A drawer unit is one of the smallest items on a project schedule and one of the easiest to get wrong. The carcass arrives, the opening is 30 mm out of square, the finish does not match the vanity beside it, and the drawer stack that was meant to hold linens now holds excuses. None of that is hard to prevent. What prevents it is a brief written before production starts, not after the first sample photo lands in your inbox.
SANTERSON is a China-based manufacturer of custom furniture and building materials, and we build custom drawer units to project-specific dimensions, with a choice of material and finish for each order. That flexibility is the point of made-to-measure joinery, and it is also why the quality of your written specification decides the outcome. Below is the information set we ask buyers, contractors and designers to prepare about their project before we quote or cut a single panel.
1. The opening, measured at three heights
Send the width, height and depth of the recess, and take each dimension at the top, middle and bottom. Older villas and hotels rarely have square, plumb walls, and a single tape measurement hides that problem until installation.
- Finished floor level to underside of the counter or shelf above, measured in place.
- Clear depth available, including skirting boards, door reveals, pipework and any insulation build-up.
- Whether the unit is freestanding between walls, recessed into a niche, or fixed to a wall as part of a full height storage wall.
- Floor and wall finishes already installed, or still to come. A unit made to a bare-shell measurement will not fit the tiled room.
2. What actually goes inside each drawer
"Lots of storage" is not a specification. Tell us who uses the room and what they put away, because drawer heights follow from that answer and nothing else.
| Contents | What we need to know |
|---|---|
| Towels and linens | Stack height per shelf group, and whether you want deep pull-out boxes or shallower trays. |
| Toiletries and small items | Whether dividers or tray inserts are required, and how many compartments. |
| Cleaning products and appliances | Appliance dimensions and ventilation needs; see our compact laundry solutions when the unit sits in a laundry zone. |
| Documents, glassware or valuables | Whether any drawer needs a lock, and which one. |
Also state how many drawers you expect and in what order. A stack of four equal drawers behaves very differently from one deep box over two shallow ones, and the hardware plan follows the same logic.
3. Materials, finish and the samples to ask for
Our configuration options cover board material, surface finish and colour, so send the reference rather than a description. A written word such as "oak" means several different things across suppliers.
- Send the finish code, sample photograph or physical sample you want matched, especially where the drawer unit must sit beside wardrobes, vanities or built-in kitchen cabinets already specified.
- Say which surfaces are visible. A unit boxed into a joinery run needs a finished front only; a freestanding unit needs all four faces dressed.
- Name the room environment. Bathroom surroundings carry moisture and temperature swings, so tell us the ventilation situation and how the room is used before we confirm board choices.
- Ask for a finish sample to approve on site, viewed in the actual room light. A colour that reads warm under showroom lighting can read grey against a villa's north-facing wall.
4. Hardware and operation
Hardware is where budget pressure usually lands, and it is the part owners feel every day. Specify it in writing:
- Soft-close or standard runners, and full-extension or partial-extension travel.
- Expected load per drawer, so runners are rated for real contents rather than a catalogue figure.
- Handle style or a handleless front with a push-to-open mechanism, matched to the door fronts used elsewhere in the project.
- Whether replacement runners and hinges should be shipped as spare parts with the order, which matters on multi-unit schemes where maintenance happens years later.
5. Interface details people forget to write down
Most site problems are interface problems. Add these to the brief and record them on the drawing:
- Adjacent work: skirting, architrave, tile set-out, countertop overhang, and the direction doors and drawers swing when open.
- Services: concealed pipework, sockets, switches and any lighting inside or above the unit. If you want integrated cabinet lighting, say so early — cable routes and transformer access change the carcass.
- Fixing method and substrate, particularly for wall-mounted units on stud or hollow block walls.
- Tolerances you will accept around the reveal, and who sets out the opening on site.
6. Quantities, phasing and delivery
Made-to-measure units are produced to a count, so give us the room-by-room schedule rather than a single total: unit type, configuration code or description, finish reference, quantity and the room or apartment number it belongs to. On apartment and hotel work, tell us which rooms must arrive in which batch, and how the goods reach each floor — lift dimensions, stair access, and storage on site.
SANTERSON handles freight by sea, air and rail with door-to-door delivery, so include your delivery address, receiving hours and preferred Incoterms in the same brief. We confirm shipping terms, transit arrangements and import documentation for each destination individually rather than applying a blanket promise.
7. The approval step before production
Our cooperation follows a simple sequence: project brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. Before panels are cut you should receive shop drawings showing dimensions, drawer stack, front elevations and finish references. Review them against the site condition, not the concept render.
Sign off only when these are settled:
- Every dimension is a finished-condition dimension, confirmed by whoever surveyed the opening.
- Finish references appear on the drawing and match an approved sample.
- Hardware schedule, load ratings and spare-parts list are named.
- Delivery address, batch split and installation responsibility are written down, with installation and after-sales support scoped for the units that need it.
A short brief template you can copy
- Project name, room or unit reference, contact on site.
- Opening dimensions at three heights, plus clear depth and floor finish status.
- Drawer stack: number of drawers, target contents, divider needs.
- Board material, finish reference or sample code, visible faces.
- Hardware: runner type, extension, load, handle style, locks.
- Interfaces: services, lighting, fixing substrate, adjacent finishes.
- Quantities by room, batch schedule, delivery address and Incoterms.
- Who signs the shop drawings, and by when.
Send that much information to the manufacturer and a made-to-measure drawer unit stops being a gamble. The specification carries the risk instead of the site team, and the finished joinery lines up with everything around it. If you are specifying drawer units for a villa, apartment or hotel package, our team can review your schedule and advise on configuration before we quote — start at the custom furniture page or send drawings through the contact page.