A request for acoustic sliding panels often arrives with very little behind it: a mood image, a room name, and the word "acoustic". That is enough to start a conversation, but not enough to price, produce or install anything. Sliding panel systems sit at the junction of wall finish, joinery and hardware, so an incomplete brief turns into repeated drawings, revised quotations and a delivery date that slips.
Before you contact us about Santerson Acoustic Sliding Panels, collect the items below. Most of them come off your own drawings and site notes, so the preparation takes an hour or two — and it is the difference between a specification we can quote in one pass and a specification that needs three rounds of clarification.
1. The room, the wall and what the panels have to do
Tell us which space the panels are going into and what they are being asked to solve. A media wall in a private villa, a bedroom where a closet opening is being closed off, and a meeting nook inside an office fit-out all use sliding panels, but the panel build, the track detail and the tolerance for gaps differ in each case.
Be specific about the acoustic intention. "The room is too echoey" and "speech from the next room should not carry through this opening" are different problems, and a sliding panel addresses the second one only partially — a track and a rebate line are paths for sound. Describe the noise source, the space on each side, and what outcome you would consider acceptable. We will then confirm the acoustic performance of the configuration we propose for your project rather than assume it from a catalogue page.
2. Dimensions — measured, not estimated
Made-to-measure sizing is where a sliding panel system is either built correctly or rebuilt. Send us:
- The overall opening width and height, plus the finished floor level and finished ceiling level if the panels run floor to ceiling.
- Width, height and depth at intervals along the wall — older villas and renovated shells rarely hold a consistent line from one end of a wall to the other.
- The clear projection you can accept for the track and the panel stack when the panels are open, both internally and externally.
- Position of skirting, architraves, cornices, switches, sockets, floor outlets, radiators and any recessed cabling that the track has to clear.
- Ceiling construction and whether it can carry a top track, or whether the system needs to be bottom-supported.
If the wall is not straight, say so explicitly. A 15 mm deviation across a four-metre run changes the reveal detail and how the panels meet the adjacent finish, and it is far cheaper to design for on paper than on site.
3. Layout, operation and how many leaves
Send a sketch or a marked-up plan showing where the panels stack when open, which direction they travel, and whether any leaf has to pass a corner. The questions we will ask you back are consistent:
- How many leaves, and what clear opening do you need at each end of the run?
- Top-hung or bottom-rolling, and is a floor track acceptable where it crosses a doorway threshold?
- Do the panels bypass one leaf width, stack against a return wall, or pocket into a wall cavity? If they pocket, who builds the cavity and to what depth?
- Handle style, and whether the panels need to lock or latch.
- Frequency of use — a leaf you move twice a year and one that separates a living space every evening are specified differently.
If the same wall also has to hide a television, storage, or a closet, mention it at this stage. We supply related systems in the same collection — Santerson Closet Sliding Panels, Santerson Partition Sliding Systems and Santerson Sliding Panel TV Systems — and a single coordinated wall build is usually cheaper and tidier than three separate trades solving one wall independently.
4. Finish, material and how the panels meet the rest of the room
Material and finish options are specified per project, so send us what the panel has to sit against rather than only what you want the panel to look like:
- The adjacent wall finish — paint colour reference, veneer species, stone slab reference or a physical sample number.
- Flooring material and thickness at the threshold, since this governs whether a floor track can be recessed.
- Whether the panel face should match other joinery on the project, such as wardrobes, media walls or kitchen cabinetry. If it should, send those references so we work from one finish schedule.
- Sheen and texture expectations for a surface that will be touched repeatedly — a matte lacquer in a hallway is a different request from a decorative feature face.
Where the acoustic face has to be perforated, fabric-wrapped or grooved, tell us early: it affects both the visible result and how the panel edge meets a plain panel on the same run.
5. Project context, quantities and dates
The commercial part of the enquiry is where most buyers lose time. Having these on hand lets us quote in one pass:
| What we need | Why it changes the outcome |
|---|---|
| Quantity — number of runs and leaves, plus any repeat details across rooms or units | Repeat details drive tooling, finish consistency and how we batch production. |
| Project location and the delivery address for this package | Freight mode, packaging and container loading are planned around the destination. |
| Site programme — when the wall needs to be closed off, and what has to happen before our panels go in | Sliding panels are a finishing item; wet trades, flooring and services must be complete first. |
| Who is on site: main contractor, joinery subcontractor, or us | Determines who sets out the track, who signs off levels, and how snags are handled. |
| Your role — developer, builder, designer, interior firm or private owner | Changes what drawings, samples and sign-off documents you need from us. |
If the panels are part of a wider fit-out — wardrobes, wall panelling, cabinetry, flooring, lighting — send that scope too. As a one-stop furniture and building materials supplier we coordinate several packages from one factory, and grouping them avoids the finish and level mismatches that appear when each package is bought separately.
6. Drawings, documents and decisions to settle before you write
You do not need a finished detail drawing to contact us — our interior design services cover space planning, product specification and production coordination. But the enquiry moves faster when you send:
- Relevant wall elevations and plan extracts, in PDF or DWG, with dimensions on them.
- Photographs of the actual opening, taken from both sides, plus one showing the ceiling and floor junctions.
- The finish schedule or joinery specification for the project, if one exists.
- Any client note about acoustics — even a plain sentence describing the problem is more useful than a target number lifted from a datasheet.
And settle two decisions internally before you send anything: who has authority to approve a finish sample, and what your latest acceptable site date is. Both questions come up in the first week, and an unanswered one is what usually stalls a panel package.
7. What happens after you contact us
The sequence we follow on a project like this is straightforward: consultation on the brief and site conditions, design and planning with drawings for your approval, production with quality control, then logistics and installation support. For custom furniture design and OEM manufacturing, the same route applies, including prototyping and material selection before full production.
- You send the measurements, photographs and brief described above.
- We come back with questions on anything unresolved — usually track support, stack direction or finish matching — and a proposed configuration for your approval.
- Drawings and a quotation follow once the layout and finish are fixed; acoustic performance is confirmed against that specific build.
- Production, packing and shipment are arranged to your delivery address, with installation guidance for the site team.
Send with your first message
- Room, wall location and the acoustic problem in plain words
- Measured opening width and height, floor-to-ceiling levels, deviations
- Leaf count, stack direction, track support constraints
- Adjacent finishes and any joinery the panels must match
- Quantities, delivery address, site programme, on-site party
- Elevations or marked-up plans plus photographs of the opening
Ready to specify your wall?
Send your drawings, measurements and site photographs to SANTERSON and we will review them against the panel configuration you have in mind. We work from your project requirements rather than a fixed catalogue specification, so acoustic performance, dimensions and finishes are confirmed for the build you actually need.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiry page