A swim spa is one of the few items on a villa or resort project where the quotation you receive has to match the slab, the power supply and the local climate all at once. That is why enquiries for Outdoor Swim Spa WS-PC07A-T rarely stop at a price per unit. The information you send in the first message decides whether you get a usable, comparable quotation or a number that changes twice before production starts. Below is what to prepare, what we confirm at each stage, and what a complete quotation should contain.
What WS-PC07A-T Covers Before Any Options Are Added
WS-PC07A-T sits in our configurable outdoor swim and hydrotherapy range, alongside Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool and other models in the same category. The catalogue listing gives you a fixed starting point rather than a blank sheet:
| Catalogue dimensions | 7000 × 3000 × 1470 mm |
| Jet total | 56 pcs |
| Swim training system | 1 set |
| Water pump / filter pump | 1 pcs / 1 pc |
| Control system | 1 set |
| LED lights | 4 |
| Total power (catalogue figure) | 11.55 kW |
| Features shown on the listing | Water jets, LED lighting, Ozone, Swim training system |
The 11.55 kW figure is the catalogue value for the listed configuration. Heating and heat-pump options change total connected load, so we restate it once your option list is fixed.
Details to Have Ready Before You Send the Enquiry
Each item below removes one round of clarification, and each one can change the price materially. Send them together and the first quotation is usually close to the final one.
- Site and access. Where the spa will sit — garden, terrace, rooftop or recessed pit — plus the finished floor level, clear access for delivery, and whether a crane or tail-lift is needed. A 7000 mm shell that fits on plan may not fit through the gate you measured.
- Structural support. Whether the deck or slab is already designed for a full water load, or whether you want our input before your engineer signs off. We work to your drawings; local structural design and building approval remain with your designer or certifier.
- Electrical supply. Available phase, switchboard capacity and the distance from the switchboard to the spa. This determines cable runs, protection devices and whether an electrician's scope needs to be re-tendered.
- Year-round use. A spa used in all seasons needs insulation and a heat pump; a summer-only installation may not. This single answer changes both the option list and the running cost you are being quoted against.
- Filtration and sanitation preference. Ozone is shown on the base listing. UV sterilisation and sand filtration are catalogued options, and which combination makes sense depends on water volume, exposure to debris and how often the spa is serviced.
- Quantity and programme. One unit for a private villa behaves differently in the schedule from several units across a resort or residential development, where batching and staged delivery matter.
Options We Quote Against This Model
The catalogue lists control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps as options for this range. Availability and compatibility vary by model, so we confirm the combination rather than assume it. If your brief calls for something outside the listed options — a different shell shape, for example — Customizable Shape Outdoor Spa covers square, round, oval and curved configurations with an acrylic shell and structural reinforcement, and is the better starting point than adapting a standard model.
We also quote against Luxury Outdoor Swim Spa with Massage Jets - LED & Water Features when the specification is driven by guest experience rather than swim training, so you can compare like for like.
What a Complete Quotation Should Contain
Before you compare two suppliers, check that both have given you the same scope. Ours sets out:
- The confirmed configuration — model, options, jet layout and control package — written out, not implied by a model code.
- Electrical data for the quoted build: total connected load, supply requirements and protection assumptions.
- Delivery terms, packaging and container loading plan, with the Incoterms and freight basis stated on the quotation rather than added later.
- Customs documentation scope — commercial invoice, packing list, certificate of origin and any import permits required for your country.
- What is excluded: site preparation, structural works, electrical connection, plumbing tie-in and local approval, which sit with your trades.
If a quotation does not separate these, the low number is usually the one that grows.
How the Process Runs at SANTERSON
We are a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, so a swim spa is normally one line in a wider package rather than a standalone purchase. The enquiry follows our standard sequence: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. Under Logistics & Door-to-Door Delivery we handle freight forwarding, customs paperwork, packaging and container loading, and shipment tracking through to the site.
Where a spa is part of a larger fit-out, grouping it with outdoor furniture, bathroom ceramics, lighting or interior fixtures means one production schedule and one container plan instead of several. For Australian enquiries this keeps the swim spa on the same programme as joinery and loose furniture.
Import duties, applicable local standards, transit time and installer arrangements are confirmed per project — we do not publish them as blanket figures, because they depend on your state, port and building class.
Send the Enquiry
Send us the model reference (WS-PC07A-T), your site photos or drawings, your electrical supply details and your target installation month via our Contact page, by email to santerson@qq.com, or by phone/WhatsApp on +86-13928214007 (PHILLIP). We will confirm the configuration with you before pricing.
Quotations are prepared for the stated configuration and site conditions. Any change to options, delivery terms or electrical supply is re-quoted before production is released.