A parquet floor is one of the few finishes that changes how a whole villa or hotel room reads, so buyers rarely accept a price until they know exactly what is being quoted. If you are specifying engineered wood flooring for a project and need a firm number rather than a rough range, here is the information we ask for on a quotation request - and what you should get back in return.
Start with the pattern and the plank format
Parquet is not one product. Our current European oak parquet range covers several distinct layouts, each with different cutting waste, laying labour and subfloor preparation. Tell us which direction you are working in:
- European Oak Engineered Parquet Flooring - light oak tone, natural grain, a wear-resistant surface aimed at residential living spaces and interior projects.
- European Oak Parquet Engineered Hardwood Flooring - richer warm grain with a classic parquet pattern for renovation work.
- European Oak Parquet Engineered Wood Flooring - deep brown grain for living rooms, bedrooms and premium residential interiors.
- Light tone European oak parquet - subtle grain and a bright, clean surface for warm minimalist rooms.
If you are weighing parquet against a straight plank or a chevron layout, European Oak Herringbone Engineered Wood Flooring sits in the same build-up family and is often quoted alongside it.
What we need from you to price the job
Send these details and we can quote without a second round of questions:
| Item | Why it changes the price |
|---|---|
| Project type and location | A private villa, a hotel fit-out and a multi-unit residential development are packed, staged and shipped differently. |
| Measured area per room, in square metres | Parquet is ordered by area plus wastage. Give us room-by-room dimensions rather than one total, so we can allow for cuts at each perimeter. |
| Pattern and plank size | Small blocks and narrow formats mean more pieces per square metre and more laying time on site. |
| Surface tone and finish | Light bleached, natural and deep brown boards take different staining and top-coat steps. |
| Subfloor condition and heating | Tell us the substrate type, its moisture reading if you have one, and whether underfloor heating is present. The parquet constructions listed above are described as compatible with underfloor heating; we still need your build-up to confirm the adhesive and acclimatisation method. |
| Order quantity and phasing | Minimum order quantities vary by product, so state the total area and whether the site needs it in staged deliveries. |
| Destination port or site address, and your preferred Incoterms | Freight, packaging and container loading are quoted per shipment. Send the delivery destination and the terms you work to; we confirm the freight option and paperwork for your country in writing. |
| Target programme | The date the floor must land on site determines production sequencing and whether a sample run is worth doing first. |
Custom specification, if the standard range is not right
Where a design calls for something outside the catalogue, we handle it as custom work: bespoke finishes and textures, 3D modelling and prototyping before production, material selection across wood, metals and engineered surfaces, and OEM manufacture with flexible minimum order quantities. For flooring specifically, send us a reference board, a colour target or a drawing of the layout you want, and we will tell you which parts of it can be produced and which would change the build-up.
What our quotation covers
A SANTERSON quotation is itemised so your quantity surveyor can check it line by line:
- Product specification per line - construction, top-layer thickness, surface finish, pattern and board format.
- Quantity in square metres, with the wastage allowance stated separately so you can see how it was calculated.
- Packing specification and container loading plan, including protective packaging for export.
- Freight option and delivery scope to your named port or site address.
- Production sequence and shipment plan against the programme you give us.
Sample stage before you commit
For project volumes we recommend approving physical samples first. A parquet board photographed on a screen tells you almost nothing about grain density or how a stain sits under site lighting. Request sample boards of the two or three candidates, lay them against your wall finish and joinery, and check them under the actual lighting design before you sign off the specification.
How the enquiry moves to production
The workflow follows our standard project stages: consultation, design and planning, production, logistics, installation, and after-sales. In practice that means your brief and drawings come back as a confirmed specification and quotation, production starts once details are signed off, then we handle packing, freight documentation and delivery, with site coordination and handover to follow. As a one-stop furniture and building materials supplier, we can also quote the flooring alongside the joinery, wall panelling, doors and lighting it has to sit against - which is usually where specification conflicts get caught.