A U-shaped corner wardrobe usually looks simple on a rendering and complicated on a purchase order. Two returns, three runs of hanging rail, one carcass depth that no longer matches the door schedule — and the joinery package arrives on site with pieces that do not belong to the same room. The layout itself is rarely the problem; what causes rework is ordering a three-leg corner system as if it were a straight run of wardrobes. Below is how buyers, contractors and interior teams count quantities and coordinate the surrounding products before anything goes into production.
Why U-shaped corner wardrobe quantities go wrong
A U Shaped Corner Wardrobe wraps storage around three walls, so the plan involves more than one straight elevation. Each leg has its own height, depth and internal configuration, and the two returns meet the wall at angles that are rarely exactly 90 degrees on site. When quantities are taken from a floor plan alone, three things typically go missing: the corner transition pieces, the scribe and filler panels that absorb out-of-plumb walls, and the door schedule — whether the fronts are hinged, sliding or open.
SANTERSON manufactures these as made-to-measure built-in furniture rather than flat-pack modules off a shelf. The Corner Wardrobes collection is specified per project for finish, layout and dimensions, which means the quantity sheet has to carry those choices as well as the linear metres. Getting that sheet right before production is what keeps the second and third coordination steps from turning into change orders.
Step 1: Fix the layout type before you count anything
The same room can be solved with different corner layouts, and each one produces a different quantity list. Decide which you are buying first:
- U-shaped run — three connected legs. Most storage volume, most components, and the layout that needs the clearest access clearance in front of it.
- L-shaped run — two legs. Fewer carcasses and fewer corner parts; a common choice when one wall carries a window, door or services. See L Shaped Corner Wardrobes for that configuration.
- Walk-in with perimeter storage — the wardrobe becomes a room. Quantities then include partitions, island or bench elements and the enclosure itself; U Shaped Walk in Wardrobes covers that scope.
This choice also decides what the door schedule looks like. A U-shape with hinged fronts needs swing clearance on all three legs; the same shape with sliding fronts changes the track and panel quantities instead. Compare Hinged Door Corner Wardrobes and Sliding Door Corner Wardrobes before locking the front type.
Step 2: How to take quantities line by line
Count in the order production consumes the information. For each leg of the U, record:
| Line item | What to record | Why it matters for ordering |
|---|---|---|
| Carcass length per leg | Finished external length of each of the three legs, plus the inside dimension at each corner | Sets the number of carcass sections and where corner units sit |
| Depth | Clear depth at the deepest point and at each return, including skirting, insulation or cladding build-up on the wall | A single depth across all three legs is unusual; measure each leg separately |
| Height | Floor to ceiling at several points along each leg, not one spot | Determines whether top panels, scribes or a soffit are needed |
| Internal configuration | Metres of hanging rail (short and long), drawer stacks, shelves, shoe or accessory units, lighting provisions | Interior fittings are priced and shipped per unit, not per linear metre |
| Fronts | Number, size, finish and opening type of every door or panel | Hinge counts, sliding tracks and mirror or glass fronts all follow from this |
| Corner and finishing parts | Corner units, filler and scribe panels, end panels, plinth or recessed base | The items most often left off a first quantity sheet |
Step 3: Coordinate the finishes that must match the wardrobe
A corner wardrobe rarely stands alone in a villa or hotel bedroom. Once the carcass is fixed, coordinate everything that touches it or reads against it:
| Element | Coordination point |
|---|---|
| Flooring | Plinth height and door clearance depend on the finished floor build-up. Engineered oak, plank and parquet choices change that level — see Engineered Wood Flooring. |
| Wall finishes and panelling | Wardrobe reveals sit against plaster, panelling or cladding. Confirm the wall make-up before fixing carcass depths; Wall Panels and Wall Cladding are ordered on the same schedule. |
| Doors and openings | Wardrobe doors need swing or slide clearance from the nearest room door. Windows and Doors positions should be checked against the front schedule. |
| Lighting | Internal cabinet lighting needs a driver position and a feed; exterior downlights must not clash with top panels. See Lighting Products. |
| Adjacent joinery | Kitchen, vanity and media cabinetry in the same storey should share door thickness, edge treatment and colour reference — Kitchen Cabinets and Hotel Appliances. |
| Rugs and soft furnishing | Access clearance in front of the U has to stay clear once rugs and beds are placed; Carpets and Rugs are part of that layout check. |
Where a project needs the wardrobe fronts to match another range exactly — for example a lacquered bedroom against a matte kitchen — Custom & OEM Service handles bespoke finishes and textures, and material choices across wood, metals, engineered stone and laminates are confirmed at the sample stage rather than assumed.
Step 4: Sequence the order so nothing waits on site
Built-in wardrobes sit late in a programme but must be ordered early, because they depend on completed wall and floor levels. A practical sequence:
- Confirm room levels, wall set-out and services positions; freeze the elevations.
- Issue the wardrobe quantity sheet with layout type, internal configuration and front schedule.
- Approve finish samples and any hardware before production release.
- Order the coordinated elements — flooring, panelling, doors, lighting — against the same drawing revision.
- Plan packing and container loading around the built-in package so carcasses are not crushed under loose goods; freight by sea, air or rail with door-to-door delivery is arranged through Furniture Logistics and Door-to-door Delivery.
- Book installation against the site's completion window, with inspection and snag list at handover — see Installation & After-sales Support.
For multi-unit work, quantities should also be grouped by room type rather than by floor. A villa project repeating the same bedroom layout across several storeys benefits from one wardrobe schedule replicated per unit, with variations listed separately — the approach used on our Turnkey Villa Furnishing packages.
Pre-production checklist
- Leg lengths, corner dimensions and clear depth at each return confirmed on site.
- Floor-to-ceiling heights recorded at multiple points; out-of-plumb allowance assigned to scribe panels.
- Hanging rail, drawer, shelf and accessory counts written per leg, not as one total.
- Front type fixed (hinged, sliding or open) with clearances checked against room doors.
- Finish samples approved and referenced by code on the order.
- Flooring, wall cladding, lighting positions and adjacent joinery listed on the same revision of the drawing.
- Packing list and container plan reviewed so corner units and glass fronts ship protected.
- Installation window agreed before shipment, not after delivery.
Common quantity mistakes to avoid
- One depth across all three legs. Returns usually differ once skirting, insulation or cladding is accounted for.
- Total linear metres instead of per-leg detail. Production needs the split; a single total cannot generate corner units.
- No allowance for wall tolerance. Filler and scribe panels are what make a made-to-measure fit look built-in.
- Interior fittings counted by metre. Drawer stacks and accessory units are discrete items.
- Fronts decided after carcass order. Sliding and hinged fronts change the carcass detail, not just the doors.