Open storage is one of those items that looks simple on a shopping list and complicated on site. It has to fit a niche that is never quite square, match finishes specified elsewhere in the build, survive humidity, and arrive in one piece with the rest of the joinery package. If you are buying it direct from a China-based maker for a villa, apartment or hospitality project, the difference between a smooth order and an expensive rework usually comes down to how much detail you lock down before production starts. This guide walks through how Santerson Open Storage is specified and made, and what an overseas procurement process actually looks like from enquiry to handover.
What you are actually buying
Santerson Open Storage sits in the company's Storage Units collection and is listed for residential bathroom projects. The catalogue entry does not fix a single size or material. Instead it states that finish, layout and dimensions can be specified to suit each space, with made-to-measure sizing and a choice of materials and finishes. That is the model across the storage and open-wardrobe range as well — Santerson Corner Storage, Santerson Drawer Units and the open wardrobe lines are described the same way: made-to-measure sizing, material and finish options, and a layout tailored to the project.
Two consequences follow from that. First, there is no off-the-shelf SKU to compare prices against, so quotations depend entirely on the drawings and schedule you send. Second, nothing about the finished item is fixed until you confirm it — substrate, door or no door, shelf spacing, edge treatment, hardware, wall-fixing method. Anyone who has watched a site team discover that an "open shelf unit" was assumed to have a back panel knows why this matters.
Why projects buy open storage direct from the factory
SANTERSON describes itself as a furniture and building materials manufacturer and one-stop solution provider headquartered in China, with project work across villas, hospitality and offices. For a buyer, the practical appeal of going to the manufacturer rather than a local reseller is coordination. The same supplier can produce the open storage, the vanity and countertop package, the kitchen cabinetry, the wardrobes and the wall panelling, which means one set of drawings, one production schedule and one shipment instead of four vendors arguing about who owns the reveal between a shelf and a tiled wall.
The company's service pages also describe custom and OEM work: furniture design and prototyping, bespoke finishes and textures, 3D modelling, material choices such as wood, metals, engineered stone and laminates, plus flexible minimum order quantities. For a single villa that matters less; for an apartment batch or a hotel floor where the same open storage detail repeats across units, batching identical modules is exactly where direct manufacturing pays for itself.
The specification pack to send before you ask for a price
Overseas quotations go wrong when the enquiry is vague. Send a package the factory can build from without guessing:
- Measured setting-out drawings. Overall width, height and depth, plus the wall build-up (stud, tiled, concrete) so the fixing detail is designed rather than improvised on site.
- A finish schedule. Sample or reference code for carcass and shelf, not a colour name. "Oak" means several different things across factories.
- An internal layout. Shelf heights, adjustable or fixed, drawer units, whether services or sockets need to be concealed or routed around.
- Environment notes. Wet zone or dry zone, distance from shower or basin, ventilation. This drives board and edge choices in a bathroom.
- Quantities by type. How many of each module, so batch pricing and container loading can be planned properly.
- Handover expectations. Flat-packed with an assembly drawing, or assembled and crated. This changes packaging, freight volume and site labour.
A practical procurement sequence
| Stage | What happens | What you confirm at this stage |
|---|---|---|
| Enquiry and design | Drawings and finish schedule reviewed; the supplier's design and planning service covers space planning, material selection and product specification. | Shop drawings signed off, with every dimension, edge and fixing method shown. |
| Quotation | Priced by module, including packaging. Freight is quoted separately. | Inclusions and exclusions in writing, plus which Incoterms apply to your port. |
| Prototype or first article | For repeat or high-risk details, one unit made for review before the full batch. | Actual finish, hardware feel, shelf deflection, door alignment. |
| Production and QC | Batch manufacture with quality control against the approved drawing. | A written acceptance standard, and photographs of packed units per order. |
| Logistics | The company's logistics page describes freight forwarding by sea, air and rail, customs paperwork including commercial invoices, packing lists and certificates of origin, packaging and container loading, shipment tracking and door-to-door delivery. | Your own importer obligations: duties, GST, biosecurity and inspection requirements in your country. |
| Installation and handover | The service pages list on-site installation, inspection and snagging, spare parts and ongoing maintenance. | Who sets out, who fixes to which wall, and who signs off the snag list. |
Details that decide whether open storage looks built-in or bought in
Made-to-measure is only useful if you spend the freedom well. A few decisions carry most of the visual and functional result:
- Proportion to the surrounding joinery. Shelf reveals, door rebate depths and skirting returns should match the vanity or wardrobe they sit beside. If they come from different factories, someone has to reconcile those drawings — decide early who that is.
- Open versus closed balance. Open shelves show everything. In a bathroom, plan what stays on display and hide the rest behind doors or in drawer units. Mixed open-and-closed arrangements usually age better than fully open ones.
- Edge and shelf thickness. Thin shelves sag under heavy bottles; thick edges read as heavy next to slim framing. Both are fixable at drawing stage and expensive after cutting.
- Fixing method. Wall-mounted open units need blocking or the right anchors for the wall build-up. State the wall type on the drawing, not in a site conversation months later.
- Wet-zone material choice. Board substrate, edge sealing and hardware grade should be specified for the humidity the unit will actually see.
Questions worth asking the supplier before you commit
- Which board, edge banding and hardware are quoted for a bathroom installation, and what is excluded from that specification?
- Can one unit be produced first for approval, at what cost, and how does that credit against the batch order?
- What exactly is in the packing: assembly drawings, fixings, labelled crates, spare panels?
- How are damages and shortages handled after sea freight, and what is the claim window?
- Are replacement shelves or matching later batches colour-matched to the original order?
Those five questions cost nothing and filter out most of the arguments that appear six months into a project.
Wrapping it up
Sourcing open storage from an overseas manufacturer is not a risk problem so much as a documentation problem. The product is made to your dimensions and finish, the supplier's own workflow runs from design and planning through production, logistics and installation support, and the outcome is governed almost entirely by how complete your drawings, finish schedule and acceptance criteria are before cutting starts. Treat the specification stage as the real work and the rest of the order becomes routine.