Why the specification sheet is not enough for a swim spa enquiry
A catalogue page tells you the outer shell size and how many jets are fitted. It does not tell you whether that shell will sit on your deck, clear your gate, run on the power available at the site, or reach the level of use the owner expects. When we quote Outdoor Swim Spa WS-S06CT, the questions below are what we ask first, and the same list works for any model in our swim and hydrotherapy range.
Sending this information with your enquiry lets us confirm the configuration, the electrical load and the delivery route in one pass, instead of three rounds of email.
1. The space: outer dimensions plus working clearance
The catalog lists WS-S06CT at 5880 × 2380 × 1400 mm. Those are the shell dimensions, so treat them as a starting point and add room around the unit for:
- Access. The width of gates, side passages, stair flights and any lift or crane reach needed to move the shell from the delivery vehicle to its final position. Tell us the narrowest point on that route, not just the driveway.
- Plant room and equipment access. Space for the water pump, filter pump and control system, and enough clearance for a technician to open panels during routine service.
- Edge detail. Whether the spa is fully above ground, partly recessed, or set into a deck with an overflow edge. Recessed installations need the opening dimensions, not only the shell size.
- Surfaces around it. Decking, paving, steps and handrails that belong to the same package, so we can price them together rather than leaving a gap between trades.
A drawing is worth more than a description. A simple plan showing the spa, the access route and the nearest walls is enough for a first review.
2. How the spa will actually be used
Two owners can stand in front of identical shells and need different setups. Tell us:
- Whether daily swimming laps, family play or seated hydrotherapy comes first. WS-S06CT is listed with a swim training system and 31 jets, so the balance between the swim channel and the seating zone is what we adjust.
- How many people usually use it at once, and whether children will be in the water — this affects step design, depth handling and cover choice.
- Whether you want a heated spa used year-round or a cooler bath. Heating is an option rather than a fixed part of the base unit, so we size it against your usage pattern.
3. Power, water and the services at the site
The catalog records total power for WS-S06CT at 8.35 kW. That figure is for the listed configuration, so confirm it again against the options you choose before your electrician finalises the circuit. Please send us:
- Supply details at the site: phase, voltage and frequency, plus where the main distribution board sits relative to the spa.
- Whether a dedicated circuit and isolator can be installed, and who is doing that work.
- The water fill source, and how the spa is drained or overflowed — including where the discharge can legally go.
- Drainage and waterproofing arrangements for the deck or pit, which your local contractor handles.
4. Options to decide before we quote
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each one changes both price and the services needed on site, so mark your preference early:
- Water treatment. Ozone is shown as a standard feature; UV sterilization and sand filtration are options to weigh against how often the spa is used and how much maintenance your team can commit to.
- Heating and insulation. A heat pump plus insulation suits frequent use in cooler climates and reduces running cost per session.
- Steps, covers and lighting. The listed LED lights sit inside the shell; the approach, steps and any cover belong to the surrounding design.
5. Where this model sits in the range
If the 5880 mm shell does not suit the site, two close relatives are worth comparing on paper before you commit:
- Outdoor Swim Spa WS-S06CT-L — a longer 6670 × 2380 × 1400 mm version of the same layout, for owners who want more swim length.
- Outdoor Swim Spa WS-S06C — the same 5880 × 2380 × 1400 mm footprint with a different pump, jet and lighting setup, where a swim training system is not the priority.
For irregular gardens, terraces or a spa that must follow an architectural line, our Customizable Shape Outdoor Spa covers square, round, oval and curved shells instead of a fixed catalogue size. Browse the full Swimming Pools and Swim Spas category to see the sizes available between these models.
6. How a swim spa travels with the rest of a project
On villa and resort projects the spa rarely arrives alone. Poolside loungers, pergolas, outdoor dining sets, paving, lighting and bathroom fixtures all touch the same area, and split suppliers are where details get lost. We work as a One-stop Furniture and Building Materials Supplier, so the spa, the surrounding furniture and the interior fit-out can sit under one production and delivery plan, with freight arranged through Furniture Logistics and Door-to-door Delivery. If the shell needs a non-standard size or finish, our Custom & OEM Service handles the design and prototyping stage.
A checklist before you send the enquiry
Pull together these five items and the first reply from any supplier will already be a configuration rather than a set of questions:
- Site plan or photos, with the narrowest point on the access route measured.
- Preferred use: swim training, family use, hydrotherapy — and how many users at one time.
- Supply details (phase, voltage, frequency) and the distance to the distribution board.
- Fill and drainage arrangement, plus who handles groundwork, waterproofing and electrical work.
- The options you want from the list above, and any model you are still comparing.
With those five items we can confirm which configuration fits your site, what is included in the quote, and what your local contractor needs to have ready. Send us the details and we will come back with a proposal rather than a generic price list. All figures quoted above are catalog values for the listed configuration; they are restated in writing against the exact build you order.