A swim spa sits in an awkward place on most project schedules. It is not furniture, and it is not structural building work, yet it needs a slab, an electrical supply, a drainage decision and a lifting plan before the landscape contractor mobilises. When that coordination is left to chance, the unit arrives late or the power feed never matches the load. The Outdoor Swim Spa WS-130BⅢ-U is a long, narrow hydrotherapy unit in our configurable swim and hydrotherapy range, which means it rewards a short, disciplined specification early. This guide sets out what a procurement brief for this model should contain, and which items must be confirmed with the factory rather than assumed from a catalogue.
What the WS-130BⅢ-U actually is
Before writing any requirement into a brief, it helps to describe the unit in one sentence that consultants, main contractors and clients all agree on. The WS-130BⅢ-U is an outdoor swim spa with an acrylic interior and a reinforced cabinet, supplied as a self-contained unit with its own pumps, control system, jets and lighting. It sits on a deck, terrace or paved courtyard rather than being built into the ground, so the site works are limited to supporting the load, running the supply and giving maintenance access.
The model name itself carries information worth repeating in every drawing sheet and purchase order. Suffixes such as -U separate configurations inside the same shell size, and the differences sit in the equipment list rather than the footprint. In our catalogue data both variants of this shell are listed at 9950 × 3000 × 1430 mm, but their equipment differs: the WS-130BⅢ-U is recorded with a higher water-pump count and jet total, while the closely related WS-130BⅢ is recorded with a swim training system and a different lighting count. Treat every number below as provisional until it is reconfirmed against the exact code you are ordering, because two codes that look almost identical on a schedule can drive different electrical loads and different jet layouts.
The dimensions section: envelope, not water volume
Catalogue dimensions for this model are 9950 × 3000 × 1430 mm (length × width × height). Those numbers describe the external envelope of the unit, which is what a layout drawing, a delivery route and a crane or forklift plan actually need. They are not a statement of water depth, water volume or usable swim length.
Three practical consequences follow, and each one belongs in the brief as its own line item:
- Clearance around the cabinet. A 9950 mm unit needs room at the ends for delivery access and at the plant side for filter pump and control system servicing. Note the maintenance clearance you intend to leave, not just the footprint.
- Height above the finished level. At 1430 mm overall height, the unit reads as a wall on a terrace. Confirm whether it is fully above grade, partially recessed, or set into a deck with an insulated surround, because that decision changes both the civil scope and the insulation option.
- Door, gate and site access. A unit of this length rarely passes through a typical side gate. Record the delivery route from the truck to the final position in the brief, together with who provides lifting equipment.
Equipment list: what the catalogue shows for this model
The specification block shown on the product page for the WS-130BⅢ-U reads as follows. Use it as the starting point of your equipment schedule, then have each line confirmed against the configuration you are ordering.
| Specification item | Shown on the product page for WS-130BⅢ-U | What to confirm before ordering |
|---|---|---|
| Model code | WS-130BⅢ-U | Exact suffix, on drawings, purchase order and packing list |
| Catalog dimensions | 9950 × 3000 × 1430 mm | External envelope versus finished deck level; maintenance clearance |
| Control system | 1 set | Mounting location, access for the user, protection from weather |
| Water pump | 4 pcs | Which circuits they serve and whether jet performance is what the client expects |
| Filter pump | 1 pc | Filtration run hours, access for cleaning the filter |
| Jet total | 23 pcs | Jet positions relative to seating and lounging areas |
| LED lights | 5 | Colour mode, control integration, switching arrangement |
| Total power | 11.85 kW | Supply capacity, circuit protection, whether a heat pump is added on top of this figure |
| Features shown | Water jets, LED lighting, Ozone | Whether ozone is included or optional for the selected configuration |
One point deserves emphasis because it causes real cost variation: the total power figure applies to the configuration shown on the page, not to every build of this shell. Adding a heat pump or changing pump options changes the load. The electrical engineer should size the supply from the confirmed configuration sheet, with the isolation and residual-current protection determined locally, rather than from a brochure number.
Options to price at the same time as the unit
Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so treat each option as a line in the bill of quantities with a price and a lead time attached. In practice the options that most often get added late — and therefore cause delay — are:
- Heat pump. Decides the running cost profile and adds to the electrical load. Decide before the supply is sized.
- Insulation. Relevant when the unit sits in a cooler climate or is partially recessed, and it interacts with the surround detail.
- Sand filtration versus the standard filter pump arrangement. Affects the plant area and the maintenance routine handed to the facilities team.
- Steps and access. Easiest to design into the deck at the same time as the paving layout.
- UV sterilisation and ozone. Clarify which sanitation method is included with the selected configuration and which is an addition.
How to write the specification clause
A short, testable clause serves project procurement better than a long marketing description. A workable structure for this model:
- Identification. "Outdoor swim spa, model WS-130BⅢ-U, as supplied by SANTERSON; catalog envelope 9950 × 3000 × 1430 mm."
- Confirmed equipment schedule. Attach the configuration sheet issued for this exact code, and require the supplier to sign it back.
- Services interface. State who provides the electrical final connection, the water fill and drain arrangement, and the condensate or overflow route.
- Site works boundary. State that the sub-base, deck surround and any recessed structure are a separate trade, and identify the party responsible for level tolerance.
- Delivery and handling. Delivery point, lifting method, protection of finished surfaces.
- Handover. Commissioning attendance, spare parts contact, maintenance instructions to the facilities team.
Where a supplier like SANTERSON fits in the process
We are a China-based manufacturer and one-stop supplier of furniture and building materials, working with project clients on villa, hospitality and office fit-outs. A swim spa rarely travels alone on these projects: it usually arrives as part of a wider outdoor package that may also include outdoor furniture, paving-adjacent finishes, lighting and shading. Coordinating those items under one procurement route reduces the number of separate delivery dates the site has to absorb.
Our service scope covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, and installation support with after-sales service. For a swim spa package that usually means we can confirm the configuration sheet against your drawings, flag the electrical and clearance requirements back to your engineer, and ship the unit together with the surrounding outdoor items under logistics and door-to-door delivery. Where a project needs a different shell length or jet arrangement, our custom and OEM service covers bespoke specification and prototyping — but confirm the available options and minimum order quantities for your specific project before committing them to a brief.
If the swim spa is one element of a larger fit-out, the swimming pools and swim spas range shows the full set of catalogued shell sizes and equipment combinations, which makes it easier to compare the 130B envelope against shorter options. The wider turnkey solutions pages describe how outdoor elements are coordinated with indoor fixtures on villa and hospitality projects.
Pre-order checklist for the WS-130BⅢ-U
- Full model code, including suffix, written identically on drawing, order and packing list.
- Configuration sheet received and signed back, listing pumps, jets, lights, ozone and control system for that code.
- Electrical load taken from the confirmed configuration, not from a catalogue figure alone.
- Sub-base, surround and level tolerance assigned to a named trade.
- Delivery route, lifting method and maintenance clearance recorded on the layout drawing.
- Options priced now: heat pump, insulation, filtration type, steps, UV or ozone.
- Commissioning attendance and spare-parts contact agreed before shipment.