A set of sliding panels can open up a villa living area, hide a working corner in a bedroom, or divide a hospitality lounge into bookable spaces. The difference between a wall that glides cleanly for years and one that binds, sags out of plumb or arrives the wrong size is almost never the panel itself. It is the installation plan behind it. If you are specifying Santerson Partition Sliding Systems for a residential or project interior, here is what that plan should contain before anything goes into production.
1. Measured drawings, not catalogue sizes
Partition sliding systems in the Santerson Sliding Panel Systems collection are made to measure: sizing, layout, material and finish are set per project rather than picked from a fixed size grid. That flexibility only pays off if the dimensions reaching the factory are trustworthy.
- Overall opening width and height at several points along the run — floors, ceilings and reveals in older villas and renovated properties are rarely square.
- Floor-to-ceiling clear height, plus any skirting, cornice, coving or threshold that the panels must clear or overlap.
- Position of switches, sockets, radiators, air diffusers, lighting drops and door openings within or beside the run.
- A tolerance note stating which elements are fixed on site and which can be adjusted by the fit-out team.
Send the same measurement sheet to the supplier and to the site contractor. When both parties read one drawing, dimension disputes stop being a surprise discovered on installation day.
2. Track, hardware and opening specification
The listing for these systems is deliberately configurable, so the plan has to state the mechanism as clearly as the appearance. Confirm with the supplier before production:
- Track type and whether it is ceiling-mounted, wall-mounted or recessed into a built-in structure.
- Number of panels, stacking direction, and where the stack parks when the system is open.
- Hanging hardware, bottom guide or floor track arrangement, and stop positions at each end of travel.
- Opening dimensions for each configuration — full clear span, partial opening, or a fixed bay plus sliding bays.
- Whether an acoustic panel configuration is required, and what performance the selected build is intended to deliver for that space.
Where a project mixes systems — for example sliding panels alongside wooden sliding doors or a sliding panel TV wall — record each system separately with its own hardware schedule. Grouped items get mis-specified.
3. Substrate and structural checks
Sliding panels are only as good as what carries them. The installation plan should record what the track will be fixed to and who prepares it.
| Condition to check | Why it belongs in the plan |
| Ceiling or head structure behind the track line | Solid fixing detail differs between timber framing, steel, concrete and plasterboard voids; blocking or inserts must be installed before finishes close up. |
| Floor level along the run | A floor track or bottom guide set on an unlevel screed will bind; note the acceptable deviation and who corrects it. |
| Finished floor level and threshold detail | Determines panel height and whether a recessed sill, continuous track or surface guide is used. |
| Wall and ceiling finishes at the run | Painting, plaster repair and wall panel systems must be sequenced around track installation, not after it. |
| Access for panels on delivery day | Full-height panels need a clear route — lift size, stairwell turning space and door widths are common project blockers. |
Assign each of these to a named party in the plan: supplier, main contractor, or fit-out crew. Unassigned checks are the ones that get missed.
4. Finish, material and sample sign-off
Because finish and material options are project-specific, the plan should carry a written approval record: the selected board or panel material, surface finish and texture, edge detail, handle or pull arrangement, and any glass element in an glass sliding panel configuration. A signed sample reference — with the project name on it — protects both sides when panels arrive for a villa bedroom, a penthouse living wall or a hotel lounge.
Also note in the plan which finishes need protection during other site works, and whether panels are installed before or after flooring, lighting and final decoration.
5. A sequenced installation programme
Write the sequence into the plan so every trade knows its slot:
- Site re-measure and sign-off of final dimensions after wet trades and floor finishes are complete.
- Preparation of head structure, blocking and floor level; setting out of track line with a marked datum.
- Delivery window, storage location on site, and protection plan for the panels.
- Track installation and alignment check before panels go on.
- Hanging, adjustment of alignment and travel, then final cleaning.
- Snag inspection with a written list, handover of adjustment instructions, and the after-sales contact route — Santerson lists installation and after-sales support as part of its project services.
For projects handled through turnkey solutions, this sequence sits inside the wider workflow the company describes — consultation, design and planning, production, logistics, installation, after-sales — so panel installation is coordinated with cabinetry, doors and other built-in joinery rather than booked as an isolated job.
6. Documentation that should travel with the order
- Dimensioned elevation drawing of the complete run, marked with panel numbers and stacking order.
- Hardware schedule: track, hangers, guides, stops, pulls, and quantities.
- Material and finish approval sheet with sample reference.
- Site condition record: what was checked, by whom, and the date.
- Handover sheet listing adjustments made, snag list, and warranty or support terms as confirmed for that order.
None of this paperwork is exotic. It is simply the evidence that lets a second installer, a site supervisor in another country, or a maintenance visit months later understand what was built and why.
Common gaps worth avoiding
- Ordering from nominal sizes. Configurable systems are built to the numbers supplied; a copied catalogue dimension becomes an opening that no longer fits.
- Leaving acoustic intent vague. If sound separation matters, state it in the brief and confirm what the selected configuration is specified to do — performance depends on the build, not the product name.
- No stacking plan. Panels that park in front of a light switch or block a doorway are a layout problem visible on any drawing if someone looks first.
- Installing before the floor is level and finished. Everything downstream inherits the error.
Santerson works with project clients on made-to-measure built-in joinery, doors and wall systems alongside furniture and building materials, with custom and OEM service, logistics and site coordination listed among its services. If you are planning sliding panels for a villa, apartment or hospitality interior, send your drawings and site conditions early — the specification conversation is far cheaper before production than after it.