A glass-door wardrobe is one of the easiest built-in pieces to specify badly. The frame looks simple, the glass looks simple, and the drawing looks finished — until the doors arrive and do not line up with the ceiling, or the interior layout no longer matches what the client expected. If you are sourcing glass hinged wardrobes for a villa, apartment or hospitality room, the quality of your quotation request decides most of the outcome. Below is the information that lets a manufacturer price your job properly and produce doors that fit.

Start With the Opening, Not the Mood Board

Before any finish discussion, send the physical dimensions of the space. For a made-to-measure wardrobe this means width, height and depth at more than one point on each wall — floors are rarely level and ceilings are rarely square, and even a small difference between two corners changes what the carcass can be. Note everything that intrudes into the opening: skirting boards, architraves, light switches, air-conditioning returns, downlights, door surrounds and any pipework you know is behind the wall. If the wardrobe runs into a corner or wraps around a column, a sketch with rough measurements is enough at this stage; a full measured drawing can follow.

Tell us whether the unit is built into a prepared recess or fixed against finished walls, and whether the site is new build or renovation. Renovation sites often need scribing and packing that a new-build opening does not, and it belongs in the price from the beginning rather than appearing as an addition later.

Choose the Door Type You Actually Want

Our Glass Hinged Wardrobes sit within the wider Hinged Door Wardrobes collection, and they are not the only glass option. Two families are worth comparing side by side when you request a quote:

If the room needs the wardrobe to disappear into the joinery, we also produce Mirrored Hinged Wardrobes and Paneled Hinged Wardrobes. Say in the enquiry which direction you are leaning, even if you have not decided. It lets us price the option you prefer alongside a realistic alternative instead of quoting one narrow solution.

Specify the Glass and the Frame Clearly

For glass-fronted doors, be explicit about three things in writing: the glass type (clear, frosted, bronze or smoked), whether the surface is plain or textured, and how much transparency you want. Fully clear glass shows the interior, so it only works if the internal layout will always look tidy; frosted and smoked glass hide the contents while still letting light through; bronze glass carries a warm tint that has to be matched against nearby mirrors and metal finishes.

For the frame and carcass, name the finish you are working to — a paint colour reference, a wood-tone sample, or simply a photograph of another joinery item on the same project that the doors must match. Where a metal frame is involved, state the tone (black, bronze, silver) so the profile and the glass can be quoted as one matched set.

Send the Interior Layout With the Enquiry

The inside of the wardrobe is where most budget gets decided. Rather than asking for a generic shelf pack, tell us how the space is used: hanging length for long garments, drawer count, shelving for folded items, lighting inside the carcass, and any niche or open display section you want on show. If you have Glass Modular Wardrobes or a corner unit in mind, mention it — modular and corner layouts are built differently from a straight run, and the internal fittings follow.

If you do not have a layout yet, say so. Our team can work from the room dimensions and your storage requirements and propose an internal arrangement for your approval before anything is priced for production.

Add the Project Context

A quotation request goes much faster when it also states: the number of wardrobe sets or rooms involved, the delivery city and who receives the goods on site, whether you are a contractor, designer or private owner, and the date the units need to be on site. For villa and hospitality work this is where scope can widen usefully — wardrobes are frequently specified together with interior fixtures, cabinetry, doors and wall panelling, and grouping them lets one production and shipping plan cover several trades instead of three separate orders.

SANTERSON has manufactured furniture and building materials since 2008 and works on custom, made-to-measure orders for residential and hospitality projects, with door-to-door delivery arranged from our factory. That means your enquiry can stop at the drawing stage: we handle production, packing and freight, and confirm the shipping terms with you before goods leave.

What Happens After You Send the Enquiry

  1. Review and questions. We check your dimensions and specification, then come back with anything missing — usually a section detail, a finish reference or confirmation of the glass.
  2. Quotation and details. You receive an itemised price with the sizes, materials and finishes written out, so you can compare it against what was requested rather than against a vague total.
  3. Confirmation before production. Nothing is cut until the drawings and specification are approved in writing. Any change after this point affects both cost and schedule, which is why the confirmation step matters.
  4. Production, packing and delivery. The finished units are packed for export and shipped to site under the agreed terms, with installation and after-sales support available as part of the project scope.

A Short Checklist Before You Hit Send

  • Width, height and depth at multiple points, plus obstructions and skirting details
  • Door type: glass hinged, framed glass, mirrored or panelled
  • Glass type and tint, and the frame or carcass finish reference
  • Internal layout: hanging, drawers, shelves, lighting, display niches
  • Quantity, room list, delivery city and required on-site date
  • Your role on the project and who we should reply to

Send that much detail and the first quotation is usually the one you sign. Send less, and you will spend the project answering questions that a tape measure and five minutes of notes would have settled.

Send us your dimensions, glass choice and room list and we will return an itemised quotation for made-to-measure glass hinged wardrobes, with a second option to compare if your preferred specification pushes past budget.