A raised panel wardrobe looks simple on a drawing: a frame, a field that stands proud of it, a finish. The price difference between two quotes for the same elevation usually comes from what was never written down. If your request for quote only says "built-in wardrobe, 2.4 m, cream", every supplier fills the blanks differently — and you compare three numbers that are not for the same wardrobe.

Below is the information we need to price Raised Panel Wardrobes properly, and what each item changes in the quotation. Send it with your first enquiry and you will get comparable prices back.

1. The room data, not just the nominal size

Give us the opening width, height and depth for every wall the wardrobe runs along, plus the floor-to-ceiling variation you have measured at both ends of that run. Older villas and renovated apartments are rarely square, and a 15 mm out-of-plumb wall changes whether we build a scribe, a filler panel or a rebate into the carcass.

  • Width, height and depth at three points per run (left, centre, right), in millimetres.
  • Skirting, architrave, cornice or recessed shadow gap that must be cut around or removed.
  • Position of switchboards, power points, downlights, air-conditioning grilles and door swings.
  • Ceiling type — concrete slab, gypsum bulkhead, raked ceiling — because a hinged door needs clearance above the frame.

2. Panel profile and door construction

"Raised panel" covers a wide range of mouldings. Tell us how much relief you expect on the door face, whether the stiles and rails are square or profiled, and whether the same profile should carry through to matching classic paneled solid wood wardrobes, doors or sideboards in the same house. If you have a sample door, a rubbing, or a photograph of an existing wardrobe you want to match, send it — profile matching is where a written description fails fastest.

  • Door type: hinged, sliding, folding or a walk-in run without doors.
  • Panel field: solid timber, MDF with veneer, or painted engineered board. State which you want quoted if undecided.
  • Frame profile drawing or reference image, with the raised height and rail width you expect.
  • Interior style continuity — whether the same moulding appears on paneled hinged wardrobes in adjacent rooms.

3. Substrate and finish, stated separately

Finish is not one line item. The substrate, the surface material and the sheen each affect cost and lead time, and a paint grade door cannot be swapped for a veneer door without changing the moulding. Name all three.

ItemWhat to specify
Carcass substrateMoisture-resistant board or standard board; thickness; edge treatment in visible areas.
Door substrateSolid timber, MDF, or engineered board — state if the doors are for paint or for a clear finish.
SurfacePaint colour with brand and code; veneer species and cut; lacquer or laminate. Send a physical chip if you have one.
SheenMatte, satin or gloss. High-gloss panels are quoted differently from matte painted ones.
Interior surfacesMatching interior colour, or a lighter standard interior lining.

4. The internal layout you actually intend to use

Interior fittings are where quotes drift most. Hanging space, shelf spacing and drawer counts should come from your wardrobe inventory, not from a generic plan. Send the number of long-hang items, the number of drawers per person or per bedroom, and whether you need a mirror, pull-out trays, trouser pull, jewellery tray, lighting inside the carcass or an ironing station.

If your layout is still open, ask us to price two options: a hanging-focused run and a drawer focused modular wardrobe layout. Two priced options on the same shell let you decide on cost per fitting rather than guessing.

5. Hardware, and who supplies it

  • Hinges: soft-closing or standard; concealed or visible; brand if you have a house standard.
  • Sliding gear: top-hung or bottom-rolling, track cover detail, and the door weight the gear must carry.
  • Drawer runners: full-extension, soft-close, run depth against your garment depth.
  • Handles or integrated routing: a routed handleless edge on a raised panel changes the moulding, so decide before quoting.
  • Integrated lighting: motion switch, door-activated, or recessed profile with a driver location stated.

State whether hardware comes from us or from your local supplier. Mixed supply is fine, but we need the sizes and load data of locally supplied gear before we cut the carcass.

6. Quantities, project stage and delivery terms

A single villa wardrobe and a forty-apartment rollout are quoted on different lines. Tell us the unit count, whether the wardrobes repeat across units, the site address for freight, and your Incoterms preference — FOB, CIF or door-to-door delivery. Give us the required on-site date and the date the joinery must be weather-tight, so production can be sequenced against your other trades.

For multi-unit work, ask for a price break at 10, 20 and 50 units. Repeating one carcass across many rooms is where made-to-measure manufacturing pays for itself.

7. Drawings and approvals you can attach

  • Room elevations with dimensions, even a marked-up plan sketch.
  • Finish schedule or sample reference numbers.
  • The name of the architect, designer or builder coordinating the site.
  • Any prior approval samples or approved mock-ups we should match.

If you do not have drawings, say so and send photographs plus your measurements. Our design team can turn that into shop drawings for your sign-off before production starts.

Ask every supplier to break the price into the same lines: carcass, doors, hardware, interior fittings, finishing, packaging and freight. A single lump-sum number hides where a low quote is cheap — usually thinner board, fewer drawers, or basic hinges.

RFQ checklist before you hit send

  • Measured dimensions per run, including out-of-plumb readings.
  • Door type and panel profile reference or sample.
  • Substrate, surface material and sheen named separately.
  • Interior layout with hanging, shelf and drawer counts.
  • Hardware specification and supply responsibility.
  • Unit quantities and whether the design repeats.
  • Site address, Incoterms and required on-site date.
  • Drawings, finish schedule and coordinating party named.

SANTERSON has manufactured furniture and building materials since 2008, with custom and OEM production for villa, hospitality and office projects. Send the details above to our team and we will return a line-by-line quotation, shop drawings for approval, then production and door-to-door delivery under one contract.

Final dimensions, board choices, hardware loads and finish approvals are confirmed with the factory on your specific project before production. Prices depend on the specification you supply.