A ten-metre swim spa is not a catalogue item you can order off a shelf. Before a single shell is produced, someone has to confirm that the site can take it, that the power supply can run it, and that the equipment inside the cabinet matches what your drawings promise. This article uses our Outdoor Swim Spa WS-S10 as a worked example so you can see exactly which questions to put to any supplier, and what a serious answer looks like.
Start with the shell dimensions, not the marketing photos
The published catalogue entry for the WS-S10 lists a shell of 10000 × 2200 × 1420 mm. Treat that as the starting point for three separate site checks rather than as a finished answer.
- Access route. Measure the delivery path gate by gate: driveway width, turning radius, overhead cables, and whether a crane or hiab lift is needed to clear a fence or roofline. A 10 m shell that fits on a terrace plan is useless if it cannot reach the terrace.
- Structural support. A deck or podium slab has to carry the filled weight plus live loads. Send your structural engineer the shell dimensions and let them specify the bearing detail — do not accept a supplier's verbal reassurance on this point.
- Plant space. Pumps, filtration and controls need room, ventilation and safe access for servicing. Ask where the equipment sits in your configuration and whether that position matches your drainage and power runs.
A supplier who cannot talk through access, support and plant space has not really priced your project — they have priced a product.
Ask for the specification line by line, and ask what is optional
The catalogue entry for the WS-S10 lists one control system, two water pumps, one filter pump, 76 jets, LED lighting with 40 small lights, ozone sanitation, and a total power figure of 7.65 kW. Those numbers are useful precisely because they are checkable: put them next to your own brief and mark every gap.
Then ask the hard follow-up question — what is standard and what costs extra? Our catalog lists options such as UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps, and availability varies by model. A comparable way to see this is our WS-S10-T, which shares the same catalogue shell size but adds a swim training system: same length, different brief, different build.
Reading two or three entries side by side is the fastest way to see whether a supplier has actually read your brief. Here is how our own catalogue presents closely related shells:
| Catalogue item | Shell dimensions (mm) | Jets | Total power | Features shown |
| Outdoor Swim Spa WS-S10 | 10000 × 2200 × 1420 | 76 | 7.65 kW | Water jets, LED lighting, Ozone |
| Outdoor Swim Spa WS-S10-T | 10000 × 2200 × 1420 | 76 | 7.65 kW | Water jets, LED lighting, Ozone, Swim training system |
| Outdoor Swim Spa WS-S12 | 11740 × 2200 × 1470 | 73 | 7.65 kW | Water jets, LED lighting, Ozone |
The point is not which row you pick. It is that a supplier able to produce a table like this — quantities, power load, feature set per model — is a supplier whose quotation you can compare line for line against a competitor's.
Confirm the electrical and plumbing interface in writing
Total connected load is the number your electrician works from. For the WS-S10 the catalogue shows 7.65 kW, but the local supply arrangement — breaker size, cable route, isolation location, earthing detail — depends on your site and on the country you are building in. Ask the supplier for a wiring and connection schedule for the exact configuration you intend to buy, then have your own electrical contractor review it against local requirements before the shell arrives.
The same applies to drainage, overflow and water fill. Every one of these interfaces is a place where projects stall when they are left undefined at order stage.
Judge the supplier on delivery and site support, not just the shell
Swim spas cross borders in containers, and the paperwork is as important as the freight. Our furniture logistics and door-to-door delivery service covers sea, air and rail freight forwarding along with customs documentation, packaging and container loading plans, shipment tracking and delivery to site. Ask any supplier what their quotation actually includes: FOB or door-to-door, who handles import formalities, how the load is crated, and who pays for demurrage if the site is not ready.
Then look past arrival. Our furniture installation and after-sales support page sets out on-site installation, inspection and snag resolution, warranty coverage, spare parts and ongoing maintenance. For a swim spa specifically, ask who commissions the jets, pumps and control system on site, who supplies spares in five years' time, and what response is committed to when a pump fails mid-season. Written answers here are worth more than any discount.
Check that the supplier can coordinate the swim spa with the rest of the build
A pool deck is never just a pool. Pergolas, loungers, cabanas, hardtop gazebos, wall cladding and paving all meet at the same edge, and they are usually bought from different vendors on different schedules. That is where an one-stop furniture and building materials supplier earns its place: one specification, one production schedule, one shipment and one point of accountability.
Where the pool area is part of a villa or hospitality project, this coordination matters even more. Our turnkey interior project solutions run from consultation and design through production, logistics, installation and after-sales, so the swim spa, the outdoor furniture around it and the surrounding finishes are managed as one package instead of four separate contracts.
If your brief calls for a shape or layout outside the standard catalogue, ask about manufacturing capability directly. Our customizable shape outdoor spa is built to square, round, oval and curved configurations with an acrylic shell and structural reinforcement, for gardens, terraces and leisure areas. A supplier willing to show you their prototyping and material options is a supplier who can absorb a change on site without collapsing the programme.
A shortlist of questions worth asking before you order
- Which exact model and configuration is being quoted, and how does it differ from the nearest variant?
- Is every option in your brief listed as standard or optional, with quantities stated?
- Can you provide a connection schedule for power, drainage and overflow for this configuration?
- Who is responsible for the delivery route survey, lifting, and placement on the prepared base?
- Who commissions the system, and what after-sales response is committed in writing?
- What happens if site dimensions change after order — can the supplier revise the shell or layout?
Take those six questions to three suppliers and the difference in capability becomes obvious within one round of emails. The cheapest quotation is rarely the one that answers all six.
Talk to us about your swim spa requirements
If you are specifying a WS-S10, a longer long outdoor swim spa with hydrotherapy and relaxation pool, or a fully customised layout, send us the site drawings and your brief. We will confirm what is standard, what is optional, and what your site needs to be ready for — before you commit to an order.
SANTERSON — contact PHILLIP, phone/WhatsApp +86-13928214007, email santerson@qq.com. Enquiries are answered Monday to Saturday, 8:00 AM–6:00 PM (GMT+8).