A wardrobe submittal is the package a buyer, builder or designer reviews before a made-to-order joinery order is released for production. For an Arched Paneled Wardrobe, the arch profile, the panel construction and the site openings all have to agree on paper first, or the curved elements arrive on site not matching the wall they were designed for. The checklist below covers what a complete submittal should contain for this style of wardrobe, and what to ask your supplier to confirm at each stage.
Why arched paneled wardrobes need a fuller submittal than flat-front units
A flat sliding-door wardrobe mostly fails on size: get the opening right and the carcass fits. A paneled wardrobe with an arched head adds geometry that cannot be corrected on site. The arch radius, where the curve starts above the door stile, the grain direction across the curve, and how the arch meets a ceiling that is never perfectly level all have to be fixed in the drawings before panels are cut.
Santerson Arched Paneled Wardrobes sit within the Classic Paneled Wardrobes collection and are made for residential wardrobe projects with project-specific dimensions, layout and finish options. Because sizing, material and layout are specified per project rather than chosen from fixed sizes, the submittal is where those specifications get locked down in writing.
Section 1: scope, schedule and product identification
Start with a short cover sheet so everyone is reading about the same unit. This section takes one page and prevents most of the arguments later.
- Room-by-room schedule: each wardrobe, its location, the wall it sits on, and the quantity of doors and panels.
- Product reference as published, so the collection and door style are unambiguous in the record.
- Names of the parties: supplier, builder or fitter, designer, and who signs off the drawings.
- Order sequence and dependencies: which rooms are released first, and what site work must be finished before measuring.
- A note on anything excluded from the order, such as architraves, skirting removal, electrical work inside the carcass or lighting feeds.
Section 2: dimensional drawings for each wardrobe
Dimensioned drawings are the core of the submittal. Ask for a drawing per wardrobe type, not one generic elevation, and check that the following appear on it.
| Drawing item | What to look for before approving |
|---|---|
| Elevations, both faces | Door count, panel layout, and the position of every arch on the elevation. |
| Arch detail | Springing height (where the curve begins), the curve shape, and how the arch frame meets the surrounding flat panel. |
| Carcass section | Overall depth, depth taken by doors and arch framing, and clearance for hanging rails and drawers. |
| Interior layout | Rail heights, shelf positions, drawer stacks, and any full-height or corner section carried through from the design intent. |
| Ceiling and floor interface | How a full-height unit is packed out under an uneven ceiling, and whether scribes or a filler strip are included. |
| Door operation clearance | Hinged, sliding or hinged-and-panelled operation, plus the swing or track space needed next to beds, vanities and skirting. |
Where the design also carries doors elsewhere in the same house, ask for the wardrobe elevations and the paneled hinged door details to be drawn on the same panel profile, so the two read as one joinery language rather than two similar ones.
Section 3: materials and finish schedule
The material section should name every surface separately. A single line reading "oak veneer" is not enough once a curved arch panel is involved, because the curve may be built differently from the flat door below it.
- Door and panel substrate, and how the panel is constructed (flat panel, framed panel, moulded or raised profile).
- Arch panel build method: how the curve is formed, and whether the veneer or finish wraps the curve or is applied to a pre-shaped core.
- Surface material and decorative code for carcass, doors, arch panels and interior faces.
- Edge treatment on all visible edges, including the inner and outer edge of the arch.
- Finish type and sheen, and whether the arch panel and flat door are finished together or in separate passes.
- Interior finish: whether the inside faces are decorated to the same standard as the outside.
Where a project mixes finishes across rooms, a simple room-by-room finish table is easier to sign off than paragraphs of description. If your project uses veneered joinery in some rooms and painted or laminated panels in others, ask for each combination to be listed with its code so substitutions are visible rather than assumed.
Section 4: hardware and internal fittings
Hardware is where submittals get thin. Request a schedule that lists make, model and load for everything that moves or carries weight.
| Item | Details to state |
|---|---|
| Hinges and stays | Type, closing action, and the door weight and width each hinge is rated for. |
| Sliding gear (if used) | Track, hanger and wheel set, plus the maximum door leaf size it carries. Compare this against your arch-top leaf size. |
| Handles and pulls | Fixing centres, through-bolt or single-sided fixing, and finish code matched to the paint or veneer. |
| Rails, shelves and drawers | Rail material and span without sag, shelf thickness and support type, drawer runners and their load rating. |
| Lighting provisions | If in-carcass light is wanted, where the fitting sits, how it is switched, and who supplies the transformer and the site feed. |
| Wall fixings | Fixing method for the wall type on site, especially for full-height units and curved heads that need packing. |
Section 5: samples and approvals to hold before production
For an arched paneled wardrobe, insist on physical approval of three items rather than a colour card alone:
- A finish sample showing the surface material and sheen under the room's own lighting.
- A profile sample or shop drawing section of the arch, so the curve depth and moulding line are agreed in writing.
- A panel corner or door sample showing edge banding, the panel-to-frame joint, and how the finish runs over a moulded edge.
Record each approval with a date and the name of the person who approved it. If the arch profile is only agreed verbally, that agreement has no effect on what gets manufactured.
Section 6: site conditions and measuring responsibilities
Curved heads expose uneven floors and ceilings more than square ones do, so the submittal should state who measures, when, and on what condition. Confirm in writing:
- Who takes the final site dimensions, and at what stage of finishes (after flooring, ceiling set-out and skirting decisions).
- Floor levelness and ceiling height tolerance across the wardrobe run.
- Whether the arch is measured to a fixed springing height or set out to suit the finished ceiling line.
- Clearances for services, switches, air grilles and door swings that sit inside or beside the unit.
Section 7: packaging, delivery and installation plan
Ask how a wardrobe with curved panels travels. The submittal should describe protection for arch edges, panel orientation in the crate, labelling by room and elevation number, and the quantity of packages per wardrobe so the site team can plan storage. Then set out the installation sequence: who prepares the opening, who fixes and packs the unit, who touches up the finish on site, and how snags are recorded and closed out.
For projects where joinery is ordered alongside other fit-out items from one factory, it helps to have delivery windows stated per trade. Santerson's service pages describe a workflow running through design and planning, production, logistics, installation and after-sales support, which means the wardrobe submittal can be coordinated with the rest of the joinery package instead of being handled as an isolated purchase.
Section 8: commercial terms to confirm in the same document
Keep the commercial section short but explicit, so nothing is discovered after the order is released:
- Pricing basis per wardrobe and what is included in that price (drawings, arch detail, hardware, interior faces, packing).
- Order quantity rules for the project, since made-to-measure joinery is quoted per set rather than from stock.
- Payment stages linked to drawing approval and production release.
- Production window after drawings are signed, and what restarts that clock if a finish or dimension changes.
- Freight terms and who handles customs paperwork for the shipment.
- What is covered after handover, and how replacement panels or spare hardware are ordered later.
A quick pre-release check
Before signing, read the package against four questions. Does every wardrobe have its own dimensioned elevation with the arch drawn? Is every surface named with a material and finish code, including the curve? Is each item of hardware specified with a rating that suits the door it carries? And does the document say who measures the site openings and when? If any answer is no, resolve it on paper now.
The same discipline applies across a joinery package. A walk-in wardrobe order needs internal fit-out details added to the list above, while bedroom units in a matching scheme should be drawn with consistent panel profiles — related styles in the paneled range include Recessed Panel Wardrobes and Raised Panel Wardrobes, which are useful when the arch is reserved for one feature room and flat panelled doors carry the rest of the house.