An integrated bar system looks simple on a drawing: a run of cabinetry, a stone top, some glass shelving, lighting. In practice it is one of the few joinery items in a villa project that pulls together cabinet carcasses, stone fabrication, electrical work and appliance provisions at once. That is exactly where an international project order can go wrong — not in the design, but in the handover between four trades on three different continents.

This guide walks through how we plan a project order for Santerson Integrated Bar Systems from specification to site delivery, and what your team needs to have decided before production starts.

1. Fix the scope before anyone quotes a price

Bar joinery gets mis-specified because it is rarely drawn to the same depth as kitchen cabinetry. Before a purchase order is raised, three decisions should be closed out in writing:

  • Which bar configuration the project needs. Our Integrated Bar Systems, Island Bar Units, Compact Bar Cabinets, Wall Mounted Bar Units and Glass Front Bar Cabinets are built to the same made-to-measure principle, but they carry different structural and service requirements. An island unit needs floor fixings and usually power runs below the slab; a wall-mounted unit needs blocking in the substrate.
  • Whether appliances are inside the joinery. Wine cabinets, under-counter fridges, ice makers and dishwashers change carcass dimensions, ventilation gaps and the electrical schedule. If an appliance is being supplied locally, send us its model sheet before we draw the carcass — not after. Where appliances sit inside tall units, our Integrated Appliance Tall Cabinets follow the same rule: appliance dimensions, ventilation and electrical requirements must be confirmed per project.
  • Where the bar stops and the rest of the room begins. Deciding early whether the bar top, splashback and adjacent wall panelling come from the same order avoids finish mismatches later. Our Stone & Marble Surfaces and Integrated Cabinet Lighting can be produced alongside the cabinetry so the stone, timber tones and lighting temperature are approved as one package.

2. Send us the information that actually drives production

For a made-to-measure order, the quality of your first file set determines how many revision rounds follow. A workable brief includes:

  • Elevated drawings with finished dimensions and floor-to-ceiling heights, marked in millimetres
  • Finish references — veneer species, lacquer sheen, glass tint, hardware style — rather than adjectives such as "dark wood"
  • Stone type and slab thickness for the top, plus edge profile if you have one specified
  • Appliance model sheets and the electrical layout, including where isolators and outlets should land
  • Site constraints: lift sizes, stair widths, door openings and the delivery access route

If drawings are still at concept stage, our design team can work from plans and reference images. The interior design service covers space layout planning, mood boards, 3D renderings and production coordination, so a bar that exists only as a Pinterest board can be turned into shop drawings your site team can build to.

3. Approve samples, not screenshots

Colour on a screen is not colour on a veneer. Before production runs, we recommend approving physical samples for any finish that will be visible in the same sightline as other joinery in the project — the bar fronts against the kitchen, or the bar carcass against wall panelling. Lighting changes how lacquer and veneer read, so review samples under the same colour temperature you intend to install in the bar. Where a project requires non-standard sizes, textures or branding, our custom and OEM service covers bespoke finishes, prototyping and material selection across wood, metals, engineered stone and laminates.

4. Plan the freight around the site, not the factory

Bar units are long, heavy and easy to damage in transit, so packing and container planning are part of the engineering, not an afterthought. Our logistics and door-to-door delivery service handles freight forwarding by sea, air and rail, together with commercial invoices, packing lists, certificates of origin and other customs paperwork, container loading plans and shipment tracking.

Two practical points that save project managers real money:

  • Sequence the delivery against site readiness. Bar joinery should arrive after wet trades, flooring and ceiling services are complete, but before loose furniture. Tell us your installation window when we quote, so production is scheduled backwards from it rather than forwards from the order date.
  • Consolidate with the rest of the fit-out. Because cabinetry, stone surfaces, lighting and other furniture and building materials can come from one order, bar units often travel in the same container as vanities, wardrobes or panelling for the same building. Fewer shipments means fewer customs entries and one delivery to coordinate on site.

Import terms, duties and Incoterms differ by destination and change over time, so we confirm these with you case by case rather than quoting assumptions from a previous project.

5. Installation: what needs to be true on site

Most on-site problems with imported bar joinery trace back to services, not cabinetry. Before the crates open, your site team should have completed:

  • Power, data and isolator positions tested and recorded against the approved electrical drawing
  • Substrate blocking and floor fixings set out to the fixing lines on our shop drawings
  • Level, dry floors with final heights confirmed — an integrated unit cannot absorb a 20 mm floor build-up
  • Cool, dry, secure storage for the crates until installation begins

Our installation and after-sales support covers on-site fitting, inspection and snag lists, spare parts and ongoing maintenance. Availability of local installers varies by country, so we confirm the arrangement for your location before the order is placed.

6. A practical timeline to work backwards from

For a multi-villa or hospitality package, plan in this order: specification and drawings approved, samples signed off, production scheduled, freight booked against the site window, then installation. Each stage has a sign-off that should be documented before the next one starts. If your programme has a fixed handover date, share it at enquiry stage — we will tell you honestly which parts of a bar package can meet it and which cannot.

If you have drawings ready, send them to us through the contact page with your project location and target installation window, and we will come back with a specification review rather than a generic quotation.