A wardrobe drawing that looks right on paper can still cause trouble on site: the glass reads too light, the frame profile is chunkier than the detail wanted, or the sliding door fouls a ceiling line. Most of those problems start in the brief, not in the workshop. If you are sourcing smoked glass aluminum frame wardrobes for a bedroom fit-out, the quality of what arrives depends heavily on how precisely you describe the job before anyone cuts a panel. The checklist below follows the order we work in on our own made-to-measure wardrobe projects, so you can send a manufacturer a brief that leaves very little to guesswork.

Start with the room, not the door style

Send the manufacturer the shell condition first. Wardrobes are built to the finished line, so we need to know what "finished" means in your project: floor covering and its build-up height, ceiling treatment, skirting detail, and whether plasterboard, joinery or flooring goes in first. A level that is out by a few centimetres changes scribe sizes and door clearances, and it is far cheaper to absorb that tolerance in the carcass than in the site works.

Then give us the practical constraints: clear opening width and height, depth available after the doors, position of downlights, air-conditioning grilles, switches, power points and any bulkhead. Note obstructions within 300 mm of the wardrobe line, because they decide handle choice, hinge type and whether a sliding door can travel freely.

Specify the glass properly

"Smoked glass" covers a wide range of tints, and that is where most disappointment comes from. When you brief us, state:

  • Tint and reflectivity — warm grey, neutral grey or bronze-leaning smoke, and whether you want a reflective or clear look from the bedroom side.
  • Opacity intent — how much of the interior should be legible when the lights are on inside the wardrobe. If privacy matters, say so; a smoked tint alone is not an opaque screen.
  • Surface treatment — polished edge, seamed edge, frosted bands, or a partial frost to hide hanging clothes while keeping the glass look.
  • Safety and fixing — tempered glass with the manufacturer's standard for wardrobe glazing, plus how the panel is seated and retained in the frame.
  • Sample basis — ask for a physical sample of the exact tint, not a photograph. Tint colour shifts dramatically against dark and light interiors.

Judging the same glass against cabinetry? Our smoked glass aluminum cabinets let you place the wardrobe tint and the kitchen or media-wall tint side by side in one material board, which is the fastest way to catch a mismatch before ordering.

Frame profile, colour and hardware

Aluminum frame wardrobes are defined by the section as much as by the glass. In your brief, record:

Item to specifyWhat we need from you
Profile width and edge breakSlim, medium or standard sight line; square or eased edge
Frame colour and finishAnodised, powder-coated or brushed; RAL or your brand standard where you have one
Handle strategyIntegrated profile handle, recessed pull, or external handle with clearance allowance
Door systemSliding, hinged or open; track type and load rating for the panel size you want
Internal lightingVertical profile lighting or shelf strips, sensor or door switch, driver location for servicing

Hardware choice is a comfort issue and a maintenance issue. Sliding systems need accessible tracks for cleaning; hinged glass doors need to clear bedheads, vanities and door swings. If the plan is tight, glass sliding door wardrobes are usually the answer for circulation, while hinged frames give full opening access for walk-in layouts.

Interior layout belongs in the same brief

Do not leave the inside of the wardrobe to be decided after the doors are made. Tell us who uses the space and how: hanging lengths for long garments, shelf spacing for folded stacks, drawer count, a section for luggage, and whether you need an ironing or vacuum bay. Also state what is fixed on site — a stone benchtop in a dressing room changes carcass heights and the reveal at the floor.

Because our wardrobes are made to measure with material, finish and layout set per project, this level of detail is normal for us rather than an exception. What we cannot do is reverse a decision once panels are cut, which is exactly why we hold a confirmation step before production.

What the manufacturer should send back

A serious supplier answers a detailed brief with a detailed document set. Before you approve anything, expect:

  • Shop drawings showing elevations, sight lines, frame sections and door travel;
  • A marked-up plan showing tolerances, scribes and how the unit meets floor and ceiling;
  • A written specification of glass tint, thickness treatment, frame finish and hardware brand or type;
  • A packing and delivery sequence, especially where wardrobes share a container with other joinery or finishes;
  • Named responsibility for site measurement, protection, installation and snag rectification.
Practical habit: sign one document. When drawings, the specification sheet and the quotation are numbered together and countersigned, there is a single reference for inspection on delivery and for any later correction.

If the wardrobes travel internationally

For projects outside China, add logistics detail to the brief early: destination port or site, Incoterms you intend to trade on, who clears customs, packaging standard for glazed panels, container loading sequence relative to other fit-out goods, and the installation support you expect on arrival. Our own project route runs through design and planning, production, logistics, installation and after-sales as one chain, so glazing is packed and labelled to match the room it belongs to rather than arriving as an unlabelled bundle.

For larger packages that mix wardrobes with other joinery and finishes, our turnkey solutions cover villas, hospitality and office projects, and the same coordination applies to a single bedroom range as to a whole building.

A five-minute brief that saves weeks

Before you send an enquiry, collect: room dimensions with the finished line marked; photographs of the three walls involved; your glass tint sample or reference; frame colour preference; door system decision; interior layout sketch; and delivery destination with the site access condition. That package lets a manufacturer price accurately and flag problems while changes are still free.

If you want a second opinion on an existing wardrobe specification, or need made-to-measure frames and glazed doors produced to your drawings, send us the room dimensions and your tint reference through our contact page and we will come back with drawings and a written specification for review.