A design brief tells your supplier what the bathroom should look like. An enquiry tells them what to build. Mirror cabinets sit right in the gap between the two, because almost every one of them is made to measure. This guide walks through the information that turns a pretty rendering into a standard mirror cabinet quotation you can actually compare with others - and where projects usually lose time.
Why the mirror cabinet is the item that stalls a fit-out
Vanities, basins and taps have published sizes. A mirror cabinet rarely does. In our Mirror Cabinets range - which covers standard, tall, round and LED versions - finish, layout and dimensions are all specified per project, so the drawing, not the catalogue page, is what defines the product.
That flexibility is useful on site but awkward at quotation stage. If two buyers send two different levels of detail, they receive two prices that cannot be compared, and the cheaper one is usually the one with fewer requirements written into it. The fix is not a longer brief. It is a short, structured enquiry that answers the same handful of questions every time.
Start from the wall, not the cabinet
Before choosing a door style, pin down the conditions the cabinet has to live in. These four items decide most of the specification, and each one is cheap to answer early and expensive to change after production starts.
- Finished wall line. Send dimensions taken off the finished face of the tile or panel, not the structural wall. A 12 mm difference between substrate and finished surface is enough to put a cabinet proud of a recess or foul a towel rail.
- Basin and countertop relationship. State the centre-line of the basin, the height of the finished counter or vanity top, and whether the cabinet must clear a tap deck or an integrated basin. Mirror cabinets are usually set out from the basin, not from the door.
- Power and lighting. Say whether the mirror needs to be fed from a supply, where that outlet sits, and whether you want integral lighting or a separate vanity light above it. Integral lighting changes both the cabinet build and the electrical coordination.
- Substrate and fixing method. Timber stud, brick, or tile over plasterboard all fix differently. Tell us what is behind the wall so the mounting detail travels with the drawing instead of being solved on site.
Pick the format that fits the room
Most enquiries settle into one of four formats. Naming the format in your first message stops the supplier from quoting something you never intended, and keeps variants across a multi-unit project consistent.
| Format | Where it earns its place | What to specify beyond size |
|---|---|---|
| Standard Mirror Cabinet | The default for family bathrooms and guest WC conversions, where storage sits at mirror height. | Shelf positions, door swing, and whether the interior needs a shaver socket or cable route. |
| Tall Mirror Cabinet | Principal bathrooms and hotel rooms where linen, towels and toiletries share one unit. | Internal division between full-height and half-height compartments, and handle type for the upper door. |
| Round Mirror Cabinet | Powder rooms and soft-edged schemes, often paired with a curved vanity or arched niche. | Diameter, glass edge detail, and whether the storage is a single rear compartment or split. |
| LED Mirror Cabinet | Hotels and apartments where the mirror is the room's task light. | Switching arrangement, dimming or sensor preference, and the electrical specification to be confirmed for that project. |
Where a project mixes formats - standard cabinets in the guest bathrooms, tall cabinets in the ensuites - list them as separate line items with their own dimensions. One combined "bathroom mirrors" line is how units get substituted without anyone noticing.
The six lines every enquiry should contain
This is the part that makes quotations comparable. Send these six items in your first message and you will normally get a workable price back without another round of emails.
- Quantity and unit breakdown. How many of each format, and which room or unit type each one belongs to.
- Width, height and depth per item, with a note on which dimension is fixed by a recess and which can move.
- Finish reference. A paint or laminate code, a photo of an approved sample, or the matching cabinet line - not just "white".
- Glass and mirror detail. Bevelled or square edge, framed or frameless, demisted rear panel if required.
- Interior layout. Number of shelves, adjustable or fixed, plus any provision for sockets or cable routes.
- Delivery and access conditions. Site address, floor level, lift or stair constraints, and the delivery window your programme needs.
Where briefs and enquiries disagree
Three mismatches cause most of the delay on bathroom joinery packages.
Rendering dimensions presented as fact. A 3D view is drawn to scale, but the numbers in it are often estimated. Ask your designer for a dimensioned elevation before you send the enquiry, or mark clearly which figures are provisional - otherwise two suppliers will quote two different cabinets and both will claim to match the drawing.
Finish named by look rather than code. "Matte grey" covers hundreds of surfaces with different wear characteristics. In a hotel bathroom that sees daily cleaning, the difference matters within the first year. Reference a code or send a sample.
Electrical work left to the installer. Integral lighting, demisters and shaver sockets all need a supply in the right place before the cabinet goes on the wall. When that decision waits until installation, the cabinet usually has to come back.
What comes back from us, and what to check
A complete enquiry gets a specification drawing, not just a number. Read three things before you approve it: the overall dimensions against your own site survey; the internal layout, because shelf positions are where daily use is won or lost; and the fixing note, which should state how the unit attaches to your substrate.
For projects that also carry vanities, cabinetry and other joinery, mirror cabinets are worth ordering in the same package as the rest of the bathroom fit-out. Same finish codes, one production run, one shipment - which is exactly what our one-stop furniture and building materials supply service is set up to handle, from specification through to door-to-door delivery.
If you are sourcing for an Australian project, send the site state or territory with your enquiry. Freight routing and delivery conditions differ enough between capital cities and regional sites that it belongs in the first email rather than the fourth.
Common questions
Can I enquire with only a photograph of the existing cabinet?
Yes, as a starting point. A photo tells us the style; it cannot tell us the depth behind the frame or what is behind the wall. Send the photo plus width, height and depth, and we will confirm the rest.
Is a made-to-measure cabinet slower than an off-the-shelf one?
The build itself is not the delay. The delay is in specification - chasing dimensions and finishes after production has started. A complete enquiry removes most of that.
Can we order mirror cabinets to match a vanity we have already chosen?
Yes. Send the vanity's finish reference and its top height, and the cabinet can be set out from it. Where the vanity is also coming from us - for example a single vanity in the same bathroom - both are produced to one drawing.
Send us your brief, your dimensions and your finish reference, and we will return a specification you can price against anything else on the table. Send them through our contact page, and include the site address so we can advise on delivery conditions for your location.