A request for quote that only says “pocket doors, supply and install” will come back with a price you cannot compare. Two suppliers can quote the same opening and mean very different things: one includes the pocket lining and the sliding hardware, the other delivers a loose leaf and expects your builder to source the rest. If you are sourcing Classic Pocket Doors for a villa or apartment package, the quality of the quotation you receive depends almost entirely on how much of the assembly you describe in the enquiry.
Pocket doors are an assembly, not a single item. The visible leaf is only one part; the frame that sits inside the wall cavity, the track and rollers above the opening, the floor guide, the architraves and the finish detail all have to be agreed before anyone can price the job honestly. The checklist below covers what to put in your RFQ so the quotation you get is a complete one.
1. Openings, dimensions and quantities
Send an opening schedule rather than a total floor area. For each door position list the clear opening width and height, the wall thickness (finished, including plasterboard or render), and the quantity of leaves — single leaf or double leaf. Note the floor finish build-up at the threshold if the door is to sit over tile, stone or timber, because that changes the bottom detail.
State the head height available above each opening. A pocket needs somewhere for the leaf to travel into, and a low ceiling or a beam crossing the wall will change what can be supplied. If you have drawings, send the door schedule and the relevant wall sections; if you do not, say so, because the supplier then knows to ask for measurements before quoting.
2. The pocket lining: supplied or site-made
This is the most common gap between quotations. Specify whether you want the pocket lining frame included in the supply, or whether your builder will form the cavity pocket on site with their own framing. A supplier who includes the lining can guarantee that the leaf, frame and track work together; a supplier quoting only the leaf is pricing something different.
Also confirm what goes into the wall finish. If the door is meant to read as part of the wall — flush with the panelling rather than standing out in a casing — say so at RFQ stage, since that affects the frame detail and how the architrave is handled.
3. Hardware and operating detail
List what you expect to be included: top track and rollers rated for the leaf weight, bottom guide or floor track, the pull handle or recessed finger pull on both sides, door stops and any bumper. Then state the operation you want — hand-operated only, or provision for a motorised operator, which needs a power point inside the wall and should be decided before the cavity is closed.
For bathrooms, pantries and study nooks, ask whether a soft-close or catch mechanism is available for the specification you have chosen. Ask the supplier to show you the hardware they intend to use, not just to write “hardware included” on the quotation.
4. Material, finish and how it matches the rest of the joinery
State the leaf construction you want and the surface finish. The Santerson pocket door range is made to measure with material and finish options, so an RFQ can name a specific direction: Santerson Wood Veneer Pocket Doors where the leaf needs to match veneered wardrobes or wall panelling in the same room, or Santerson Glass Pocket Doors where a glazed leaf is wanted for a study or dressing area. Classic profiles suit panelled and traditional interiors.
If the doors have to match existing or specified joinery, send the finish reference — veneer species, lacquer sheen, paint colour code or a sample photograph taken in daylight. A quotation that says “finish to be confirmed” is not finished; ask for the finish to be named on the priced document.
5. Interface with walls, floor and services
Tell the supplier what the pocket wall is built from — masonry, timber stud, or steel framing — and whether any pipework, cabling or ducting runs through the cavity behind the pocket. A pocket that crosses a service run needs coordination with the trades who own it, and this affects both the lining detail and the sequence on site.
Also state who is responsible for the wall closure, making good, painting and architraves after the pocket frame is installed. Leaving that out of the quotation is how a “complete” price turns out to be incomplete.
6. Packaging, delivery and site logistics
For imported packages, ask the supplier to state how the doors are packed and protected for ocean freight, and what the delivery terms are to your site or port. Give the delivery address, access conditions, and whether the goods must arrive in a particular sequence — pocket frames usually need to be in the wall before the finishes go up, so a late frame stalls plasterboard, paint and flooring behind it.
Ask for the packing list format at quotation stage. Knowing how many cartons, their dimensions and weights lets your site team plan storage and lifting before the truck arrives.
7. Lead time, milestones and after-sales
Ask for the lead time in stages: drawing approval, production, and dispatch. Ask what has to be signed off by you before production starts, since a made-to-measure door cannot be revised once cutting begins. Then ask what happens if a leaf arrives damaged or a hardware part is missing — replacement terms, who pays freight, and how quickly spares can be sent.
Where the same supplier is providing other joinery for the project — wardrobes, vanities, panelling — say so in the RFQ. Doors specified alongside the rest of the fit-out are easier to keep consistent in finish and easier to coordinate on site.
A short RFQ checklist
- Opening schedule: width, height, wall thickness, single or double leaf, quantity per position
- Floor build-up at threshold and available head height above the opening
- Pocket lining frame included in supply, or formed by your builder on site
- Hardware list: track, rollers, bottom guide, pulls both sides, stops, soft close, motor provision
- Leaf material and named finish, with reference samples where matching is required
- Wall construction and any services running through the pocket cavity
- Division of responsibility for wall closure, making good, architraves and painting
- Packaging standard, delivery terms, site access and required delivery sequence
- Lead time by stage, approval milestones, and replacement or spare-parts terms
Send that much information and the quotations you receive can be compared line for line. Send less, and you will compare a complete price against an incomplete one.
SANTERSON manufactures made-to-measure pocket doors, wardrobes and interior joinery for villa, hospitality and apartment projects, with production coordination, door-to-door delivery and installation support. Send us your door schedule and finish references and we will price the full assembly — leaf, lining and hardware.
Phone / WhatsApp: +86-13928214007 (PHILLIP) | Email: santerson@qq.com | Contact us