A made-to-measure Mahogany Solid Wood Wardrobes order is only finished when the panels, doors and hardware arrive on site in a condition that allows installation to start on schedule. Timber joinery is heavy, and its corners, edges and finished faces are the parts most easily damaged in transit. Replacing one damaged door means remaking it to the same specification, which can push a bedroom handover well beyond its planned date. Before you release production, the packaging questions below should be answered in writing.
1. How will the wardrobe be broken down into packages?
Our Mahogany Solid Wood Wardrobes are made-to-measure, with layout, dimensions and finish specified for each space, so there is no standard carton size to fall back on. Ask your supplier to send a packing list that shows the piece-by-piece breakdown before production: carcass boxes, door panels, shelves, drawers, hanging rails, plinths and any glass or mirror elements, each with its own dimensions and gross weight.
This list matters for three practical reasons. It tells you whether the longest panel will pass through the site doorway and up the stair or lift of a villa or apartment. It lets your local freight agent quote accurately on the number and size of packages. And it gives the installation team an unpacking sequence, so the wardrobe can be assembled room by room rather than with every component open at once.
- Are doors packed separately from carcasses, or assembled as one unit?
- What is the single heaviest package, and can it be handled by the number of installers you have on site?
- Are tall panels packed upright or flat, and does that match how they will be stored at your site?
- Is the package count consistent with the assembly drawing, so nothing arrives in a second shipment?
2. What protects the mahogany finish in transit?
For solid timber joinery the visible damage is usually concentrated at corners, edges and on the face of the finished panel. Confirm the protective system layer by layer instead of accepting the phrase "export packing":
- Corner protection on every panel edge, not only on the outermost boxes.
- A soft interleaving layer between finished faces, so panels do not rub against each other during road and sea movement.
- Moisture barrier around solid timber components, since a container holds changing humidity over a long voyage and timber moves with it.
- Rigid outer case — plywood crate or reinforced carton — matched to the weight of the package rather than its size.
- Fumigation or heat-treatment marks on any solid timber packing material, if your import clearance requires them. Ask your own customs broker which rules apply to your destination; we prepare the paperwork but do not advise on your local regulations.
3. Who loads the container, and how is it documented?
Our Furniture Logistics and Door-to-door Delivery service covers packaging and container loading, freight forwarding by sea, air and rail, customs paperwork and shipment tracking. What we cannot control is what happens after the container is opened at your end, so agree the documentation that lets both sides check the same facts:
| Document | What it should show |
|---|---|
| Packing list | Package count, dimensions, gross and net weight, piece marks matched to the assembly drawing. |
| Loading photographs | Interior of the container at mid-load and at closure, plus bracing and dunnage in place. |
| Marking on each package | Piece number, crate number of that shipment, "this side up" and moisture-protection symbols. |
| Commercial paperwork | Invoice, packing list and certificate of origin consistent with the physical count. |
Photographs taken before the doors are closed are the fastest way to settle a damage claim, because they establish how the goods were secured. If you arrange your own freight, request these images from the loading point rather than assuming they exist.
4. What inspection routine should your site team follow?
Most packaging failures are found at delivery, not in production. A short routine on the day the container arrives keeps responsibility clear:
- Photograph the container seals and any external damage on the crates before anything is moved.
- Count packages against the packing list and record the piece marks as they come off the truck.
- Open one crate per package type, check corners, edges and panel faces, then re-close it.
- Note hidden damage in the delivery note within the time window your carrier allows for claims.
- Store crates indoors, off the floor and flat, until installation begins — do not stack finished panels against a wall on a job site.
5. What does replacement of a damaged part involve?
Because each wardrobe is built to the dimensions and finish confirmed for your project, a replacement door or side panel is remade to that same specification rather than taken from stock. Before you sign an order, confirm three points with your supplier: how the specification is archived for re-orders; whether the finish batch can be matched for a single replacement panel; and who pays the freight on a replacement, and under what evidence. These answers tell you more about real risk exposure than any general warranty statement.
Ordering packaging that fits your site
As a Custom Furniture Manufacturer, we build the wardrobe to your drawings and pack it against the access conditions you describe for the site. Send us the room dimensions, the delivery route and the installation window, and we will confirm the package breakdown, protective system and paperwork that go with it — including coordination with Furniture Installation and After-sales Support so the unpacking sequence matches the assembly drawing.
Send your wardrobe drawings and delivery address, and we will reply with a piece-by-piece packing plan for your project.