A wardrobe quote that looks complete can still leave the expensive decisions open. Two suppliers can price the same bedroom run very differently because one has specified the glass tint, the frame finish and the internal layout, while the other has priced a generic sliding wardrobe and added "bronze glass" as a description. Before you compare numbers on bronze glass aluminum frame wardrobes, check what each line of the quote actually commits the supplier to build.

1. The specification, not the product name

Product titles travel badly between suppliers. What you need in writing is the make-up of the door: glass type and tint, aluminium frame profile and surface finish, and whether the bronze tone sits in the glass itself or in a coating applied afterwards. Ask for the frame colour reference and the glass description to be repeated on the drawing, so the sample you approve and the unit that arrives are described by the same words.

Our Bronze Glass Aluminum Frame Wardrobes sit within the glass and aluminium frame range, where finish, layout and dimensions are set per project rather than chosen from a fixed size grid. That is normal for built-in joinery, but it means an early quote can only be as accurate as the information attached to it.

2. Dimensions and how they were taken

Check whether quoted widths and heights are finished opening sizes or manufactured case sizes, and whether out-of-square walls, skirting, cornices, ceiling level and any bulkhead have been allowed for. A quote that lists one overall size per room will hide variation across a villa or apartment run. For multi-unit work, ask for a dimension schedule by room number so each wardrobe is priced against its own opening.

Also confirm what happens if site dimensions move after production starts. Made-to-measure joinery cannot simply be trimmed on site, so the cut-off point for revised measurements should be written into the order, together with who pays for a re-made panel.

3. Internal layout and hardware

Glass frontage is only half of what you are buying. Compare quotes on what is behind the doors: hanging rails, shelf heights, drawer counts, tall or corner configurations, lighting provisions and soft-close fittings. A lower price usually comes from fewer drawers and thinner carcass boards rather than better manufacturing.

If your layout sits at a boundary between collections, check the adjacent options before you lock the drawing — aluminium frame glass wardrobes and glass sliding door wardrobes are specified differently, and the clearance each door type needs affects whether a narrow bedroom can open properly.

4. Inclusions, exclusions and delivery terms

Read the exclusions line before the total. The items that quietly change a project budget are usually the same list every time: installation labour, protection of finished floors on site, freight to the door, port charges, duties, hoisting to upper levels, and disposal of packaging. For an international order, ask which Incoterms apply, what is covered by cargo insurance, and where responsibility for damage transfers from supplier to buyer.

At SANTERSON we handle furniture and building materials as one package, so wardrobes can be ordered alongside interior fixtures and the adjoining finishes, with logistics coordinated from our China factory to door-to-door delivery. That does not remove the need to read the terms — it just means one supplier is accountable for more of the list.

5. Samples and approvals before production

Bronze glass reads differently against warm timber, dark stone and pale paint, and it shifts again under artificial light. Ask for a physical sample of both the glass and the frame profile, view it in the actual room, and have the signed sample referenced by number on the production drawing. Confirm who signs off the sample, when sign-off closes, and what happens if two rooms were approved against different samples.

6. Lead time, packaging and site sequence

Ask for lead time measured from confirmed drawings and signed samples, not from the date of the quote. Then check how the units are packed and palletised, whether glass fronts ship loose or assembled, and how deliveries are sequenced against other trades on site. Built-in wardrobes installed early get damaged by painting and flooring work that follows; installed late they hold up handover.

7. After-sales terms in writing

Finally, check what the quote says about defects and replacement parts: which components are covered, for how long, who supplies spare doors or runners if one unit is damaged in transit, and whether an installer or a local contractor fits the units. If installation is included, ask who signs off snags at completion.

A quick pre-order checklist

  • Glass tint and frame finish named on both sample and drawing
  • Dimension schedule by room, with revised-measurement cut-off stated
  • Internal layout itemised: shelves, drawers, rails, lighting, fittings
  • Delivery terms, insurance point and exclusions read in full
  • Signed sample reference number quoted on the production order
  • Lead time dated from confirmed drawings, plus packaging and delivery sequence
  • Defect cover, spare parts and snag sign-off written into the order

A quote that answers these points costs more to prepare and far less to run. Send us your drawings, room schedule and finish preferences through our contact page, and we will price the wardrobes against a specification you can hold us to.