A wardrobe drawing that looks perfect on screen can still arrive on site with the wrong door opening, a hanging rail set too high for the room, or a finish that does not match the rest of the cabinetry. The difference is almost never design talent — it is the written specification behind the drawing. This guide walks through the eight fields we fill in for every custom minimalist bedroom wardrobe order, so buyers, builders and interior studios can send an enquiry that comes back with a firm, comparable quotation instead of a set of follow-up questions.
Rule of thumb: if a field is left blank in your enquiry, the factory will fill it in for you — usually with the option that is easiest to produce, not the one you wanted. Every item below is worth stating explicitly.
1. Room dimensions and what stands in the way
Send the wall length, wall height and depth available, measured at floor level and at ceiling level — older villas and renovated apartments are rarely square, and a 20 mm difference across a four-metre run changes every door size. Then list the obstacles in words: skirting boards, radiators, air-conditioning ducts, downlights, bay windows, sloped ceilings, light switches and door swings.
State how the wardrobe should relate to the shell. Flush-to-wall alignment, a scribed filler panel, or an integrated pelmet are all legitimate details in a minimalist bedroom, but they must be chosen before production drawings are issued, because each one changes the carcass size and the wall preparation your site team has to do.
2. Layout: plan the zones around how you actually dress
Minimalist doors hide the layout, which is exactly why the internal plan needs to be specified rather than left to the manufacturer. Split the interior into four groups and give each one a width:
- Hanging zones — short hanging for shirts and folded jackets, long hanging for dresses and coats, plus any pull-down rail for wardrobes that reach a high ceiling.
- Drawer zones — the number of drawers, their width, and whether they sit under hanging space or in a dedicated tower. Drawer-focused modular wardrobes work well for clients who wear mostly knitwear, socks and accessories.
- Shelf zones — state whether shelves are fixed or adjustable; adjustable shelving with a pitch of 32 mm is the practical default because it can be reconfigured when the season changes.
- Open and display zones — glass-front sections, open niches or a vanity bay. Where the whole bedroom wall is being fitted out, we usually design the wardrobe as part of a full height storage wall so the wardrobe, shelving and display niches share one module grid and one finish.
Add the small items in the same document: trouser pull, jewellery tray, shoe shelf, ironing board bay, laundry basket housing, and any built-in lighting. Each of these is a line item on the drawing and on the quotation, so listing them early prevents change orders later.
3. Door type — decide this before anything else
The door mechanism drives the clearance requirement, the internal depth and the price. Specify one of these:
| Door type | Where it belongs | What to write in the spec |
|---|---|---|
| Hinged (swing) doors | Beds and side tables clear of the front plane; larger bedrooms where a clean, handleless elevation is wanted. | Number of doors, hinge type and soft-close requirement, minimum clearance in front. |
| Sliding doors | Apartments and hotel rooms where a bed or furniture sits close to the wardrobe face. | Number of panels, overlap, track type, recessed or surface-mounted frame. |
| Open (no door) | Dressing rooms, boutique-style walk-ins, display wardrobes. | Frame profile, shelf spacing, dust-management expectation for the room. |
| Glass and aluminium frame | Interiors where light and depth matter; also useful in compact rooms. | Glass type (clear, frosted, bronze, smoked, ribbed), frame colour, handle detail. |
| Walk-in / dressing room | Villas and suites with a dedicated room or alcove. | Island unit, perimeter runs, seating bay, lighting circuit. |
If the elevation must read as one continuous surface, say so in the specification. A seamless wall of flush panels is achievable — we build it on whole-house projects such as our arched niche and full house custom wall cabinet project, where a full-height wardrobe occupies an entire bedroom wall with wood-grain panels aligned to the surrounding joinery.
4. Handle detail and hardware schedule
Handleless is the signature of the minimalist wardrobe, but "handleless" covers several different mechanisms with different costs and different feels in use. Name one:
- Recessed channel or J-profile pull along a vertical or horizontal edge.
- Push-and-release (touch-to-open) mechanism, useful where there is no finger gap at all.
- Integrated edge pull machined into the panel itself.
Then list the hardware separately rather than assuming it is included: soft-close hinges, drawer slides with soft-close and load rating, hanging rails, wall-mounted lighting profile and its transformer, plus any mirror or glass fixing. On our kitchen cabinetry we specify handleless minimalist fronts with soft-close fittings as standard practice, and the same discipline is what keeps a run of wardrobe doors silent and aligned after years of daily use.
5. Board material and surface finish
Write down two things separately: the substrate and the surface. Panel-board choices are specified per project and confirmed on the drawing; the visible surface is where the design decision sits. Our wardrobe collections are grouped by that surface, which makes it easy to name what you want:
Matte lacquer High gloss lacquer Acrylic — matte or high gloss Melamine — wood grain, solid colour, textured Wood veneer — oak, walnut, smoked Solid wood — oak, cherry, mahogany, walnut Glass in aluminium frame
For a bedroom that also contains custom bedsides, a vanity bay and a media wall, order the wardrobe from the same finish family as the rest of the joinery. A white acrylic wardrobe paired with matte lacquer panels in an adjoining room will read as two different whites under warm bedroom lighting, so we send physical finish samples for sign-off on multi-room packages rather than relying on a screen proof.
Also state the edge treatment — matching ABS edge banding on visible edges, and whether the carcass interior should match the exterior colour or use a lighter neutral interior. Interior colour matters more than most buyers expect once the doors stand open every morning.
6. Tolerances, fixing method and site interface
This is the section most enquiries skip, and it is where projects lose time. Cover four points:
- Survey responsibility. Who takes the final dimensions — your site team, or our surveyor on location? Made-to-measure sizing only works if the measurement comes from the finished room, after flooring and plaster are in place.
- Fixing method. Wall fixing, ceiling fixing, or freestanding with a scribed top. Confirm what is behind the wall: stud, brick, plasterboard, or a service run that must not be drilled.
- Floor and ceiling interface. Under-floor heating, thick rug, sloped ceiling or cornice all change the base detail.
- Electrical interface. Interior lighting needs a feed decided before the walls are closed, plus the location of the switch or sensor.
Our workflow follows the same sequence for a single wardrobe as for a whole villa: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. The specification you send determines how quickly that second stage closes.
7. Packaging, delivery route and installation
Built-in wardrobes are panel freight, not boxed furniture, so the logistics section of the specification should name the delivery address, the access conditions (lift size, stair width, ground-floor only), and who receives the goods. We arrange sea, air and rail freight with customs paperwork and door-to-door delivery, and panels travel packed for container loading with hardware separated and labelled to the matching panel code.
Then state who installs. Options are our on-site installation team, your own joiner working from our assembly drawings, or a hybrid — us on site for alignment of handleless fronts and door gaps, your tradesman for fixing and making good. Door gap tolerance is the item to write into the handover checklist: consistent reveals across a run of flush doors is what makes a minimalist wardrobe look expensive.
8. Project context and quantities
A hotel fit-out, an apartment block and a private villa are specified differently even when the design is identical. Tell us the room count, whether units repeat across floors, and whether samples or a mock-up room are required before series production. Repeatable layouts are exactly where combination modular wardrobes pay off: one agreed module set, then variations in width and finish per room type. For apartment and hotel packages we supply the same way we supply custom built-in kitchen cabinets as interior fixtures — matched panel materials, supporting hardware, and drawings that your site team can follow without translation.
SANTERSON has manufactured furniture and building materials since 2008 and works as a one-stop furniture and building materials supplier, so wardrobes are usually ordered alongside the flooring, wall panelling, doors, lighting and vanities of the same project. Coordinating those in one specification round removes the finish mismatches that appear when each trade is procured separately.
A short specification template you can copy
- Project name, country, room count, target on-site date.
- Wall length / height / depth at floor and ceiling; obstacles list; photos of the empty room.
- Layout: hanging lengths, drawer counts, shelf pitch, open zones, accessories.
- Door type and mechanism; handleless method; soft-close requirement.
- Substrate and surface finish, edge banding, interior colour, sample request.
- Fixing method, wall construction, floor and ceiling interface, lighting feed.
- Packaging standard, delivery address and access, Incoterms preference, installer.
- Sign-off sequence: drawing approval, finish sample approval, then production.
Send the eight fields above with your drawings, and the quotation that comes back should be a priced specification you can compare line by line — not an estimate that changes once production starts.
Frequently asked questions
What depth should a minimalist wardrobe be?
Plan around the door. Hinged doors need the full hanging depth plus the door thickness and clearance in front; sliding doors save that front clearance but take their own depth in the track. The internal layout you choose sets the minimum, so we confirm it from the drawing rather than applying one standard number to every project.
Can handleless doors be re-ordered or repaired years later?
Yes, provided the hardware schedule was recorded at order stage. That is why we issue a component list with hinges, slides and opening mechanisms named — replacement panels and spare parts are made against that record.
Do you produce a sample before series production?
For multi-room packages we supply finish samples for written sign-off, and where the client wants a full reference, a mock-up of one wardrobe run is produced first. This is standard practice on apartment and hotel projects.
Next step
Send the room measurements, your layout notes and the finish you are working towards. Our design team returns production drawings with the internal zones, door mechanism and hardware schedule written out, so what you approve on paper is what arrives on site.
Contact SANTERSON for a wardrobe specification review and quotation — Contact Us.