A mirror cabinet looks like a small item on a bathroom schedule, until three rooms in the same project need different widths, two of them sit against tiled walls with pipes behind them, and the wrong door swing blocks a drawer. By the time those questions reach production, they cost rework, replacement shipments and a delayed handover. A clear specification written before ordering is what keeps a Standard Mirror Cabinet from becoming that kind of problem.

Below is the checklist we work from on residential and hospitality bathroom projects, room by room. Nothing here needs a specialist to complete — it needs someone on site with a tape measure and the drawings open.

1. Fix the reference before you fill in the blanks

Every line item should point back to one room, one wall and one dimensioned drawing. "Mirror cabinet, 800 mm" means nothing when the same code appears in a guest powder room and a master ensuite with different heights. Give each unit its own tag — level, room, wall face, elevation number — and let that tag carry through the schedule, the purchase order and the packing list.

For made-to-measure work this matters more than it does for stock items. Our mirror cabinets are built to project-specific dimensions rather than a fixed size grid, so a single unclear number in the schedule travels all the way into the carcass.

2. Dimensions: measure against finished surfaces, not structural ones

Record width and height as clear openings between finished wall faces, and state whether floor tiles, skirting, wall waterproofing or a tiled rebate are already included in the number. A cabinet ordered to a bare-wall measurement will not sit correctly once 10 mm of tile and adhesive is on the wall.

Then add the three numbers buyers usually leave out:

  • Projection from the wall. Carcass depth plus handle or knob clearance, measured against the mirror edge and any adjacent basin tapware.
  • Centre line of the waste and water supply. Especially where the cabinet drops below basin height or shares a wall with a shower valve.
  • Clear opening for doors and drawers. Door swing against the towel rail, the WC and the entry door — checked standing at the actual doorway, not on paper.

Where a vanity is involved, note which side of the basin the cabinet sits on and whether it must align with a countertop overhang. Our Single Vanity range is specified the same way, so the two schedules can be cross-checked against one elevation drawing instead of two separate documents.

3. Materials and finish: name what you actually need to match

"White" is not a specification. State the substrate, the surface material and the sheen, then say what it has to sit alongside — door frames, vanity carcass, skirting or wall panelling. If the cabinet must match an existing joinery item, send the physical sample or the existing product code rather than a photograph; screen colours shift between devices and under bathroom lighting.

Bathrooms are humid and frequently wiped down, so record two practical points alongside the aesthetic choice:

  • Whether the surface will be cleaned with ordinary household cleaners or something stronger, and how often.
  • Whether the room has mechanical extraction, a window, or neither — an unventuated ensuite is a different working environment from a ventilated family bathroom.

Mirror cabinets in this collection are offered with material and finish options chosen per project, so these details belong in the written specification rather than being decided on site.

4. Layout and internal configuration: write down what goes inside

Storage that matches how the room is used is easier to specify than storage left to the manufacturer. List what will actually live in the cabinet — daily medicines, hair tools kept out of reach, bulk toiletries, cleaning products — and let that drive the shelf plan:

  • Shelf count and whether shelves need to be adjustable or fixed at set heights.
  • Whether tall bottles must clear an internal shelf, which decides usable shelf spacing rather than overall height.
  • Whether anything needs a lockable compartment in a shared or guest bathroom.
  • Whether sockets for shavers or toothbrush chargers are required inside or behind the cabinet.

If one room needs more height than the standard layout allows, that decision belongs in the specification too. A Tall Mirror Cabinet solves a different problem from a wide low unit above a long vanity, and mixing them up is one of the more common schedule errors we see.

5. Mirror, glass and lighting: specify these separately

The mirror face and any glazing deserve their own line in the specification: mirror quality and edge finish, whether the glass is clear, tinted or frosted, and how the unit will be cleaned. Round and shaped formats change both the mirror cut and the carcass corners, so a Round Mirror Cabinet needs the diameter and the wall clearance noted explicitly.

If the unit is lit, do not leave lighting to the electrician's judgement. Specify:

  • Whether light is integrated into the cabinet or supplied by a separate fitting above the mirror.
  • The switch location — inside the cabinet, on the wall beside it, or shared with the room lighting circuit.
  • Where the driver sits and whether it must remain accessible for replacement.
  • The lamp colour temperature, so the mirror light matches the rest of the bathroom rather than fighting it.

Electrical details should be confirmed with your electrician against local wiring requirements before the order is placed. Lighting and electrical specifications are project-specific, and we need them in writing on the purchase order — not added after the carcass is cut.

6. Hardware, mounting and access

State the handle style or handleless profile, the hinge side for each door, and whether soft-close is required. Then record what the wall is made of — stud, brick, block, plasterboard over battens, or tiled substrate — because that determines fixings and whether any local reinforcement is needed behind the finished surface.

Also note where services run behind the intended fixing line. A cabinet hung directly over a shower pipe or an in-wall cistern needs either relocation or protective detailing agreed before installation day.

7. Put it all on one schedule, then confirm it once

A workable mirror cabinet specification fits on a single table per project, with one row per unit:

Field What to write
Unit tag Level / room / wall, tied to the drawing reference
Dimensions Width, height, projection — clear openings between finished surfaces
Substrate and finish Surface material, sheen, colour or sample reference, what it must match
Layout Shelves fixed or adjustable, drawer or door, lockable sections
Mirror and glazing Format, size, edge finish, glass type
Lighting Integrated or separate fitting, switch location, driver access, colour temperature
Hardware and mounting Handle type, hinge side, soft-close, wall construction, services behind the wall
Quantity and delivery point Per unit, per room, with site or store delivery noted

Send that table back to us for confirmation before production starts. We build to the numbers you supply; where a dimension looks likely to clash with a basin, a door swing or a tiled rebate, we will flag it at that stage rather than after the carcass is made.

Two specification errors worth avoiding

Specifying one room and assuming the rest follow. Identical layouts rarely have identical wall conditions. Plumbing offsets, tile thickness and ceiling heights vary floor to floor, so each unit earns its own row.

Treating made-to-measure as a licence to be vague. Custom sizing removes the size grid, not the need for exact numbers. If the measurement is uncertain, mark it as pending and hold the order — a corrected dimension before production costs nothing, and the same correction afterwards does not.

Where the whole bathroom fits together

Mirror cabinets rarely fail on their own; they fail where they meet the vanity, the lighting and the wall finish. Coordinating ceramics, vanities, mirror cabinets and Vanity Lighting against one set of elevations keeps those junctions consistent across rooms, and it is how we handle bathroom fit-out as part of a whole-project package rather than as isolated purchases.

If you have drawings ready, send them with the schedule and we will work from what your designer has already set out — dimensions, finishes and configuration confirmed in writing before anything enters production.