A swim spa sits somewhere between a pool and a spa on the specification sheet, which is exactly why quotations for them so often come back wrong. Two buyers can ask for the same model and receive prices that differ by a wide margin, because one of them quietly included a heat pump, insulation and steps in the enquiry while the other did not. If you are preparing an enquiry for our Outdoor Swim Spa WS-PC08ST, the quality of the answer you get depends almost entirely on how much usable detail you hand over first.

This guide walks through what a complete request for quote should contain, using the WS-PC08ST as the worked example, so that the number you receive is one you can actually compare against other offers.

Start With the Model Reference and the Shell Size

Name the model exactly as it appears in the catalogue. For this unit that is Outdoor Swim Spa WS-PC08ST, listed in our swimming pool range at 8000 × 2400 × 1470 mm. Shell length matters more than it looks: an eight-metre hull has to clear door widths, stair turns and the access route from the street to the final position, and on a tight site that single decision can change the crane or rigging line in your quotation. State the intended finished location, whether that is a villa terrace, a resort garden or a rooftop setting, and confirm the floor or deck structure that will carry it.

Also tell us whether you want only this model or are still weighing sizes. Our swimming pool category covers a spread of lengths and configurations, so if the 8 m shell is too long for your site we can price a shorter alternative in the same enquiry rather than making you start again.

List the Standard Equipment You Expect to See Priced

The catalogue entry for this model shows water jets, LED lighting, ozone and a swim training system. When we prepare a quotation we work from that equipment list line by line: one control system, one swim training unit, one filter pump, six jets in total, four LED lights, and a total power figure of 6.55 kW. Those items are the baseline, but a quotation is clearer when you confirm you want them included rather than assuming they are.

Two lines on that list deserve a direct question back to us. The catalogue shows "Not listed pcs" against the water pump, so ask explicitly which pump is being quoted and at what flow. And because the total power figure drives your electrical design, ask for the supply requirement — single or three phase, voltage, and whether the isolator and protection sit with us or with your electrician.

Separate Options From Base Price

Optional accessories are where quotations diverge most. The options catalogued for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Not every option fits every model, so the safe approach in your request is to list what you want quoted as a numbered add-on schedule with a price against each line, instead of asking for one bundled figure.

  • Heat pump — specify whether year-round use is intended. A spa used in winter has very different running and insulation requirements from one used only in warm months.
  • Insulation — ask which parts of the shell and pipework are insulated, since this affects both energy loss and the cabinet finish.
  • Filtration — confirm whether the quoted filter pump is sufficient for your usage pattern, or whether sand filtration should be added.
  • Steps and access — state which side the entry will be on once the unit is positioned, otherwise the steps may be quoted for the wrong elevation.
  • Water features and lighting — confirm the number and position of LED points against your night-time design intent.

Give Us the Site and Services Information Up Front

A swim spa is not a piece of furniture that simply arrives on a pallet, so the site conditions belong in the request. Include the delivery address with the access route described; the ground-bearing or deck arrangement; where the power supply will terminate; how the unit will be filled and drained; and whether a drainage channel or pump pit is part of your builder's scope. If the installation is part of a wider fit-out, say so — coordinating a spa with the services we provide on other project elements is far easier to arrange at quotation stage than after an order is placed.

For hospitality and resort buyers, add the usage profile: expected daily occupancy, whether guests use it unsupervised, and any housekeeping or maintenance routine your operator already runs. That information changes what we recommend for filtration and sanitisation, and it keeps the specification defensible when your operator takes over.

Ask For the Commercial Terms in Writing

The commercial section of a quotation is where buyers most often accept vagueness. Your request should ask for each of these as separate items:

What to require from every supplier

  • Delivery term and Incoterm, with the named place — not simply "door to door".
  • Packing description and the container type and count the shipment will need.
  • Validity period of the quoted price, in days.
  • Payment schedule tied to milestones you can verify.
  • What is covered after delivery, and what is expressly excluded.
  • Lead time from confirmed payment to dispatch, stated as a range if necessary.

Ask the same questions of every supplier and the comparison becomes mechanical rather than guesswork. Where a supplier will not commit in writing, treat that line as unpriced risk rather than a saving.

What We Need From You to Price This Model

Send the model reference, the site address and access notes, your required option schedule, the intended usage pattern, and the electrical and drainage arrangements as far as your designer has settled them. With those details we can return a quotation that lists base unit, options and delivery separately, which is what you need for an apples-to-apples comparison.

If your project also covers outdoor furniture, wall finishes, lighting or bathroom fixtures alongside the spa, tell us in the same enquiry. As a one-stop furniture and building materials supplier, we regularly consolidate several trades into one shipment for villa and hospitality projects, and consolidating early avoids the split deliveries that inflate landed cost.

One note on figures: dimensions, jet counts and power ratings quoted above are the values published in our catalogue for this model. Where your site conditions depend on a specific number — particularly electrical load and shell length — we will confirm it against the configuration actually being manufactured before production begins.

Send your enquiry through our contact page, and include the model reference in the subject line so it reaches the right desk without delay.