A swim spa enquiry that arrives with only a model number usually comes back with only a price. The Outdoor Swim Spa WS-PC06ST is one of the more configurable units in our range, and the difference between a smooth build and an expensive change order almost always comes down to what the buyer put in writing before production started. This guide sets out exactly what to send us so the quotation you receive matches the spa that reaches your site.

Start with how the spa will actually be used

The WS-PC06ST combines a swim training system with a hydrotherapy seating area, which means two very different duty cycles in one shell. Tell us who uses it and how often: daily lap training for a household, occasional exercise plus relaxation, or shared use across guest villas. That answer drives the pump selection, the number and position of water jets, and whether the swim current should be specified for continuous run time rather than short sessions.

Also state the water temperature you expect to hold and the season of use. A spa used year-round in a cool climate needs a different insulation and heat pump specification from one used mainly through summer on a shaded terrace. If you do not know yet, say so and give us the climate zone — we will propose the option set rather than guess.

Send the site information before we size anything

Catalogue dimensions for this model are 5900 × 2400 × 1470 mm, and the longer variant Outdoor Swim Spa WS-PC06ST-L runs to 6390 × 2400 × 1470 mm. Those figures are the shell, not the installation. Please include in your enquiry:

  • A plan sketch or drawing showing the clear opening for the spa, plus access route from the delivery vehicle to the final position.
  • The support structure: plinth, deck frame, or in-ground recess with an equipment access hatch. State the finished level relative to the surrounding deck.
  • Drainage and overflow arrangement at site, and where the fill water comes from — mains, tank, or treated recycled supply.
  • Electrical supply details: available supply capacity, phase, and the distance from the isolator to the control panel location. Total connected load for this model is listed as 6.55 kW in the catalogue, but the final figure depends on which options you select.
  • Photographs of the prepared or intended position, including any boundary fence, overhang, or stair that constrains handling.

If the spa sits alongside other outdoor elements — poolside furniture, a hardtop gazebo, or a pergola — send those selections at the same time so finishes and levels are coordinated rather than reconciled on site.

List the equipment you want included, item by item

The base specification for WS-PC06ST covers a control system, one swim training system, one filter pump, six water jets and four LED lights, with ozone as a shown feature. Options catalogued across this range include UV sterilisation, water pumps, heat pumps, sand filtration, additional insulation and steps. Availability and compatibility vary by model, so confirm the assembled configuration rather than assuming an option carries over from another size.

Item to state in your briefWhy it changes the build
Jet count and seating layoutDetermines pump duty, jet placement and where the hydrotherapy benches sit relative to the swim channel.
Heating method (heat pump or other)Sets electrical load, insulation specification and running-cost expectations you should plan around.
Water treatment (ozone, UV, sand filtration)Affects the equipment compartment layout and the maintenance routine handed to whoever looks after the spa.
Cover and stepsChanges clearances around the shell and the finished deck level you need to allow for.
Control and lighting preferencesFixes panel location, cable runs and the commissioning checklist at handover.

Agree the specification in writing before production

For a custom or OEM order we work from a confirmed brief: product specification and drawings, material and finish selection, then manufacturing with quality control against that approved set. Send us your preferred shell colour and cabinet finish, and any branding requirement if the unit is part of a hospitality or villa development sold under your own name. Where our catalogue wording and your project documentation use different terms for the same component, flag it early — mismatched naming in a specification sheet is one of the most common causes of substitution disputes.

Please treat catalogue figures as the starting point for confirmation, not as final installed values. Dimensions, connected load and included equipment are confirmed against the exact configuration you order, and any local electrical or building requirements remain your responsibility to verify with the relevant authority in your region.

Cover delivery and installation in the same brief

Tell us the delivery address, whether the site accepts a container of that size, and what Incoterms you want quoted. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading, with tracking through to the delivered position — but a spa is only useful once it is set, connected and commissioned. Our installation and after-sales support page lists on-site installation, inspection and snagging, spare parts and ongoing maintenance; send the site contact details and access hours with your enquiry so the install visit can be planned alongside production rather than bolted on afterwards.

Buyers coordinating a swim spa together with other fit-out items usually save themselves the most time by grouping them under one programme. Turnkey project solutions covers that route: design coordination, production scheduling and site coordination for villas, hospitality and office projects.

A short checklist to paste into your enquiry

  • Model reference and variant (WS-PC06ST or WS-PC06ST-L), plus the reason for the size choice.
  • User profile, frequency of use, target water temperature, season of use.
  • Site drawing with clear opening, access route, support structure and finished levels.
  • Drainage, water supply and electrical supply details including isolator distance.
  • Option list: heating, treatment, cover, steps, lighting, control preferences.
  • Shell colour, cabinet finish, any branding or private-labelling requirement.
  • Delivery address, preferred Incoterms, site contact and access hours.
  • Target programme date for delivery and commissioning.
Send that information with your enquiry for the Outdoor Swim Spa WS-PC06ST, or tell us the site constraints first and we will recommend between this model, the longer variant, or another unit in our swim spa range. We reply with a configuration sheet and quotation based on what you have actually specified.