A standard mirror cabinet looks simple on a schedule: a mirrored front, a cabinet behind it, hung above a basin. The problems appear later — a cabinet that projects too far past the basin, a door that fouls the wall because there was no clearance to swing, shelving that cannot hold the bottles the housekeeping team actually stocks, or a mirror that sits at the wrong height for the vanity below it. Before an order is placed, buyers should settle six customisation points with the supplier. Our Standard Mirror Cabinet is made to measure for each project, so those conversations are part of the normal quotation process rather than an exception.

1. Dimensions that follow the basin and the wall

Width, height and depth each answer to something else on site. Width should relate to the basin or vanity it sits above — a mirror cabinet narrower than the basin leaves the mirror unusable at the edges, while one much wider crowds an already tight bathroom. Depth decides whether the unit reads as a flat plane or as furniture that intrudes into the room, and it matters most where a walkway passes in front of the vanity. Height is set by ceiling height and by who uses the room: guest bathrooms, family bathrooms and hotel rooms are specified differently.

For each project we confirm made-to-measure sizing against drawings or site measurements before production starts. If you are comparing a standard unit with a bespoke one, ask the supplier which of the three dimensions can actually change on their product, and what the fixed elements are — carcass depth, mirror thickness or door construction.

2. Door type and the clearance it needs

Mirror cabinet doors come in two broad families: hinged and sliding. Hinged doors give full access to everything stored inside, but they need clear space in front of and beside the cabinet; in a narrow bathroom a hinged door can hit a towel rail, a WC pan or the wall. Sliding doors save that swing space and sit closer to the wall, at the cost of only being able to open part of the front at once.

This is worth deciding before the wall finishes are ordered, not after installation. Ask for the door layout as a drawing showing the opening direction and the clearance required, then check that clearance against your reflected ceiling plan and sanitary ware positions.

3. Interior layout built around what is stored

Adjustable shelves are more useful than fixed ones because bottle heights change between brands and between phases of a project. Where a project stores tall items — aerosols, bulk amenity bottles, hairdryers — a full-height compartment on one side plus shorter shelves on the other usually works better than evenly spaced shelving throughout. Buyers who supply an item list to the supplier generally get a better internal layout than those who accept whatever the catalogue shows.

Two details decide whether the interior survives daily use: shelf load rating for glass and ceramic items, and how the shelves are supported. State what will be stored, in what quantity, and let the supplier propose the shelf spacing and fixings accordingly.

4. Mirror, frame and finish options

The finish has to sit with the rest of the bathroom: cabinet joinery, tapware, door ironmongery and any wall panelling. Frameless mirrored fronts read as a clean surface and help small bathrooms feel larger; framed fronts in metal or in a matched wood tone tie the unit to other joinery in the same room. Where a whole apartment or villa is being fitted out, matching the mirror cabinet finish to Single Vanity and other bathroom joinery keeps the specification consistent across rooms.

Ask which finishes are standard stock and which are made-to-order, because a non-standard finish usually changes both lead time and price. Also ask how the mirror edge is finished and sealed — an unprotected edge in a humid room is where deterioration starts.

5. Lighting: integrated or separate

A standard cabinet is lit from outside it; a lit version carries the light source in the unit itself. If you want lighting integrated into the cabinet, that decision belongs at specification stage, because it changes the electrical work: cable positions, the switch location, and where the driver sits so it remains accessible for service.

Where the design calls for integrated lighting, the Santerson LED Mirror Cabinet in the same collection is the version to discuss. Where the design already has wall lights either side of the mirror position, separate Vanity Lighting paired with a standard cabinet is often the simpler and cheaper route. Confirm lighting and electrical specifications for each project before any first-fix electrical work is set out on site.

6. Mounting, services and site conditions

Mirror cabinets are heavy for their size, and the wall they hang on decides how they must be fixed. Stud, brick, block and plasterboard each need different fixings, and tiled walls add a further constraint: holes should be set out before tiling so fixings land on solid support rather than in a grout line. Buyers should send the supplier the wall build-up and the position of any pipes or electrical boxes behind the mirror zone.

Also confirm which parts arrive assembled and which are assembled on site, what packaging the mirrored fronts travel in, and how replacements for a damaged mirror front are ordered later in the project.

When to look beyond the standard cabinet

The standard format suits most bathroom layouts. Two situations call for a different unit. Where storage needs run floor to ceiling — linen, towels and spare stock kept in the bathroom — a Santerson Tall Mirror Cabinet gives considerably more volume without taking floor space. Where the design wants a softer shape, or the cabinet is being placed above a basin that is not rectangular, the Santerson Round Mirror Cabinet covers that case.

A short checklist for the enquiry

  • Basin and vanity dimensions, plus the wall width available above them
  • Required cabinet depth, checked against the walkway in front of the vanity
  • Door type — hinged or sliding — with the clearance each one needs
  • The items to be stored, so shelf spacing and load rating can be set properly
  • Finish reference, and whether it is a standard or made-to-order option
  • Lighting decision: integrated into the cabinet or separate vanity lighting
  • Wall build-up, tile setting-out and the position of concealed services
  • Quantities per bathroom type, so identical layouts can be repeated consistently across the project

SANTERSON has manufactured furniture and building materials since 2008 and supplies bathroom fixtures alongside cabinetry, lighting and interior finishes for villa, hotel and office projects. Send us the drawings or site measurements, the wall build-up and the item list, and we will confirm dimensions, door layout, finish and electrical details for each bathroom type before production. The same information also lets us quote matching vanities, storage and lighting as one package instead of separate line items from different suppliers.