A full height storage wall looks simple on a drawing: one run of joinery from floor to ceiling, doors that line up, and everything out of sight. It is only in the shop drawings that the cost appears — or disappears. Half the rework we hear about from villa and apartment projects comes from decisions taken before anyone asked the right questions.
This checklist follows the way Santerson Full Height Storage Walls are actually specified and built: made to measure for the space, with the layout, material and finish confirmed against your drawings before anything goes into production. Work through it in order and most of the usual surprises are dealt with on paper, not on site.
1. The measured opening, not the nominal one
Start with a survey of the actual opening: wall length, finished floor level, ceiling height at both ends, and where the out-of-plumb falls. In older Australian villas and renovated apartments floors are rarely level across a five-metre run, and a storage wall built to a nominal dimension will either need packing on site or leave a visible shadow gap.
- Record finished levels — floor finish build-up and ceiling set-down, so the unit height is quoted to the true finished dimension.
- Note obstructions — skirting, downlights, air grilles, switch plates, door architraves and cornices that the carcass has to scribe around.
- Mark services early — power points for internal lighting, data cables and any plumbing behind the wall. Rework after the panel goes up is expensive.
- Confirm access routes — lift dimensions, stair turns, door widths and the delivery window at the site. Tall panels are shipped as built; they cannot be trimmed down on the day.
2. Internal layout mapped to what you actually store
Before choosing a single door, list what has to live inside. Linen, off-season luggage, glassware, books, vacuum cleaners, stock for a guest house — each has its own height and depth requirement. A shelf grid designed from the outside in is what produces wasted metres.
- Zone by frequency — daily items between hip and eye height; heavy or seasonal items low; display and light objects up high.
- Set shelf heights per zone, not one uniform grid. Adjustable shelving gives you tolerance, fixed shelving gives you clean lines.
- Decide open against closed. Where a mix suits the room, Santerson Mixed Open & Closed Storage is the layout to brief — display niches for what you want seen, doors for the rest.
- Check deep runs. Beyond about 500 mm of depth, pull-out trays and hinged mechanisms are worth specifying rather than a fixed shelf you have to crawl into.
3. Doors: mechanism first, appearance second
The door is where clearance, budget and looks collide, so settle the mechanism before the finish.
- Hinged — needs swing clearance in front of the wall; check it against the bed, the island or the traffic path.
- Sliding — saves the swing but needs track detail and a face that stays flat. For bedroom runs where the doors hide hanging space, Santerson Closet Sliding Panels cover that configuration.
- Handleless — clean front, but confirm the profile and how the door is opened at the ends of a run.
- Glass or mirrored — good in a compact room; agree the glass type, backing and whether hardware shows.
Also confirm the number of doors per opening and where the vertical joints land. A door line that falls off centre against a bed or a fireplace reads as an error even when everything else is right.
4. Materials, finishes and edges
Specify the board, the surface and — the detail most checklists skip — the edge. Full height doors are the tallest panels in the house; a thin substrate will bow over that span regardless of how good the finish looks on a sample card.
- Substrate for the carcass and the doors, stated separately. Tall doors may need a stabilised or thicker specification than the case sides.
- Surface — melamine, lacquer, veneer or laminate, matched to wear in that room. A hallway wall sees bags and coat sleeves; a bedroom wall does not.
- Edge treatment — edge banding colour and radius, and how mitres are handled on visible returns.
- Sheen — high gloss reflects the room and every fingerprint; matte is forgiving but reads differently under warm lighting. Test a real panel at the site's light levels before signing off.
5. Hardware, load and duty cycle
Hardware is usually quoted last and it decides how long the wall behaves like new. Ask what is actually specified, not what brand the brochure mentions.
- Hinges and slides — soft close or standard, and the rated load per shelf and per drawer.
- Adjustable shelving — pin-and-slot or on a track, and how much deflection is allowed at the clear span.
- Wall fixings — what is used for the wall construction on site, especially for masonry, plasterboard or a framed partition.
- Anti-tip and anchoring for tall units in rooms children use.
6. Lighting and electrical
Internal lighting turns a storage wall into a display, but it has to be planned before the carcass is cut: cable routes, transformer position, and a switch that is reachable in the dark.
- Light position — shelf-mounted, vertical-channel or niche top, each giving a different wash across the display.
- Driver location — accessible for service, not buried behind a sealed panel.
- Switching and control — door-activated, touch or remote; agree it at drawing stage with the electrician.
- Colour temperature and colour rendering matched to the room's other lighting so the finishes read the same at night as by day.
7. Integration with adjacent work
A storage wall is rarely alone. It meets flooring, plasterboard, doors, skirting and sometimes a television or an appliance. Decide who owns each junction, in writing.
- Who fills and finishes the perimeter gap — the cabinet maker, the plasterer or the installer.
- Flooring detail — does the unit sit on the finished floor, an inset plinth, or is flooring stopped short of it?
- Appliance and TV cut-outs — dimensions, ventilation and cable access confirmed against the actual appliance datasheet.
- Adjacent doors and architraves — heights and reveals aligned to the joinery line, not set independently.
8. Drawings, samples and sign-off
Nothing enters production until the drawings match what was agreed. This is the gate that protects the schedule.
- Shop drawings with overall dimensions, door sizes and splits, internal elevations, shelf heights, hardware schedule and lighting positions.
- Physical samples of the door surface, edge banding and carcass colour — checked together, not as three separate cards.
- One named approver per trade, so changes are recorded rather than argued about later.
- Change control — every revision after sign-off has a date and a cost line. This is where most project budget leaks happen on joinery.
9. Manufacture, packing and delivery
For projects sourcing from an overseas manufacturer — which is where one-stop project furnishing supplier arrangements earn their keep — the logistics section of the checklist matters as much as the design section.
- Packing specification for tall panels: edge protection, glazing separation, and how each item is labelled against the room-by-room drawing set.
- Container loading plan, so the wall you need first is not at the back of the container.
- Freight mode and Incoterms stated on the order, along with who handles customs clearance and local delivery to site.
- Inspection window on arrival — panels checked against the packing list before the crew starts, so a shortage is reported while it can still be replaced.
10. Installation sequence and handover
Finally, hold the install to a defined order and finish with a snag list rather than a handshake.
- Sequence — carcasses levelled and anchored first, doors hung and adjusted last, so setting-out errors are absorbed early.
- Adjustment — door gaps, alignment and soft-close function checked on every door, not a sample of them.
- Snag list signed by both parties at handover, with the fix dates recorded.
- Spares and service — spare hinges, shelf pins and one replacement panel for high-traffic projects, plus what is covered after handover and how to raise a claim.
Where Santerson fits in this process
Santerson has been manufacturing furniture and building materials since 2008 and supplies full height storage walls as made-to-measure work: dimensions, layout, material and finish are specified per project rather than picked from a fixed module. Because the same supplier handles cabinetry, doors, wall panelling, lighting and flooring for villa and hospitality projects, the junctions in item 7 above get settled inside one drawing set instead of across three trade contracts.
Australian work on the site includes villa cabinetry and joinery projects in North Turramurra, Willoughby, Perth, Melbourne and Sydney, which is where the site access, packing and delivery questions in items 1 and 9 come from. If you are pricing a storage wall for a project, send the measured drawings and the internal layout list and get a specification back you can compare line by line — that comparison is the last item on any serious buying checklist.
Send your drawings, room dimensions and internal layout requirements to SANTERSON for a made-to-measure proposal. Contact PHILLIP — Phone/WhatsApp +86-13928214007, email santerson@qq.com, or use the contact page.