A swim spa on a villa or resort schedule rarely fails on aesthetics. It fails on the paperwork: an unclear scope, a shell that does not fit the slab, an electrical supply nobody booked, and a quotation that compares two different machines. If you are sourcing Outdoor Swim Spa WS-S10 for a project, the brief you send to the factory decides how clean the rest of the process runs. Below is the structure we ask buyers to fill in, together with the catalog data for this model and the items that must be confirmed before an order is signed.

1. Start with the site envelope, not the model number

Before anything else, send the room or terrace condition. For WS-S10 the catalog lists overall dimensions of 10000 × 2200 × 1420 mm. Treat those figures as the starting point for a site check, not as an approval: confirm the finished level, the access route from the delivery vehicle to the pad, and whether the unit is fully recessed, partially recessed or above ground. Recessed installations change what you must specify — ventilation openings at the plant compartment, an access hatch for service, drainage around the shell, and a load path for the deck edge.

Write into the brief: pad dimensions and level tolerance, structural support detail, distance from the nearest power intake, and the largest opening the shell has to pass through on site. A factory cannot price what it cannot see.

2. State the configuration you actually want

WS-S10 sits in a configurable outdoor swim and hydrotherapy range, and the same shell can be ordered with different equipment sets. The catalog record for WS-S10 shows water jets, LED lighting and ozone as the features shown, along with one control system set, two water pumps, one filter pump, 76 jets in total, one main LED light plus 40 small LED lights, and a total power figure of 7.65 kW.

That equipment list is what makes quotations comparable. Two projects can both ask for a spa of the same length and receive different machines at different prices, because the swim training system appears as an option within this range rather than as a fixed item. In your brief, list the equipment line by line and ask the supplier to confirm each line as included or optional:

  • Control system — quantity, interface type, and where it is mounted so the owner can reach it.
  • Pumps — how many water pumps and filter pumps, their duty, and where they sit relative to the plant compartment.
  • Jets — total count and how they are zoned, since zoning drives the control layout.
  • Lighting — main fixture plus small LED lights, and whether the driver is accessible for maintenance.
  • Water treatment — ozone as listed, with any additional sterilisation option quoted separately.
  • Swim training system — state clearly whether your project needs it. If a quotation is silent on this line, you are not comparing like with like.

3. Put options and accessories in their own table

Catalog-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so do not assume an accessory listed on a catalogue page is available on your configuration. Ask the supplier for two columns: what is included in the base price, and what is priced as an option with its lead time.

Two of those options carry long-term consequences and should be settled at design stage rather than at order stage. A heat pump sets the electrical load and the noise profile beside a terrace; insulation determines how much of that load you pay week after week in an unheated outdoor position. Specify both with the operating assumption written down — year-round use, or seasonal use.

4. Fix the services before the quotation

The catalog records total power for WS-S10 at 7.65 kW. Do not let that figure travel into your electrical drawings unverified: ask the factory to confirm supply voltage, phase, dedicated circuit sizing, protective device requirements, and the routing of low-voltage connections for lighting and control, for the exact configuration you are buying. Hand that confirmation to the local electrician and plumbing contractor, and make their scope explicit in the brief — who supplies the isolator, who runs the feed to the unit, who connects the overflow and the drain.

Write one line naming the responsible party for each service. Most swim spa disputes on site are not about the product; they are about a gap between two subcontractors' scopes.

5. Specify how it arrives and who sets it in place

A shell of this length needs a delivery plan, not just an Incoterm. In the brief state the destination address, the delivery window your site can accept, and whether you need door-to-door delivery or a port handover. Ask for the packing method, the container arrangement, and the crane or forklift capacity needed to place the unit — then confirm who pays for that lift.

If the spa is part of a larger order, say so in this section and ask for one consolidated shipment plan. A swim spa, outdoor furniture for the same terrace and other pool-side items often arrive on different lead times, and a single plan covering all of them is what stops the site from being handed over with half the scope installed.

6. Name the handover and after-sales terms you need

Close the brief with what happens after installation: commissioning support, the snag list process, warranty scope and exclusions, spare-parts availability for pumps, jets, lighting and control components, and the recommended maintenance routine for the water treatment system as configured. Ask for these in writing against the configuration you ordered. A specification that ends at "delivered" is the one that generates cost later.

A short brief template you can copy

  • Project and site — location, indoor or outdoor, recessed or above ground, access route from vehicle to pad.
  • Shell — model reference, catalog dimensions checked against the pad, finish of all visible surfaces.
  • Equipment schedule — control system, pumps, jets and zoning, lighting, water treatment, swim training system (yes or no).
  • Options — heat pump, insulation, UV sterilisation, sand filtration, steps, each priced and dated.
  • Services — confirmed electrical parameters, plumbing connections, ventilation for a recessed plant compartment.
  • Logistics — delivery term, packing method, lift method, and who carries the lifting cost.
  • Handover — commissioning, snag list, warranty terms, spare parts.

Send your site dimensions and equipment schedule to SANTERSON for a configuration-specific quotation on Outdoor Swim Spa WS-S10.