A buffet cabinet looks simple on a drawing: a low storage unit against the dining wall. On site it is one of the most complained-about pieces in a residential fit-out, because dimensions drift by a few centimetres, the finish does not match the kitchen cabinetry, and the interior layout never fits what the owner actually stores. If you are sourcing from SANTERSON, the difference between a smooth delivery and an expensive rework usually comes down to what you confirm before the order is placed. Below is the checklist we walk project clients through for Santerson Buffet Cabinets.
1. The dimension sheet, not the catalogue image
Buffet cabinets in this range are supplied with made-to-measure sizing, which means width, height and depth are yours to set. Do not start from a photo. Start from a site measure taken after the floor and wall finishes are known.
- Total external width and height, measured at three points along the wall — walls are rarely straight over a 2 m run.
- Clearance depth: cabinet depth plus the door or drawer travel, plus walkway behind someone seated at the dining table.
- Obstructions drawn to scale: skirting boards, architraves, light switches, wall sockets, radiators, return air grilles and downlights on a ceiling soffit above the unit.
- Floor levelness across the run. A low cabinet shows an unlevel floor far more obviously than a tall one.
- Whether the unit is freestanding or recessed into a niche, and whether it must sit flush with adjacent joinery.
If the buffet has to line up with custom built-in kitchen cabinets in an open-plan kitchen and dining area, put both items on one dimension drawing before either is quoted. Matching carcass heights, worktop returns and door reveals is a drawing exercise, not something to resolve on site.
2. Layout and interior configuration
A buffet cabinet earns its place by what it hides. Decide the contents first, then let that drive the layout — shelves sized for dinnerware stacks, drawers for cutlery and linens, an open niche for a coffee machine, concealed compartments for bottles.
- Fixed versus adjustable shelving, and shelf depth at each position.
- Drawer bank or doors: soft-close hardware on both, and drawer runner load rating for heavy stoneware.
- Glass-front sections. If you want display storage rather than concealed storage, the glass front dining cabinets in the same collection are configured the same way and can be specified alongside the buffet.
- Tall storage next to the low unit. Where ceiling height allows, a tall dining cabinet absorbs the items a low buffet cannot hold — trays, serving platters, table linen.
- Wall-mounted alternatives. In tighter rooms, wall mounted sideboards free up floor area and simplify cleaning beneath; they need a solid wall substrate and a fixing detail agreed before the wall is closed up.
- Traditional details. If the design calls for moulded panels or classic proportions, classic sideboards cover that language within the same collection.
Ask for an interior elevation showing every shelf, drawer and opening dimension. That single drawing settles most later disputes.
3. Materials and finish confirmation
Material and finish options are specified per project, so the sample you approve becomes the contractual reference. Confirm in writing:
- Carcass material and door material — they are not always the same board.
- Finish type and sheen: matte, high gloss, lacquer, veneer or wood-effect. State the sheen band, not just "matte".
- Edge treatment on visible edges, including abs or matching-veneer edge banding, and whether edges are eased.
- Veneer direction, grain match between doors, and any book-matching you expect.
- Hardware brand, model and finish — handles, pulls, integrated profiles, hinges and runners.
- Worktop or top panel material if the buffet carries a stone or engineered-stone top, including the edge profile and thickness.
Order a physical sample of the door, not just a colour card, and check it against your flooring and wall finishes under the actual room lighting. A finish that reads warm in the showroom can go grey next to dark timber flooring.
4. Integrated lighting and services
Buffet cabinets are frequently backlit or lit internally, and this is where late coordination causes the most rework.
- Internal cabinet lighting: strip position, warm-white temperature, and whether the driver sits in an accessible location.
- A power point inside or behind the unit for a coffee machine, wine fridge or display lighting — positioned on the drawing, not left to the electrician.
- Switch or sensor type, and where it is reachable from the dining side.
- Cable routes and any cut-outs in the carcass, confirmed before production so the wiring is not drilled on site.
Where the design extends into a full wall of joinery with lit niches — as in the dark wood minimalist home project, where a wall-mounted sideboard is paired with floating shelves and concealed linear lighting — the electrical plan and the cabinet shop drawing have to be issued together.
5. Sizing against the room, not the model number
Because these units are made to measure, there is no fixed size list to compare between projects. Use the room instead:
| Room condition | What it dictates |
|---|---|
| Dining wall under 2 m clear | Keep depth shallow, prefer doors over drawers, and consider a wall-mounted unit to preserve floor line. |
| Open-plan kitchen and dining | Carcass height, top material and door profile should match the kitchen run; issue one drawing for both. |
| Room used for entertaining regularly | Prioritise drawer storage and an open service niche with power; avoid all-shelf interiors. |
| Display pieces to be shown | Glass-front section with internal lighting, plus concealed storage for everyday items in the same unit. |
| Uneven or finished-late floors | Adjustable feet and a scribe/toe-kick detail agreed on the drawing. |
6. Sampling, prototyping and approval stage
For one-off or low-volume bespoke work, ask what can be reviewed before full production: a door sample with the real finish, a hardware mock-up, and a signed shop drawing. Where a project needs design development from scratch, SANTERSON's custom and OEM service covers bespoke design and prototyping, material and finish selection, and private-label options — useful when a developer wants the same buffet detail repeated across units.
Get sign-off recorded against a drawing revision number. When a change comes later — and it usually does — the revision number is what makes the variation cost legible.
7. Packaging, freight and site access
Custom cabinetry fails most often at the handover between the factory and the building. Confirm before production:
- Whether the unit ships assembled or in flat-packed sections, and which sections are one piece.
- Packaging specification and protection for glass fronts and stone tops.
- Freight mode and documentation — SANTERSON's logistics service covers sea, air and rail forwarding, customs paperwork and door-to-door delivery, so agree the delivery address, Incoterms and who handles import clearance for your site.
- Site access: lift dimensions, stair turns, corridor widths and the delivery window. A one-piece carcass that cannot reach the dining wall becomes a field-modification job.
8. Installation, inspection and after-sales
- Who installs: your local crew or the supplier's installation support, and who is responsible for levelling, scribing and making good.
- A snag list checked against the approved drawing at handover — door alignment, gap consistency, drawer runners, lighting function.
- What is covered for hardware replacement, and how spare parts are ordered for a project where several identical units were supplied.
- Care instructions for the specific finish, in writing, before the client takes over.
For multi-unit residential work, order one unit first and inspect it before releasing the balance. That single step has saved more budget than any price negotiation on these items.
Frequently asked questions
Do Santerson buffet cabinets come in standard sizes?
No. The collection is supplied made to measure, so dimensions, layout and finish are set per project. Work from your own site measures rather than a model list.
Can the buffet match my kitchen cabinetry exactly?
Yes, provided both are specified together. Confirm carcass height, door profile, edge treatment and finish sheen on one drawing, and approve a physical door sample before production.
Can I add internal lighting and a wine fridge?
Yes, if the electrical points, driver location and cut-outs are shown on the shop drawing before manufacturing. Add them to the cabinet drawing rather than leaving them to the site electrician.
What should I check when the delivery arrives?
Check packaging integrity, count sections against the packing list, verify the finish sample reference on each door, and confirm overall dimensions against the signed drawing before installation begins.
Before you send your enquiry
Attach three things and most of the back-and-forth disappears: a dimensioned elevation of the dining wall, a finish direction with two or three reference images, and a list of what the cabinet must store. With those, the buffet cabinet enquiry can move straight to configuration and quotation instead of another round of measuring.