A rendering of a handleless kitchen looks calm and resolved, but a rendering is not a specification. When cabinetry is manufactured to order and shipped internationally, the difference between a smooth handover and an expensive rework sits in the paperwork: dimensions, materials, hardware, appliance interfaces and tolerance notes recorded before production starts. This guide walks through the fields we ask buyers, designers and contractors to complete for custom minimalist kitchen cabinets, and what each line is really protecting.

Start with the room, not the door style

Minimalist cabinetry depends on continuous flat surfaces, so small errors in the shell show up immediately. Before choosing a colour, capture the space:

  • Clear wall lengths at floor level and at the working plane, plus ceiling height at several points — slab heights in older apartments often vary across one wall.
  • Position of existing soil stacks, water inlets, waste outlets, switchboards and light points, measured from a fixed corner.
  • Window and door reveal depths, opening direction, and any radiator or skirting that a run of cabinetry will cross.
  • Floor finish build-up. State the finished floor level, because base units are set to it, not to the slab.

Send drawings if you have them. If you do not, a measured sketch with photographs of each wall is enough for us to work from. Our interior design team can support space layout planning and 3D visual renderings, then coordinate those drawings into production — see interior design services.

Specify the carcass, doors and finish as separate lines

"Matte grey, handleless" is not a manufacturable description. Split it into four decisions so nothing is assumed on our side or yours:

ElementWhat to record
Door panelBoard type, thickness, edge treatment (e.g. 2 mm continuous edge), surface system — matte laminate, matte lacquer, acrylic or wood veneer — and the colour reference. Quote a sample code rather than a colour name.
CarcassPanel thickness for cabinets and shelves, interior colour, adjustable shelf positions, and whether tall units are built to ceiling or with a soffit above.
Opening methodTouch-to-open (push mechanism), J-pull / rail profile, or integrated handle channel. State which doors and which drawers use which method — the two are not interchangeable.
HardwareHinge brand and soft-close requirement, drawer system and load rating, runner type (side or undermount), plus supporting items such as legs, brackets and handles where they apply.

For a seamless front with no protruding hardware, our handleless minimalist kitchen cabinets line is built around continuous flat panels with touch-to-open fronts and soft-close fittings as standard specification items. Where a project needs the same language across more than the kitchen, matching wood and taupe handleless cabinets pair a wood-grain panel with a matte neutral flat door — record both colour codes if you mix them.

Fix the appliance and wet-zone interfaces early

The most common specification gaps are not cosmetic; they are the points where cabinetry meets something else:

  • Built-in appliances. Provide model numbers or cut-out dimensions for oven, cooktop, dishwasher, fridge and microwave, plus required ventilation voids and door-hinge side. A 595 mm appliance in a 600 mm nominal housing still needs the clearance stated.
  • Sink and benchtop. Give the sink cut-out type (undermount, drop-in, flush), tap hole count and position, and the benchtop material and thickness so the cabinet rail and support detail can be designed to suit.
  • Wet-zone protection. Note splashback material and height, and where panels sit behind the sink and hob. This drives board choice and edge detailing in those bays.
  • Integrated lighting. State which shelves and plinths are to be lit, the driver location for access, and whether switching is local or to a wall plate.

For hotel apartments and serviced units we supply these as part of custom built-in kitchen cabinets, with matching hinges, drawer slides, support legs and connecting brackets listed on the same schedule so nothing arrives separately.

Record quantities, tolerances and the split of supply

A usable specification closes with the commercial and site questions:

  • Unit-by-unit schedule: item code, width × height × depth, door/drawer configuration, finish code. Number every run on the drawing so crates can be reconciled on site.
  • Sill and scribe allowances: state which ends are scribed to wall and which are finished square, plus any filler widths you want fixed rather than left to the installer.
  • Scope boundary: confirm whether benchtops, sinks, taps, appliances and tiling are included or supplied locally. We can quote cabinetry alone or as part of a wider fit-out.
  • Delivery and access: delivery address, container type, lift or stair constraints, and the floor the goods must reach.
Before you send it: check that every finish code appears on an approved physical sample, that appliance cut-outs match current model data sheets rather than brochure images, and that one person signs off the final schedule. Those three checks prevent most specification disputes.

How our custom and OEM service fits a project brief

Once the schedule is fixed, production follows the same sequence for a single apartment kitchen or a multi-unit order: design proposal and detail confirmation against your drawings, quotation, then manufacturing with quality control, packing and container loading, shipment tracking and door-to-door delivery, followed by installation support and after-sales service. Custom work covers dimensions, internal layout, panel materials, surface finishes and hardware selection; OEM cooperation additionally supports private labelling and packaging for developers and trade buyers. Minimum order quantities are set per project — tell us the unit count and the phasing, and we will confirm what is feasible.

Send your drawings, a room measurement sheet or even a photograph of the existing kitchen, and we will turn it into a specification you can approve line by line. Enquiries are handled through our contact page.