An 8-metre swim spa is not a purchase you can reverse once the crane has placed it. Before you send an enquiry about Outdoor Swim Spa WS-130AⅣ-U, a handful of decisions and drawings will turn a vague price request into a quotation you can actually compare with two or three others.

Start with the model page, not with a question

The published specification for WS-130AⅣ-U gives you a working baseline: catalog dimensions of 8000 mm long, 3000 mm wide and 1400 mm deep, one control system, four water pumps, one filter pump, twenty-three jets in total, five LED lights and a total power figure of 11.85 kW. The features listed for this configuration are water jets, LED lighting and ozone.

Those numbers describe the catalogue configuration, not your finished build. Treat them as the starting point of a specification conversation rather than as an order form, and ask the supplier to restate every figure against the exact configuration you want.

Check which variant you are actually asking about

The 130 A family is published in two versions with the same shell size but different equipment. The Outdoor Swim Spa WS-130AⅣ listing carries a swim training system, one water pump, twenty jets, seven LED lights and 10.85 kW of total power. The -U version shown above drops the swim training system in favour of four water pumps, twenty-three jets, five lights and 11.85 kW.

That difference changes how the vessel is used: one is set up for lap-style swimming against a flow, the other leans towards jet-driven hydrotherapy across several seating positions. Decide which of those two jobs matters more before you request a price, because asking for both in one enquiry produces a quotation that nobody can compare fairly.

Have your site information ready

The supplier cannot size foundations, access or plant space without knowing where the unit is going. Before you write, gather:

  • a plan of the intended position with clear dimensions, plus a photo or two of the approach route from the delivery vehicle;
  • whether the spa will sit fully above ground, partly recessed, or on a deck or platform, and what the supporting surface is made of;
  • how the unit reaches the site — crane lift, forklift, or a manual carry through a side passage — since an 8000 mm shell will not turn corners that a garden shed turns easily;
  • drainage and overflow arrangements at the position, and any boundary or setback rules your local authority applies to water features;
  • for a hotel, resort or multi-unit residential project, the room or zone schedule the spa is meant to serve, so usage intensity can inform the specification.

You do not need these resolved to send an enquiry, but each unresolved item becomes a round of email and a delay in pricing.

Sort out power before you talk about jets

A total connected load in the region of 10–12 kW is not a domestic socket problem. Ask your electrician, in advance, what supply and protection can be provided at the plant location, and put that answer in writing in your enquiry: available supply phase and capacity, the distance from the main switchboard to the spa, and whether a dedicated circuit and isolation can be installed.

Also state which parts of the electrical installation sit with the supplier and which sit with your contractor. Equipment leaving the factory must match the voltage, frequency and protection arrangements available on site; discovering a mismatch after production has started is expensive.

Decide what you want heated, filtered and treated

The catalogue lists options for this range including control systems, UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so confirm each option against the specific unit rather than assuming it is offered across the range.

DecisionWhat to specify in your enquiry
HeatingTarget water temperature, whether the spa runs year-round, and whether a heat pump is included or supplied locally.
InsulationWhether insulated shell and cover are part of the quoted build — this drives running cost more than any single jet.
FiltrationFiltration type and cycle, plus who supplies consumables once the unit is handed over.
SanitationOzone is listed for this configuration; if UV sterilisation is also wanted, ask explicitly whether it can be combined.
AccessSteps, handrail positions and entry height relative to your deck or platform level.
LightingNumber and position of LED fittings and whether colour control is part of the control system.

Ask for a quotation you can compare line by line

Suppliers quote differently, which makes price comparison misleading unless the scope is fixed. Ask each supplier to break the quotation into: the vessel and its listed equipment; options selected; packaging; freight mode and route; insurance; duties and taxes; on-site placement; commissioning; and spare parts. State your preferred delivery terms so landed cost, not just factory price, is visible.

For cross-border orders, ask what documentation comes with the shipment — commercial invoice, packing list, certificate of origin and any import paperwork you need locally. SANTERSON describes logistics support covering freight forwarding, customs paperwork, packaging and container loading through to door-to-door delivery; confirm the exact scope, Incoterms and responsibilities for your own order rather than assuming a service level.

Think about the surrounding space at the same time

A swim spa rarely arrives alone. Poolside loungers, shade structures, storage for chemicals and covers, and hard surfaces underfoot are usually specified together, and coordinating them with one supplier reduces the gaps between trades. The outdoor furniture range includes aluminium cabana daybeds, sling sun loungers with adjustable backrests, pergolas and dining sets that typically sit in the same zone as a swim spa.

Where a project needs non-standard dimensions, finishes or branding, Custom & OEM Service covers bespoke sizing, material and finish choices and product marking. Confirm current options, minimum order quantities and lead times for your specific requirement.

What to attach to your first enquiry

  • Model reference — WS-130AⅣ-U — and the intended use: hydrotherapy, family swimming, or a hospitality facility.
  • Site plan with dimensions, access route photos, and how the unit is to be placed.
  • Confirmed electrical supply details from your electrician.
  • The option list you want priced, item by item.
  • Delivery location, preferred delivery terms and required target date on site.
  • Whether matching poolside furniture or other fit-out items should be quoted in the same package.

Send that much information and a supplier can respond with a configuration, an itemised price and a realistic production window in one reply instead of a request for more questions.

A short note on verification

Dimensions, equipment counts and power figures above are reproduced from the published catalogue entries for these models. Confirm them against your confirmed configuration in writing before production begins, and ask the supplier to state what is included as standard and what is optional. Import requirements, local building rules and electrical standards differ by country and remain your responsibility to verify with local professionals.

To discuss a WS-130AⅣ-U configuration for a villa, resort or residential project, contact SANTERSON with your site plan and electrical details, and the enquiry can move straight to specification and pricing.