A pair of classic French double doors can carry the look of an entire room — the sightlines from a study into a living room, the separation between a villa entrance hall and a garden terrace. They are also one of the most unforgiving items in a joinery package. Because they work as a matched pair, hang on hinges under their own weight and meet at a centre rebate, an error that would be tolerable in a single leaf becomes visible the moment both leaves close.

SANTERSON produces these doors made to measure, with material, finish and layout specified per project. That flexibility is the reason to confirm details before production starts rather than after. The list below follows the order most buyers and contractors actually need it in: opening first, then leaves, then hardware, then finishes, then logistics.

1. The opening, measured for the pair — not for one leaf

Before anything else, agree who measures and what the number refers to. A finished opening, a structural opening and a frame outer size are three different dimensions, and mixing them up is the most common cause of rework.

  • Width and height at three points each — head, middle and sill for width; left, centre and right for height. Report the smallest reading alongside the nominal design size.
  • Square, level and plumb — a wall that is out of square changes the reveal on one side, and with double doors an uneven reveal reads as a defect even when both leaves are correct.
  • Floor finish levels — confirm the finished floor level on both sides of the opening. Undercut and clearance below the leaves depend on it, particularly where carpet, rug or tile thresholds sit in the doorway.
  • Wall build-up — plasterboard, render, stone or timber lining determines the architrave and casing profile and how much of the frame is returned into the reveal.
  • Swing direction and which leaf is active — state clearly which leaf opens first, which is the inactive leaf with the flush bolt, and whether the doors open into or out of the room, against furniture layouts and traffic routes.

2. Leaf construction, glazing and the classic profile

The Classic French Double Doors sit within a wider doors range that also covers arched and slim-frame styles, so it is worth confirming which profile the drawings actually show before quoting. Glazing bars, panel mouldings and the depth of the rebate all change with the style, and each has to be reproduced consistently across both leaves.

  • Leaf size and stile width — confirm the finished leaf width and height, and whether the meeting stiles are wide enough to house flush bolts cleanly.
  • Glazing layout — number of lights per leaf, bar spacing, bar width and whether bars are true glazing bars or surface-mounted mock bars. Both leaves must match exactly; a half-bar offset is obvious at eye level.
  • Glass specification — toughened or laminated where required by the position and use, plus clear, low-iron, reeded or patterned glass if the design calls for it. State visible light transmission needs only where the project has a stated requirement.
  • Core and substrate — solid timber, engineered substrate or a composite core affects weight, hinge loading and stability in changing humidity. Match the core to the opening's use rather than defaulting to one construction across a whole project.

3. Hardware schedule: hinges, bolts, handles, closers

Hardware is where specification documents are usually thinnest and where site problems concentrate. Send a written schedule with quantities, finishes and load ratings, and have it signed off before the leaves are machined — hinge pockets, bolt housings and lock prep are all cut to the selected items.

  • Hinge count and type — driven by leaf weight and height. Confirm bearing type, whether ball-bearing or lift-off, and the fixing pattern for the frame material.
  • Flush bolts, top and bottom — on the inactive leaf. Confirm rod length against the finished leaf height, and whether an astragal or rebater is required at the meeting edge.
  • Handles, pull plates and lock case — pair one active-leaf handle set with the correct latch and keep specification. Confirm lever or knob, backset and spindle size.
  • Closers and hold-open — where doors are required to self-close, confirm closer type and arm style early; surface-mounted closers change the appearance of a classic detail.
  • Finish consistency — specify hardware finish once for the whole door set. Mixed brass tones between handles on paired doors is a snag that only appears at handover.

4. Finish, colour and grain matching across the pair

Two leaves machined from different batches can take stain differently. Ask for both leaves, plus the frame and architraves, to be finished in one operation, and confirm the sample before production runs.

  • Approved physical sample — a small board is not enough for a stained or veneered door. Request a finish sample on the actual substrate and edge profile being used.
  • Grain direction — state whether leaves are book-matched or grain-run-the-same-way. Neither is wrong, but the choice has to be recorded before cutting.
  • Coating system — primer and topcoat system, sheen level, and whether the finish is applied in the factory or on site. Factory finishing gives a more even result on moulded and glazed details.
  • Adjacent joinery — if the doors are ordered alongside Classic Panel Hinged Doors, wardrobes or cabinetry in the same property, order them together and to one finish schedule so tones match across the joinery package.

5. Production documentation and sign-off

Before cutting starts, request a shop drawing that shows both leaves with dimensions, glazing layout, hardware positions and finish code, then confirm it in writing. A single marked-up drawing prevents most of the arguments described above from ever reaching site.

  • Dimensioned elevation of each leaf, plus frame and architrave sections.
  • Hardware schedule with finishes and positions marked on the drawing.
  • Finish code and approved sample reference recorded on the drawing sheet.
  • A named contact for production queries, and confirmation of what is included in the supply — leaves only, leaves and frame, or a fully assembled set with glass.

6. Packaging, shipping and site sequence

Glazed double doors are fragile and heavy, and they usually arrive late in a programme when there is no room for replacement. Confirm how the set is packed, glazed or dry-packed, and how it is identified so both leaves go to the same opening.

  • Left- and right-leaf marking on the packaging and on the frame, matched to the drawings.
  • Edge protection, corner protection and vertical or horizontal packing agreed with the freight method — sea, air or road for the project.
  • Delivery sequence relative to wet trades. Frames can be fitted early; glazed leaves are best installed late, after painting and flooring.
  • Storage conditions on site before installation — doors stored flat and dry, never leaning against a wall in a damp room.

A short pre-production checklist

  • Finished opening dimensions taken at three points, with floor finishes confirmed on both sides.
  • Swing direction and active leaf agreed against the furniture layout.
  • Leaf construction, glazing layout and glass type specified for each leaf.
  • Hardware schedule complete, with load ratings and one consistent finish.
  • Physical finish sample approved on the actual substrate, both leaves finished together.
  • Shop drawings signed off before cutting, with a named production contact.
  • Packing, marking and delivery sequence agreed for the project's freight route.

SANTERSON is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, with custom and OEM service covering bespoke dimensions, materials and finishes, plus logistics support through to door-to-door delivery. If you are specifying doors as part of a wider joinery package, the whole set can be produced and finished to one schedule. Send the room-by-room opening sizes, the door style reference and the hardware preference, and we will confirm what needs verifying before production.