parts route is for hardware. Those answers belong in the quotation, not in an email chain after award.

10. Commercial terms to ask for in writing

  • price validity period, and what triggers a re-quote;
  • payment stages and what is released at each stage;
  • production lead time, counted from approved drawings and an approved colour sample;
  • minimum order quantity for the finish you have chosen;
  • what happens to sample or tooling cost if you place a follow-up order;
  • whether OEM or private-label marking is available, and what it costs.

What a useful reply looks like

A competent response to an enquiry for custom minimalist kitchen cabinets restates your specification item by item, flags what is missing, and prices the alternatives you asked for — matte grey on one line, a two-tone grey scheme on another. Where we supply these kitchens the same sequence applies: brief and drawings first, then quotation with details confirmed, then production, shipment and follow-up. Ask for that structure and three quotations can sit side by side without anyone guessing what each one covers.

If you want a second opinion on a specification you already hold, send the current drawing and finish schedule and ask the manufacturer to mark up where it is unclear, or where a cheaper construction reaches the same visual result. That single pass usually removes more cost than a round of price negotiation.

Send your enquiryAttach drawings, the grey reference and your appliance list, and we will quote against that specification — including the alternatives worth pricing. Enquiries go through our contact page.