An open modular unit looks simple on a drawing: shelves, niches, a run of carcasses along one wall. It is the least complicated item to specify and, at the same time, one of the easiest items for a project to lose weeks over — because approval of that one wall usually passes through more hands than any single piece of loose furniture. Interior designer, architect, client representative, builder or site contractor, procurement, and sometimes a brand or facilities team all have a say.
When those approvals are planned rather than improvised, the joinery package stops being a source of delay. This guide sets out how to structure sign-off for open modular units in villa, hospitality and office projects: who signs what, in which order, and which details must be fixed before production starts.
Why one wall of shelving involves so many signatures
Open modular units sit at the junction of three decisions that different stakeholders own. The designer owns appearance — proportion, finish, what is displayed and what is hidden. The builder or site contractor owns the reality of the wall — flatness, floor level, skirting, the position of sockets, switches and downlights, and where services run behind the plasterboard. Procurement owns cost, delivery date and the sequence in which trades arrive.
Because no single party owns all three, an unsigned or half-signed drawing tends to come back later as a site problem: a unit that will not sit flush against an out-of-plumb wall, a shelf that lands on a socket, a finish approved by the designer but never shown to the client. The fix at that stage is usually rework.
The other reason approvals matter for this category specifically is that these are made-to-order items. Our Modular Living Systems range — including open modular units, closed modular units and configurations that combine both — is produced to project-specific dimensions, layout and finish. Nothing on this list comes off a shelf, so the approval moment is also the point of no return for size, layout and material.
Map the approvers before you draw anything
Before any shop drawing is issued, write down four columns: who decides, who reviews, who is informed, and what deadline each of them has. In practice that list usually covers:
- Interior designer or design lead — approves elevation, proportion, finish, door and shelf layout, and any integrated lighting detail.
- Architect or documentation team — confirms the unit does not conflict with structure, fire egress, skirting lines or wall finishes.
- Builder or site contractor — confirms setting-out dimensions, wall and floor condition, service locations, and which trade prepares the wall before installation.
- Client representative or owner — signs off appearance and budget, and is the person who will notice a change at handover.
- Procurement or project manager — holds the schedule, purchase order and delivery sequence.
- Facilities or brand standards team — relevant in hotels and offices where finishes must match an existing standard.
Two rules keep this list from turning into a committee. First, name one accountable approver per decision area rather than a group; if three people can say no, nobody tends to say yes. Second, record the review window for each person in working days and put it on the drawing issue sheet, because an approval schedule with no stated turnaround is how a single comment turns into a lost week.
Split the approval into three gates
Trying to approve layout, finish and price in one email thread is how projects end up re-approving everything twice. Three separate gates, each with a defined output, is cleaner.
Gate 1 — Layout and setting-out
What is approved: overall width, height and depth; bay divisions; where open shelving ends and closed storage begins; clearance in front of the unit; relationship to doors, radiators and lighting. The output is a dimensioned elevation signed by the design lead and the site contractor together, because both own parts of it.
For projects that use interior design services, this is also the stage where furniture layouts and 3D renderings do real work: a rendering settles arguments about proportion faster than a line drawing, and it gives the client representative something they can react to.
Gate 2 — Materials, finishes and specification
What is approved: substrate and board specification, veneer or laminate species and grain direction, edge treatment, shelf thickness and span, hardware, and any integrated lighting with its electrical detail. The output is a signed specification sheet plus physical samples in the hands of the approver.
Avoid accepting a finish approval from a screen alone. Veneer figure, sheen level and how a colour reads against the room's lighting are the three items most often reversed after production has begun. Issue samples with a reference code, ask for the signed sample back or a written confirmation quoting that code, and keep both.
Gate 3 — Price, delivery and installation sequence
What is approved: final quantity against the signed drawing, packaging and delivery method, who receives the goods on site, which trades are complete before installation begins, and how any snag list will be handled at handover. The output is a purchase order that references the Gate 1 and Gate 2 documents by revision number.
Decide what counts as approval, in writing
Most disputes are not about the content of an approval but about whether one was ever given. Set the standard up front: a reply to a numbered drawing revision, by named email, with the revision number quoted, is an approval. Silence is not an approval. Verbal agreement on site is not an approval.
Pair that with two practical controls. Keep one revision register for the joinery package — every drawing carries a number and date, and superseded revisions are marked as void so nobody fabricates from an old file. And require that any change after Gate 3 is recorded as a variation with its cost and schedule effect stated, even when the client accepts it immediately. A change accepted verbally at a site meeting and never priced is a common cause of a surprise invoice at the end of a fit-out.
Site conditions to close out before fabrication
The approval package should not be considered complete until the site side has confirmed the items that decide whether the unit will physically go in. For open modular runs these are consistent:
- Wall flatness and plumb — how much scribe or packing is allowed, and who fills the gap.
- Floor level and finished floor height — whether the unit sits on the finished floor or is set into it, and what happens where flooring meets the carcass.
- Services — sockets, switches, data points and downlights that must be relocated, protected or routed behind the unit.
- Skirting and architrave — removed, cut around, or detailed as returning behind the unit.
- Adjacent finishes — who trims the plasterboard edge, paint line, and reveal detail where the unit meets the wall.
- Access for delivery — lift size, stair width, corridor turns and protection requirements on site.
Where a project is being furnished from overseas, the access question extends further than the front door: container type, port, and whether goods are delivered to site or to a holding point all need an owner before shipment. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading through to delivery, but the receiving arrangement on site still has to be named by the project team.
A worked sequence for a villa living room
Take a typical residential example: one wall of open modular shelving with a lower closed run, in a villa living room that also carries a television and integrated lighting. One possible approval sequence runs as follows.
| Step | Document issued | Approver |
|---|---|---|
| Brief and concept layout | Space plan, mood and finish direction | Client representative |
| Setting-out elevation | Dimensioned elevations, bay divisions | Design lead + site contractor |
| Specification and samples | Board, veneer and hardware schedule; lighting detail | Design lead + client |
| Site condition confirmation | Service locations, floor level, scribe detail | Builder / contractor |
| Order release | Purchase order against signed revisions | Procurement |
| Handover sign-off | Snag list, as-built notes | All parties |
The point is the order, not the duration. Each stage should have a review window agreed with the people who have to meet it, and no stage should start on the strength of an unapproved drawing.
What to send your supplier at each gate
A manufacturer cannot protect a project from an approval gap, but a good one will surface it early. To keep the process tight, send rather than describe:
- Coordinated drawings — elevations with levels and dimensions, not sketches or marked-up photographs.
- A finish schedule by code — substrate, surface material, sheen, edge detail, hardware model.
- Named electrical requirements — where lighting is integrated, what switching and driver access is expected, and who supplies the electrician's connection.
- The site condition report — wall, floor and service information from the contractor, not assumed dimensions.
- A single point of contact — one person authorised to answer technical questions and confirm changes.
Where a project needs items built to its own detail rather than a catalogue configuration, custom furniture manufacturing and OEM service covers bespoke design and prototyping alongside material and finish selection. The same approval discipline applies: the prototype or sample stage is Gate 2, and it should be signed before full production is released.
Checklist: approvals complete?
- Layout — elevation signed by design lead and site contractor, revision number recorded.
- Finish — physical samples approved in writing, code quoted in the confirmation.
- Site conditions — wall flatness, floor level, services and skirting treatment confirmed by the contractor.
- Electrical — integrated lighting detail signed, driver access agreed, electrician's scope defined.
- Commercial — purchase order references signed revisions; variations priced as they arise.
- Delivery and installation — receiving party named, access route confirmed, pre-installation trade completion listed.
- Handover — snag process and the person who signs it agreed before installation starts.
None of this is complicated. It is a decision made in advance about who signs each part of one wall, plus a record that they did. Projects that do it once at the start spend the rest of the job building; projects that do not spend it re-drawing.
For open modular units and the wider Modular Living Systems range, or to coordinate a joinery package with design, production and delivery under one supplier, contact SANTERSON to discuss your project.