A floor-to-ceiling modular system looks simple on a drawing: one wall, one run of units, one finish. On site it is a different matter. The unit has to meet an uneven floor, clear a skirting board or a downlight, carry a television and books without sagging, and still read as a clean built-in next to the flooring, wall panel and lighting already specified for the room. Most problems we see in enquiries come from details that were not decided before production. The list below is how we settle those details at SANTERSON so that Santerson Floor to Ceiling Modular Systems arrive ready to install.

1. The real dimensions of the wall, not the drawing dimensions

Storey height varies within one building: slab thickness, screed, finished floor build-up and ceiling voids all change the clear height. Send us the clear height at several points along the wall — floor finish level to ceiling level — plus the wall length, and note anything that interrupts the run: doors, switches, radiators, air-conditioning grilles, skirting, cornices or a recessed niche.

Where the wall is being built or replastered, tell us which comes first. A system designed to sit into a finished opening needs an accurate opening; a system installed before the wall finish needs a tolerance allowance instead. We build made-to-measure, so we would rather work from measured site figures than a nominal grid.

2. What the system has to hold

Storage intent decides the carcass, the shelf spacing and the hardware long before colour does. Tell us whether the wall is for books, display objects, linen, tableware, media equipment or a mix, and roughly how heavy the loaded items are. Deep shelves for linen behave differently from shallow display shelving, and glass-fronted sections need different support than open cubbies.

  • Open versus closed ratio — which parts should be visible and which hidden behind doors
  • Hanging rail, drawers, deep cabinets or shelf-only bays
  • Appliances or AV equipment to be built in, with their ventilation needs
  • Child-safety and fixing requirements for tall units in family villas and guest rooms

If the wall also carries a television, we coordinate that as part of the same build rather than bolting it on afterwards — see Santerson Full Height Media Walls for the full-height media approach.

3. Materials and finish against the room already specified

Modular systems fail visually more often than structurally. The panel has to sit credibly beside engineered oak flooring, wall panelling, doors and joinery already chosen for the project. Send us the floor product, the door and architrave schedule, and any paint or laminate reference so we match grain, sheen and edge detail rather than approximate them.

Finish choice also drives durability in higher-traffic use. Lacquer, acrylic, melamine, wood veneer and solid wood each take wear, cleaning and light differently. A villa media wall and a hotel lounge wall carry different expectations even when the drawing looks identical. Where the same finish must continue across wardrobes, sideboards and tall cabinets, we produce them together so the batch matches.

4. Electrical, lighting and services

Decide this before production, not at handover. Backlit niches, integrated LED shelving, cable routes for a television, sockets inside a closed cabinet and charge points behind open shelving all need cut-outs, channel positions and driver access planned into the panels. Confirm switch positions, socket heights and which side of the carcass the drivers sit on so maintenance access is not blocked by a fixed panel.

For feature walls with lighting integrated into the shelving, we coordinate the electrical layout with our own drawings and send them to your site team for approval before manufacture.

5. Installation conditions and sequencing

Tell us what the installers will meet: floor level tolerance, wall plumb, underfloor heating, plaster that must cure, lift and stair dimensions for long panels, and whether the units are delivered before or after flooring and paint. A full-height run in a multi-storey villa often needs to be split into panels that pass through the stairwell or lift, and that decision changes the joint detail.

Site condition to confirmWhy it changes the design
Floor level difference along the runDetermines scribe pieces, plinth height and where the base line is set
Wall plumb and existing skirting or corniceDetermines whether panels are scribed, recessed or front-packed
Underfloor heating or wall heatingAffects fixing method and material movement allowance
Lift, stair and doorway sizesSets maximum panel length and how the run is broken up
Trade sequence (flooring, paint, stone)Sets site-protection needs and final joint detailing

6. Project volume, phasing and packaging

For apartment blocks, hotel floors or multi-unit villa schemes, tell us the repeat count per room type and how the delivery is phased. Repeating one configuration across many rooms lets us fix a single approved detail and produce it consistently; mixed layouts need a schedule per room. We package to the site sequence so crews receive the right bays in the right order rather than one large container to sort out on the day.

How we take it from enquiry to installed

Send the measured wall information, the storage brief and the finish references. We come back with layout drawings and a quotation for your confirmation; once details are approved we manufacture, then arrange door-to-door delivery, on-site installation and snagging through our Turnkey Solutions service. Because the same team handles joinery, wall panelling, wardrobes and loose furniture, a storage wall can be matched to the rest of the fit-out instead of ordered as an unrelated item — see Santerson Full Height Storage Walls for the wider built-in range.

Before you send an enquiry, collect four things: measured clear heights at both ends of the wall, a room-by-room storage brief, the flooring and joinery finishes already specified, and the positions of sockets, switches and lighting. Those four items settle most of the specification before the first drawing.

If you are specifying a full-height wall for a villa, apartment or hospitality project, share your drawings and site measurements with our team and we will return a configuration, finish schedule and quotation matched to that space.