A mixed open and closed modular wall only looks finished when the material behind the doors matches the material on show. Before you sign off a Santerson Mixed Open & Closed Systems package for a villa or apartment project, it is worth separating two decisions that suppliers often bundle together: the substrate and construction you order, and the surface finish you actually see from across the room.
Start with what the product page does and does not commit to
The Mixed Open & Closed Systems listing sits in the Modular Living Systems collection and is written for residential living projects. Its configuration notes are deliberately open: made-to-measure sizing, material and finish options, and a layout tailored to each space. That flexibility is the point of a modular system, but it also means two quotations for a run of similar width can describe very different build-ups.
Treat the listing as an envelope, not a specification. Before comparing prices line by line, ask for the panel make-up behind each door front and open bay, the carrier or fixing method for wall-hung sections, and which edges are solid, which are wrapped, and which are ABS or aluminium trimmed. Those three answers explain most of the price gap between otherwise similar schemes.
Compare finishes by how the piece will be used
Open bays carry display items, books and glassware; closed doors take fingerprints, sleeves and daily handling. A finish that reads beautifully on an open shelf can be unforgiving on a door that is pushed hundreds of times a week. When you request samples, judge each one against its position in the elevation rather than against a mood board.
| Finish family | Where it performs well | What to check before ordering |
|---|---|---|
| Matte Finish Melamine | Closed doors and carcass panels in family living rooms and apartments; low-glare surfaces under downlights | Edge banding colour match, panel thickness, and whether the same decor is available for both door fronts and open-bay interiors |
| Wood Veneer Panels | Feature bays, desk alcoves and the visible framework of an open-and-closed composition that must tie into veneered doors or wall panelling | Grain direction and leaf matching across a run, sealer sheen level, and how the veneer meets adjacent painted or lacquered reveals |
| Matte Lacquer Panels | Seamless, handle-free compositions where doors, panels and reveals should read as one flat plane | Touch-up policy for site damage, panel-to-panel sheen consistency, and the reveal detail at internal corners |
| Walnut Veneer Wardrobes | Warm-toned schemes where the modular unit repeats the timber tone already used in bedroom joinery | Stain and sheen batch consistency between wardrobe and living-room runs ordered at different times |
| Matte Acrylic Wardrobes | Clean, deep-colour door fronts in modern interiors where a soft-touch surface is acceptable | Front construction and substrate, grain direction on tall doors, and hardware choice since acrylic edges show through some handle fixings |
| Textured Panels | Open display backings and niche interiors that need shadow and depth rather than a flat field | Dust and cleaning access on relief surfaces, and how lighting angle exaggerates the texture at close range |
Finish families above are drawn from collections published on this site; each is specified per project. Request the physical sample, not a printed or on-screen swatch, before any finish decision is signed off.
Keep the material story coherent across the whole elevation
The most common regret on built-in joinery is not a poor-quality board but a mismatch: an open bay in one tone, doors in a close-but-not-identical tone, and a reveal painted to match neither. Santerson's own ranges make this easy to avoid when you plan them together. Floating Modular Systems can carry the lighter wall-hung tier while a floor-standing run handles heavier storage, and both should be quoted in one material schedule so the carcass, doors and open bays leave the factory from the same batch.
Where the modular unit continues into other joinery, bring the neighbouring items into the same conversation early. A living-room composition that flows toward Walnut Veneer Wardrobes in the hallway, or meets Santerson Wood Veneer Hinged Doors, needs one timber reference and one sheen reference shared across all three. Ask for those references to be written into the order as named finishes with sample codes, so a later replacement door is matched to the record rather than to a faded panel on site.
Decide open-to-closed proportions before you pick colour
Proportion drives perceived quality more than price per square metre. A composition that is mostly open shelving asks for tidy styling and regular dusting; a composition that is mostly closed can look heavy in a small living room unless the upper tier is wall-hung or broken by display niches. Practical starting points:
- Display-first rooms — roughly half open bays, with closed storage grouped below the sightline so clutter stays out of frame.
- Family living rooms — more closed than open, with one or two lit niches to keep the run from reading as a wall of doors.
- Media-led walls — equipment and consoles behind ventilated or handleless fronts; keep frequently used items in open or shallow open-front compartments.
- Show apartments and display villas — open-forward compositions with veneer backings, accepting that styling and upkeep are part of the specification.
If lighting is part of the design, specify it with the joinery rather than after installation. Santerson Integrated Cabinet Lighting needs cable routes, transformer positions and switching decided while carcass depths are still open for change; confirm electrical ratings and compatibility for the cabinet design you have chosen.
What to send with your enquiry
A comparison only works when every quotation answers the same questions. Send the following with your request and the numbers become directly comparable:
- The elevation or room layout, with overall width, height and depth, plus the position of skirting, cornices, switches and radiators.
- Your open-to-closed split, and which compartments are for display, media, glassware or linen.
- Two or three shortlisted finishes with sample codes, and where each finish is intended to appear in the elevation.
- Confirmation of wall-hung versus floor-standing sections, and the substrate behind the wall for fixings.
- Whether lighting, glass shelves, drawer internals and doors are included, or priced as extras.
Santerson manufactures to project dimensions and works through design coordination, production, door-to-door delivery and installation support, so the same schedule that lets you compare finishes also lets you compare scope. If a quotation is lighter than its competitors, check what has been left out of it before assuming the material is the difference.
Planning a modular wall for a villa or apartment project? Send your elevation and shortlisted finishes to the SANTERSON team and we will return a specification with materials, doors, hardware and lighting itemised, so you can compare like for like.
Phone / WhatsApp: +86-13928214007 (PHILLIP) | Email: santerson@qq.com | Contact us