A buffet cabinet rarely fails at the production stage. It fails in the exchange of information before production, when a drawing carries one height, a purchase order carries another, and the room itself was never measured against either. Because Santerson Buffet Cabinets are made to measure rather than ordered from a fixed size range, the quality of your enquiry determines the quality of the quotation and the accuracy of what arrives on site. The list below is the set of inputs we ask project buyers, contractors and designers to supply so that one round of correspondence is enough.
1. Room dimensions with a reference point
Send the length of the wall the cabinet will sit against, the available depth from finished wall face to the nearest obstruction, and the floor-to-ceiling height where the unit is intended to reach upward. Note whether walls are true or out of plumb, and identify skirting, architraves, radiators, switches, air grilles and door swings that the cabinet has to clear. A single room dimension without a reference point invites guesswork; state whether the figure is taken to finished surfaces or structural ones.
2. Overall size versus internal layout
Tell us the external envelope you need, and separately what has to fit inside it. Buffet cabinets are usually specified by use: glassware and dinner services, linen, bottles, small appliances, or a mix. Each answer changes the shelf spacing, the drawer count and whether adjustable shelving is worth the extra fitting cost. If you have a preferred internal arrangement, mark it on the drawing; if you do not, tell us what you intend to store and we will propose the layout.
3. Door and opening system
Hinged doors need clearance to swing. Sliding fronts need a track depth and a wall return. Drawers need pull-out depth in front of the unit, and an open display section needs none of these but more attention to dust. Where the walkway in front of the cabinet is narrow, this decision shapes the rest of the specification, so it is better settled early than corrected after tooling.
4. Materials, finish and edge detail
Panel substrate, surface material and sheen level are three separate choices. We work with wood, metals, engineered stone and laminates, and finishes can be matched to an existing sample or a project colour standard. Tell us whether the cabinet stands alone or is continuous with custom built-in kitchen cabinets, because a shared reveal, matching grain direction and identical sheen across two product groups only hold if both are produced to one finish standard.
5. Countertop and the surface above it
If the buffet top also carries a stone or engineered-stone surface, give its intended thickness and overhang, and say whether a splashback returns to the wall. Where appliances sit on or under the top, provide their cut-out dimensions and heat output so that ventilation and support are designed in rather than improvised during installation.
6. Hardware expectations
Hinges, drawer slides, handles and integrated lighting are specified item by item. Send the hardware you or your client already uses so that we can match it, and state soft-close requirements. If integrated lighting is wanted inside glazed sections, tell us which sections and where the transformer may be concealed; electrical details are confirmed with the final configuration rather than assumed.
7. Site conditions and installation route
A tall unit that fits the room may not fit the delivery path. Give lift car dimensions, stair widths, corridor turns, and whether the unit can arrive in sections and be assembled in place. Confirm floor finish and levelness, wall construction for any wall-mounted fixing, and who is responsible for on-site assembly. We supply furniture installation and after-sales support, and a clear division of responsibility at quotation stage prevents two trades assuming the same task.
8. Programme, quantities and delivery address
State the required on-site date, working backwards from handover rather than forwards from today, together with quantities per unit type and each delivery address. Multi-apartment and villa schemes often need staged deliveries to different blocks; this affects packaging and container loading plan, not just the invoice.
9. Documentation your procurement team needs
Tell us which paperwork your process requires: shop drawings for approval before production, packing lists, commercial invoices, certificates of origin or import documentation. We handle furniture logistics and door-to-door delivery by sea, air and rail with customs paperwork, so knowing your documentation requirements early keeps the shipment from stalling at the border.
A short enquiry template that works
If you would rather send one message than ten, this structure is sufficient to start: wall length, available depth and height to finished surfaces; intended contents and preferred layout; opening system; substrate, finish and any sample reference; countertop details; hardware list or preference; delivery path and site responsibility split; required on-site date, quantities and address; documentation needed. Attach a marked-up plan or photograph where one exists. From that input we can return an itemised quotation, a proposed internal layout and a production schedule for your review.
Santerson manufactures to project-specific dimensions, finishes and layouts as part of custom furniture manufacturing, so an unusual size or an awkward corner is a normal specification rather than an exception. Where a buffet cabinet sits inside a wider fit-out that also includes wardrobes, tall cabinets, wall panelling and flooring, grouping those items in one enquiry keeps finishes consistent across the project and reduces the number of separate suppliers your site team has to coordinate.
Send your dimensions and drawings to start a quotation: contact SANTERSON.