A two tone shaker kitchen is specified long before it is installed, and most of the disagreements appear afterwards: a door panel that does not match the sample, a hinge that sags in the second year, a replacement panel quoted as a new order. The cabinets themselves are made to measure for each project, so the after-sales conversation has to be just as specific as the drawing that produced them.
SANTERSON is a China-based furniture and building materials manufacturer supplying turnkey interior project solutions, including custom cabinetry for villas and residential kitchens. That end-to-end scope means after-sales is not a call centre ticket but part of the same chain that handled drawings, production and delivery. The questions below are the ones worth putting in writing before the purchase order is signed.
1. What exactly does the warranty cover on a made-to-measure cabinet?
Our installation and after-sales support page lists warranty coverage, spare parts and replacement, and ongoing maintenance as separate items, and that separation matters. A cabinet box, a door front, a hinge, a drawer runner and a painted finish do not fail at the same rate, and a single blanket sentence such as "five year warranty" tells a buyer nothing about which of those five items is included.
Ask for the coverage written out by component: carcass, door panel and finish, hardware, and worktop if supplied together. Ask what voids it — usually site conditions such as moisture exposure before the kitchen is enclosed, or on-site cutting that was not shown on the approved drawing. Then ask how a claim is evidenced, because a photo of a misaligned door is only useful if the as-built drawing and the finish code were recorded at order stage.
2. Which parts are held as spares, and in what colour?
Two tone designs multiply the spare-parts problem. A run may combine a pale upper with a deeper lower in a different finish, so one replacement door is not one item but two possible codes. Painted and lacquered fronts in particular can shift slightly between production batches, which is why a panel ordered eighteen months later may not read as a match against the original.
Practical questions to put to any supplier:
- Are the exact finish codes and batch references for our fronts recorded on the order file?
- Which hardware items — hinges, runners, handles, adjustable feet — are stocked as spares rather than re-manufactured on demand?
- Can a set of spare door fronts be shipped in the same container as the original order, so one future replacement does not require a new minimum order?
- Is a spare front produced from the stored panel data, or would it need to be re-drawn and re-sampled?
Our custom and OEM service covers bespoke finishes and textures, which is exactly why the finish code should sit on the paperwork rather than in an email thread. Buyers specifying several colourways across a villa or an apartment scheme should ask for one consolidated finish schedule listing every code used, per room.
3. Who installs, and who signs off the snags?
Made-to-measure cabinetry is only as good as the wall it is fixed to. Ask whether installation is carried out by the supplier's own team or by a local contractor you appoint, and where responsibility transfers. If a local tradesman fits units built overseas, a warped door can be blamed on either side unless there is a documented handover.
Agree the inspection step before it happens: which tolerances are checked (door alignment gaps, drawer run-out, worktop joints against the wall line), who records the snags, and by when they are closed. Our service navigation describes on-site installation with inspection and snag lists as part of the workflow; what a buyer should confirm project by project is who performs that inspection in their country and what form the record takes.
4. How fast does a response actually arrive?
Marketing pages quote response targets, including rapid resolution times. Treat those as starting points for negotiation rather than commitments, because response speed across time zones depends on who is assigned to your project. The workable version of this question is: which named person handles after-sales for our order, what is their working window against ours, and through which channel — email, WhatsApp or phone — is a claim logged so there is a traceable record.
For a kitchen this usually means one thread that already contains the drawings, the finish schedule and the delivery notes, instead of a fresh conversation with a different salesperson each year.
5. What happens when only one component fails years later?
The realistic failure list on a two tone shaker kitchen is small and specific: a hinge cup pulling from a door, a drawer runner failing on a heavily used base unit, a scuffed lower front in a high-traffic galley, an end panel that was never protected during other site works. Each has a different remedy — a hardware swap, a single replacement front, or a full door re-finish.
Ask the supplier to state the remedy path for each case and what it costs at the point of order, not after the failure: whether a replacement front ships flat-packed with the fixings, whether a re-finish can be done on site or requires the panel back in the factory, and how freight for a small parcel is handled. Freight on a single door is often the largest line in a repair, and it is settled far more cheaply when the packing list and shipping documents are already on file from the original order.
6. What documentation should be archived after handover?
Every after-sales outcome improves if the buyer keeps a project folder containing: the approved as-built drawings with every dimension and unit code, the finish schedule with codes for each colourway, the hardware specification with brands and model references, the packing list and container reference from delivery, and the signed snag list from installation. This is the same documentation our one-stop solution workflow produces during design, production coordination and handover — asking for a complete copy at handover costs nothing and prevents an argument later about what was actually ordered.
A short pre-order checklist
- Warranty stated per component: carcass, fronts and finish, hardware, worktop.
- Finish codes for every colourway recorded on the order file and in one consolidated schedule.
- Spares plan: what is stocked, what is re-made, and whether spare fronts can travel with the first shipment.
- Named installer and named after-sales contact, with a logged claim channel.
- Inspection and snag procedure agreed before installation, with tolerances written down.
- Remedy path and freight method for single-part replacement, agreed at order stage.
- Complete document copy received at handover and archived by the buyer.
Two tone shaker cabinets are specified as made-to-measure units with project-specific dimensions and finish options, so the after-sales terms should be equally specific. Get them in writing before production starts, and the follow-up years become a filing exercise instead of a negotiation.
Send your drawings, colourway list and quantities through our contact page to discuss cabinetry scope for your project.