A swim spa on a hotel deck is not a single line item you can drop into an FF&E schedule. It is a piece of wet plant that touches structure, electrical distribution, waterproofing, mechanical services and daily operations at the same time. When the specification is settled early, the coordination is straightforward; when it arrives late in a fit-out, it turns into change orders. Outdoor Swim Spa WS-115EⅢ-U sits in the middle of our configurable swim and hydrotherapy range, and it is a useful example to walk through, because the questions a procurement team asks about this model are the same questions they should be asking about any spa they put on a guest level.

Confirm the model designation on your own documents

The catalog model name carries a Roman numeral suffix and a letter suffix. Both matter: within this series, variants with different lengths and pump counts are distinguished by those suffixes, and an enquiry that drops them can easily come back quoted against the wrong shell. Write the designation exactly as it appears on the product page in your FF&E schedule, your purchase order and your drawing annotations, and check that the three documents agree before anything is ordered.

Start with the footprint, not the finish

The catalog envelope for this model is 5280 × 2200 × 1250 mm. Treat those three numbers as a starting constraint rather than an approval. On a rooftop terrace or podium deck, the shell usually arrives in sections and is assembled on site, so the practical question is not only whether the finished spa fits inside the balustrade line, but whether every component can travel the route it will actually take: goods lift dimensions, stair widths, crane pick radius, slab loading during assembly, and the working clearance your installers need around the shell while the pipework and control system are connected.

Before you confirm a location on the drawing, ask three things of the design team:

  • The finished level of the deck, so the coping height and access steps can be resolved rather than guessed on site.
  • Whether the substrate is structural or a build-up over waterproofing. A spa sitting on a protected membrane needs a load-spreading arrangement agreed with the structural engineer, not decided by the tiling subcontractor.
  • Where plant access will come from after handover. Pumps, filtration and the control system need to remain reachable for routine servicing without removing finishes.

Read the specification as a configuration, not a fixed product

The figures published on the product page describe one defined build:

ModelWS-115EⅢ-U
Catalog dimensions5280 × 2200 × 1250 mm
Jet total24 pcs
Water pump3 pcs
Filter pump1 pc
LED lights2 pcs
Control system1 set
Total power9.65 kW
Features shownWater jets, LED lighting, Ozone

Two of those lines matter more to a hotel operator than they first appear. The connected load is 9.65 kW for the build as listed, and that number moves when options are added — heat pumps, additional water pumps, UV sterilisation and sand filtration all change both the electrical distribution and the switchroom schedule. Confirm the final configuration with us before the electrical contractor freezes riser sizes and breaker schedules; a swim spa is one of the few guest-facing items where an undersized supply becomes a permanent operational problem rather than a cosmetic one.

The second line is ozone. Water treatment on a commercial installation is governed by local public-health requirements for bathing water, and those rules vary by jurisdiction. The catalog lists ozone as a shown feature; it does not tell you what your inspector will require in terms of secondary disinfection, dosing, turnover rate or water testing. Put that question to the local authority and the mechanical engineer early, then match the treatment package to the answer instead of assuming the standard build is compliant.

The published figures above describe one catalog configuration. Optional accessories listed in our range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model, so confirm the exact equipment list and electrical requirements for the build you are ordering.

Size against how the spa will actually be used

The 5280 mm length gives a comfortable hydrotherapy and relaxation pool, but it is not the only option in the range if your programme calls for something different. The shorter Outdoor Swim Spa WS-115AⅢ-U has a catalog envelope of 3880 × 2200 × 1250 mm, which suits a tight terrace or an indoor wellness room where the deck depth is limited. Its listed build carries four water pumps, one filter pump, twenty-three jets and a connected load of 11.85 kW — so a smaller shell does not automatically mean a smaller power draw. Compare configurations line by line rather than assuming that length drives load.

For a hotel, decide first what the spa is being asked to do:

  • A recovery and wellness amenity for guests after travel or training — jet count, seating position and water temperature control matter more than length.
  • An evening feature that extends terrace spend — lighting, water features and sightlines from the bar or lounge drive the decision.
  • A lap or training facility — then look at the longer layouts in the range before committing to a 5-metre shell.

That decision changes the equipment list, so make it before pricing rather than during value engineering.

Coordinate the interfaces on paper before production

The interface list below is what we ask a project team to close out in writing. Every one of these items has caused rework somewhere when it was left open:

  • Structure. Point loads and the assembled weight, including water, confirmed by the engineer for the actual deck condition.
  • Electrical. Supply capacity, protective device sizing, dedicated isolation, and a route for the control wiring that survives future maintenance.
  • Waterproofing. Penetration details, upstands and drainage falls resolved with the membrane installer, not after tiling.
  • Drainage and overflow. Drain connection, overflow route, and where discharge is permitted on site.
  • Finishes. Coping material, step detail and colour match to surrounding paving, agreed from a sample.
  • Delivery and access. Container size, unloading method, crane or goods-lift booking, and the installation sequence.

We work as a one-stop furniture and building materials supplier, so the same team that supplies the spa is also supplying surrounding outdoor furniture, wall and ceiling finishes, bathroom fixtures and joinery on many of our projects. That matters operationally: one coordinated package with a single set of drawings, one production schedule and one shipment is far easier to run on site than six separate suppliers each issuing their own dimensions. Our Custom & OEM Service covers bespoke sizing, finishes and material choices where a standard catalog dimension does not suit the deck, and our Logistics & Door-to-Door Delivery service handles freight forwarding, customs documentation and container loading planning.

What to send us for a quotation

A meaningful price comes back faster when the enquiry already contains the answers. Send:

  • Location type and level — rooftop, podium, ground terrace or indoor.
  • The available opening and access route, with photographs if the site is already built.
  • Intended use and expected guest load, so jet layout and treatment capacity can be sized honestly.
  • Any local bathing-water or public-health requirement you have already been given.
  • Target handover date, which drives whether a standard build or a custom configuration is realistic.

Send those details through our contact page and we will confirm the equipment list, connected load and delivery plan for your specific installation before anything goes into production.