An arched paneled wardrobe is one of the few built-in pieces where the drawing has to be right long before production starts. The curve of the arch, the width of each panel, the reveal between them and the way the carcass meets an uneven ceiling all get decided on paper, so the conversation you have with the manufacturer matters more than the conversation you have on site. Our Arched Paneled Wardrobes sit inside the Classic Paneled collection and are made to measure for each project, which means almost every dimension and surface is a decision you can steer. The checklist below covers what to specify, in what order, and what to put in writing.

Start with the wall, not the elevation

Before any door style is chosen, send the manufacturer the actual condition of the opening. A wardrobe that looks correct on a CAD elevation can still sit badly against a floor that slopes across its length, a ceiling that drops a few millimetres from one end to the other, or a corner that is not square. For a made-to-measure unit these tolerances are absorbed by the carcass and the scribe, but only if someone knows about them in advance.

What we need from you at this stage:

  • Overall width, height and depth measured at several points along the opening, not just one
  • Floor finish build-up — screed, adhesive and the final floor covering, with the finished level marked
  • Ceiling condition above the unit: plasterboard, rebate, cornice, or a service void that must stay accessible
  • Position of downlights, air-conditioning diffusers, sprinkler heads and curtain boxes near the top of the unit
  • Skirting or architrave that has to be removed, and any wall insulation or backing needed to support the fixing
  • Whether the unit is butting into a window reveal, a door opening or another run of joinery

If the room is still being built, note which trades finish before installation. That single line on the programme decides whether we install to a rough opening or to a completed one, and it prevents a second visit.

Agree the arch geometry in detail

"Arched" means several different things on a drawing, and buyers often specify only that word. Ask for the geometry to be dimensioned explicitly:

  • The radius of the arch, and whether it is a true semicircle or a flattened segment
  • Where the springing point sits — the height at which the straight run stops and the curve begins
  • Whether the arch is a profile on the door frame, a soffit panel spanning the top of the unit, or a decorative screen in front of it
  • The relationship between the arch radius and the vertical panel module below it, so the panel joints line up with the curve rather than cutting across it awkwardly
  • Whether the same arch profile repeats elsewhere in the room — headboard panelling, niche Custom Niche Paneling, or a door — and whether those profiles must match exactly

A practical step here is to ask for a full-size template of the arch profile before the doors are made. It is cheap, it settles the drawing dispute in one page, and it lets the interior designer confirm proportions against the actual ceiling height.

Decide the panel construction and its scale

Panelled doors are defined by proportion. The same room reads very differently depending on how wide the styles are, how deep the moulding is and whether the field is raised or recessed. Specify these rather than leaving them to the workshop:

  • Style width and rail-and-stile proportions relative to door height — tall rooms usually need longer verticals so the door does not look chopped up
  • Moulding depth and profile sharpness: a soft, shallow moulding reads modern; a deeper, crisper one reads traditional
  • Number of panels per door, and whether panels align across adjacent doors and with the arch above
  • Centre post position where two doors meet, so handles sit symmetrically
  • Whether an arched top rail is a single bent piece or a laminated assembly — this affects both lead time and how the finish wraps the curve

Related styles in the same collection are worth reviewing side by side when proportions are being argued over: Raised Panel Wardrobes, Recessed Panel Wardrobes and shaker panel wardrobe designs all use the same carcass logic, so comparing their moulding depth on one sample board makes the choice obvious.

Specify substrate and finish together

Curved and moulded components put more demand on a finish than a flat slab does. Edges break, grain direction changes across a rail, and a dark pigment collects in the shoulder of a deep moulding. Discuss Custom Furniture Materials and Finishes as one decision, not two:

  • Door substrate — solid timber, engineered board or MDF for painted work — and how it behaves where the arch curves
  • Surface: paint or lacquer, laminate, foil, veneer or a wood-effect decorative surface, each with different edge behaviour on a profile
  • Sheen level, and whether the sheen is uniform across a moulded face or deliberately lower in the recesses
  • Colour reference: an RAL or Pantone number for painted work, or a physical sample board where a wood tone has to match existing joinery
  • Grain direction across rails and stiles — matching or contrasting — stated on the drawing
  • Finish on faces nobody sees: carcass interiors, the back of doors and the underside of the arch soffit

Order a colour and sheen sample on an actual moulded profile, not just a flat chip. A flat sample of a satin paint tells you very little about how that paint will sit in the corner of a deep panel.

Plan the internal layout around how it will actually be used

The arch costs vertical hanging space at the ends of the top run, so internal planning is where an arched unit most often goes wrong. Work out what has to hang full height before fixing the springing point.

  • Hanging heights: long-garment zones for dresses and coats, double hanging for shirts and folded wardrobes, and clear drop below shelves
  • Shelf positions above the arch line versus inside the accessible zone — shallow top bays work for luggage and seasonal items, not daily access
  • Drawer stacks and their height: shallow trays for accessories, deeper drawers for folded knitwear and linen, and pull-out trays where the door opening is narrow
  • Whether Boutique Style Walk in Wardrobes logic applies — island or open display elements, glass-fronted bays for bags and accessories — or whether the room is a single closed run
  • Integrated lighting: door-triggered, motion-activated or always on; where the transformer sits; and how the fitting is serviced after installation
  • Accessories fixed to the drawing rather than added later: trouser slides, shoe racks, valet rods, ironing panels, safes in hotel rooms

Where a project includes several bedrooms or guest rooms, agree one standard internal layout and one set of variations instead of redesigning every unit. Repeating modules shortens the approval cycle and keeps pricing consistent across the schedule.

Hardware: what has to be on the drawing

Handles, hinges and sliding gear are frequently left until the end, then constrained by a door that is already designed. Fix them with the elevation:

  • Handle type and centre distance, checked against panel proportions so it does not sit across a moulding
  • Hinge type and load rating for the door weight — an arched top rail adds mass, so hinges have to be rated for it rather than taken from a standard flat-door schedule
  • Door overlay and reveal between doors, plus clearance at the arch where adjacent doors meet at an angle
  • For sliding configurations: track type, bottom clearance, soft-close specification and how the frame is scribed to the arch
  • Finish of metalwork — whether it matches other ironmongery in the project or is deliberately different
  • Fire rating, accessibility requirements or door closers where the project's door schedule calls for them; state these early, as they change hinge and frame specification

Tie the unit to the rest of the joinery package

A wardrobe rarely specifies itself in isolation. If the same supplier also provides Built-in Furniture elsewhere in the project — kitchen cabinetry, vanity units, media walls, doors and panelling — then colour, moulding profile, edge detailing and carcass construction should be settled once and applied consistently. That is also where a single supplier saves administration: one set of drawings, one finish schedule, one delivery programme and one point of contact for snags.

Buyers sourcing several trades at once usually compare on price per unit. The more useful comparison is what each quotation includes: site survey, shop drawings, sampling, packing, freight, replacement parts for transit damage, and installation support. Ask each supplier to price the same scope before comparing numbers.

What to have signed off before production starts

  • Dimensioned elevations of every unit, with the arch radius and springing height marked
  • Internal layout drawings with hanging heights, shelf levels and drawer sizes
  • Finish schedule: substrate, surface, colour reference and sheen, on a moulded sample you have approved in writing
  • Hardware schedule with hinge load ratings and handle positions
  • Confirmation of site sequence — which trade finishes before installation, and the date the opening will be ready
  • Delivery terms and packing specification for the distance involved, plus who handles transit damage

Once those six items are agreed, production moves without queries. Where they are left open, the delays surface at exactly the wrong moment — after the arch profile has been cut.

Send us your drawings

If you have an elevation, a finish schedule or even just a room dimension, send it over and we will come back with shop drawings for an arched paneled wardrobe built to your opening, along with a moulded finish sample for approval. As a China-based furniture and building materials manufacturer working on villa, hotel and residential projects, we handle the survey-to-installation sequence in one package, so the arch you approve on paper is the arch that arrives on site.