A stacked laundry unit looks like a small item on a specification schedule until it lands on site. Then the cabinet either fits the recess, lines up with the appliance and survives daily use, or it turns into a variation order. If you are sourcing these units for apartment bathrooms, villa laundry corners or a serviced-apartment fit-out, the shortlist below is what we have found separates a straightforward buy from an expensive one.

In short: shortlist manufacturers by their built-in furniture capability, not by a catalogue photograph. Confirm made-to-measure sizing, ask what the moisture-resistant board actually is rather than accepting the phrase "waterproof", check how ventilation and appliance access are handled in the drawing, and insist on written sign-off of dimensions before production starts.

What a stacked laundry unit has to do on site

A stacked arrangement puts a washer and a dryer one above the other inside a cabinet carcass, usually in a bathroom, ensuite, utility alcove or a cupboard off a corridor. Three things have to work at once: the appliance footprint, the services (water inlet, drain, power point, and for a vented dryer an exhaust path), and the door or panel line of the surrounding joinery. When any one of them is decided late, the cabinet gets rebuilt.

This is why we treat these units as part of interior fixtures rather than as loose furniture. They are made to the space, and once they are fixed in place they become part of the room.

Screening criterion 1: does the manufacturer build to your dimensions?

Ask one direct question: can you produce this unit to my site dimensions, or am I buying a fixed module? A factory that only ships standard widths will push you to change the wall, not the cabinet. On our side, units in the Laundry Integration range such as Stacked Laundry Units are made to measure, with the layout, material and finish specified per project, and dimensions confirmed with the buyer before production.

Useful detail to request at this stage:

  • Finished external width, height and depth, plus the clearance left around the appliance.
  • Whether the carcass is built on-site or delivered as assembled modules, since that changes both the opening size and the installation sequence.
  • How skirting, cornices and uneven floors are dealt with in the setting-out drawing.

Screening criterion 2: ask what "moisture resistant" means

Every supplier says their board is waterproof. That word means nothing on its own. Ask for the board type, the edge treatment and the finish system, and check they are consistent across the carcass, shelves and doors rather than only on the visible face.

In a bathroom or shared laundry, the practical points to raise with any manufacturer are:

  • Edges. Unsealed edges are where swelling starts, especially near the floor and around the drain access.
  • Finish choice. Our pages offer material and finish options per project; ask which finishes are recommended for a wet area and which are for dry utility spaces only.
  • Plinth or raised base. Confirm whether the unit sits on a raised base and how that base is sealed to the floor finish.

We do not publish test certificates for every board in our catalogue, so if your project requires documented moisture performance, request it in writing for the specific product before you place the order.

Screening criterion 3: ventilation and appliance access

A stacked cabinet that closes the appliance in on all sides traps heat and restricts the air a dryer needs. Ask the manufacturer how they show airflow in the workshop drawing, and where the access panel sits for hoses, the drain and the power point. If a supplier cannot produce a drawing that answers these questions, they are guessing.

Related items in the same collection are worth specifying at the same time so one trade builds the whole wall: WasherDryer Cabinets for side-by-side layouts, and Pull Out Laundry Hampers where the hampers sit in the run next to the machine.

Screening criterion 4: storage around the machine, not just under it

The unit that gets used well usually has somewhere to put detergent, a folding or hanging zone, and linen storage within arm's reach. Where the plan allows, we pair the laundry run with Multi Function Tall Cabinets or Linen Cabinets, so the appliances and the storage are drawn, made and installed as one package.

Screening criterion 5: who coordinates it with the rest of the fit-out?

On multi-unit projects the laundry cabinet has to match the vanity, the tall cabinets and the doors in the same bathroom. Buying each item from a different supplier is where finishes start to drift. A single one-stop furniture and building materials supplier keeps one drawing set, one finish schedule and one delivery window across the whole floor.

Ask specifically whether the manufacturer will coordinate with your drawings and site team, and what happens at handover. Our own service covers design consultation and space planning, production coordination, door-to-door logistics and installation support; you should expect an equivalent answer from any supplier on your shortlist.

Screening criterion 6: how they handle a discrepancy

Things get measured wrong. What matters is the paper trail before production, not after. Before you commit, confirm in writing:

  • The signed setting-out drawing with finished dimensions and appliance model.
  • The approved material and finish sample reference for the exact batch.
  • Who measures on site, and at what stage the measurement is taken.
  • What the supplier does if a unit arrives off-size: remake, on-site adjustment, or nothing.

A shortlist scorecard you can send to three suppliers

Question to askWhat a good answer looks like
Can you make it to my dimensions?Yes, made to measure, with a drawing returned for your signature.
What board and edge treatment in a wet area?Named board type and sealed edges throughout, not the word "waterproof".
How is dryer ventilation shown?Airflow and access panel drawn on the workshop detail.
Can you supply the matching tall cabinet and linen storage?Yes, same collection, same finish schedule.
Delivery and installationNamed logistics scope, delivery window and an installation or site-guidance option.
Off-size unit on arrivalA written remedy agreed before production starts.

Two mistakes that cost the most

First, specifying the cabinet before the appliance is chosen. The machine's door swing, hose depth and vent route decide the internal allowance, so lock the appliance model first. Second, treating each bathroom as identical on a multi-unit job. Recess widths, drain positions and skirtings vary between units; measure the actual openings rather than assuming the typical detail applies everywhere.

Where we fit in

SANTERSON is a China-based manufacturer of furniture and building materials, working on villa, hospitality and office projects since 2008. Our laundry integration products are specified per project for size, layout and finish, and they sit alongside the rest of the bathroom and interior package, so you can source the cabinets, sanitary fixtures, doors, wall finishes and lighting from one supplier rather than reconciling several.

Send us your laundry layoutShare the appliance model, a marked-up plan or a photograph of the recess, and we will come back with a made-to-measure layout for the stacked unit and the storage around it. Contact details are on our contact page.