A folding door quotation only comes back accurate when the drawing behind it is complete. Glass folding doors sit at the awkward end of the joinery trade: they combine glazing, hardware, framing and an operating mechanism, and every one of those variables has to be settled before production starts. The brief below is the list we work from on our own Santerson Glass Folding Doors programme — send us what it asks for and the quotation, the drawings and the production slot all move faster.

Start with the opening, not the door

Send a dimensioned sketch of the structural opening: clear width, clear height and the finished floor level, plus whether the floor is timber, screed or tile over slab. Then state how the door has to behave — which leaf folds away first, where the stack parks when the door is open, and whether you need traffic through one of the leaves on a daily basis. That last point decides where the active leaf goes, and it is much cheaper to settle now than after the frames are machined.

Tell us what sits on both sides of the opening. A villa living room that opens onto a covered terrace behaves differently from a hotel function room dividing two banquet spaces, even when the two openings are identical in size. Airside and landside finishes, wall build-up and skirting details all affect how the frame is trimmed and where the track can be fixed.

Fix the layout before the finish

Our folding doors are made to measure rather than offered in set sizes, so panel count and leaf width follow from your opening and your preferred stack. Send us the number of panels you want and which side they fold to, and we will confirm whether the widths balance sensibly or need an unequal layout at one end.

Frame and glass are project choices, not fixed ones. Frame material and finish can be specified per project, and glazing type follows the use of the space. Where a folding door has to read as part of a fitted wall rather than stand out from it, our Santerson Wood Veneer Folding Doors option is usually the better starting point. For storage and service openings that need to disappear into joinery, Classic Folding Doors cover the same brief in a different register.

Send the reference pack

Two pages of drawings and one folder of references tell us more than a long email. Include:

  • a dimensioned plan and section of the opening, with the finished floor levels marked;
  • the interior design intent — mood board, finish schedule or a marked-up elevation;
  • photographs of the site condition if the doors are replacing an existing opening;
  • the room schedule or project name, so we can group the doors with the rest of your joinery.

If you are also ordering cabinetry, wall panelling or Glass Partitions for the same building, send those schedules in the same pack. Matching a folding door to adjacent joinery — same veneer, same shadow gap, same ironmongery family — is a coordination job, and it is far easier to handle as one order than as three.

State the delivery and installation assumptions

Tell us where the doors are going and how they should arrive. We arrange freight by sea, air or rail with the customs paperwork, packaging and container loading handled on our side, and door-to-door delivery arranged to site. For a villa in Melbourne or Sydney, for example, that means the doors land with the rest of the fit-out package rather than as an orphan shipment your site team has to chase.

Also confirm who installs. We provide on-site installation and inspection support on projects we supply, and we can work to a snag list at handover; some contractors prefer to fix our frames themselves with guidance from our drawings. Say which you want in the brief, because it changes how the frames are supplied and packed.

What comes back from us

Once the opening data, layout, finishes and delivery assumptions are in hand, we return a quotation with the configuration written out leaf by leaf, drawings for your sign-off, and a production slot. Nothing goes into manufacturing until you have confirmed the dimensions and the selected specifications on those drawings — that sign-off is what protects the site programme.

If you are assembling a doors-and-joinery package for a villa or hospitality project, our Turnkey Interior Project Solutions team can take the whole set as one scope. Send your opening schedule and design intent to us through the contact page, and we will come back with the configuration questions worth settling before production.