A ten-metre swim spa is not a single item you add to a purchase order. It is a small plant: a shell, pumps, jets, lighting, an ozone system and a power supply that all have to reach the same site, in the right sequence, and connect to a deck built to receive them. The Outdoor Swim Spa WS-130BⅢ-U is one of the longer configurations in our swim and hydrotherapy range, and it is exactly the kind of product where quantity planning and coordination decide whether installation runs smoothly or stalls on site.

The figures below are transcribed from the published catalogue entry for this model. Final equipment lists, dimensions and electrical requirements must be confirmed against your selected configuration before ordering.

What the WS-130BⅢ-U includes

The catalogue records this model at 9950 × 3000 × 1430 mm — a footprint just under ten metres long and three metres wide. That one line drives most of the planning that follows: transport route, lifting and access, deck width, and how much clear space remains for everything else on the poolside.

  • Control system: 1 set
  • Water pump: 4 pcs
  • Filter pump: 1 pc
  • Jet total: 23 pcs
  • LED lights: 5
  • Total power: 11.85 kW
  • Features shown in the catalogue: water jets, LED lighting, ozone

Two details matter more than they first appear. A swim training system is not listed for this model in the captured specifications, so if a buyer expects continuous-swim resistance here, that has to be raised and documented rather than assumed. And four water pumps plus a filter pump at 11.85 kW total is an electrical load, not a plug: the confirmed equipment list needs to reach the electrician before cable sizing, protection and any dedicated circuit are settled.

Step 1: turn the layout into a bill of quantities

Work from the finished drawing, not the brochure. Mark where the spa sits, where bathers enter, where steps will go, and what has to be built or cleared before delivery. Then split the order into three columns.

  • Core unit — one WS-130BⅢ-U shell with cabinet, control system, pumps, jets, LED lighting and ozone as specified.
  • Catalogue options for this range — heat pump, UV sterilisation, additional water pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is checked item by item.
  • Site-side items supplied locally — structural support, power feed, drainage, deck finishes and access for installation. These never appear on our packing list, which is exactly why they belong on your sheet.

For a private villa the quantity question is usually simple: one unit plus the options you want. For a resort, club or multi-villa development it becomes a batch question — identical specification across units, staged delivery so nothing sits in storage, and one spare-parts list covering the whole set.

Step 2: coordinate the spa with the rest of the deck

A swim spa is used as part of an outdoor room, so the surrounding products need specifying at the same time. Loungers, shade and paving all sit within metres of the shell, and a late change in any of them can block installation.

Where seating lines the deck, the Aluminum Sling Sun Lounger Collection is a practical companion: textilene mesh that dries quickly after splashing, aluminium frames treated for chlorine and coastal air, and static, wheeled or folding base versions to suit the layout. Count loungers against the deck depth left over once the spa footprint is fixed, not before.

Where the brief calls for a hydrotherapy feature that follows the shape of a terrace instead of a standard rectangular shell, we also produce customised-shape outdoor spas in square, round, oval and curved forms. Choose one approach early: a shaped spa changes structural support and deck geometry, so switching to it late is costly.

Keep the wider poolside package in the same specification file — outdoor furniture, shade structures, and the swimming pools and swim spas already on the project list. One document, one revision number, one set of quantities.

Step 3: fix the interfaces before production starts

  • Structure — confirm finished floor level and the bearing arrangement under the full shell, with catalogue dimensions re-checked on site.
  • Power — give the electrician the confirmed equipment list and total power figure for your configuration rather than a brochure page.
  • Access — measure gates, corners and overhead clearance against the unit length; a shell of this size cannot turn a corner drawn for a truck.
  • Sequence — deck, power and drainage complete before the spa arrives, with installation booked to the delivery date rather than after it.

Step 4: put delivery and support in writing

Quantities only help if the goods land where you planned them. We arrange freight forwarding, export paperwork and door-to-door delivery, so the receiving team knows the date and what is in the container. Import terms, duties and transit arrangements for a particular destination are confirmed case by case with your own broker or agent.

When a project needs more than one product line — the spa plus turnkey villa or hospitality furnishing, outdoor furniture and interior fixtures — coordination gets easier if one supplier holds the whole specification. Where the design calls for non-standard dimensions or finishes, our custom and OEM service covers bespoke material choices and prototyping; check current options and minimum order quantities for your project.

A checklist before you place the order

  • Model code on the purchase order matches the configuration agreed in writing — WS-130BⅢ-U and its sibling variants look similar on a drawing.
  • Pump count, jet count, LED count and total power taken from the confirmed specification, not from an earlier project.
  • Every option — heat pump, UV sterilisation, insulation, steps, sand filtration — listed with quantity and a compatibility note.
  • Site-side scope named and assigned to a trade, with completion dates ahead of delivery.
  • Deck seating and shade counted against the space remaining after the spa footprint.
  • One revision-controlled specification shared by supplier, builder, electrician and installer.

Send us your layout and product list for the WS-130BⅢ-U and we will return a confirmed equipment schedule, an option list checked against the model, and a delivery plan your site team can build to.