A wardrobe quote is where a walnut veneer bedroom project either holds together or quietly falls apart. The sample door looks right, the price looks reasonable, and then the finished joinery arrives with a different grain direction, a board foot that does not match the opening, or no clear answer about who handles a damaged panel on site. If you are sourcing built-in wardrobes from a China-based manufacturer for a villa, apartment or hospitality fit-out, the quote itself is the document to interrogate. Below is what we ask buyers to confirm line by line before they place an order for Walnut Veneer Wardrobes.

Start with the scope of supply, not the price

Two quotes for what looks like the same wardrobe can differ by a wide margin simply because they include different things. Before comparing numbers, write down what each quote actually covers. A made-to-measure wardrobe package should state, in plain words:

  • Which rooms or walls are included, and the number of linear metres or units priced.
  • Whether doors, carcass, internal fittings, plinths, scribes and any pelmet or top panel are in scope.
  • Whether lighting, glass inserts, mirrors and handles are included, optional or excluded.
  • Who is responsible for site measurement, drawings, production, packing, freight, clearing customs and installation.

At SANTERSON we price wardrobe work as part of a wider fit-out, so the quote names each room package separately. That matters when you are also ordering Walnut Solid Wood Wardrobes for one bedroom and veneer panels for another: matching timber tones across two product families is a specification decision, and it should be visible in the quotation rather than discovered at handover.

Read the material description the way a workshop reads it

"Walnut veneer" on its own is not a specification. Ask the supplier to state, and put in writing:

Item on the quote What you want to see stated Why it matters
Veneer face Species and cut (for example crown or quarter cut), whether the leaves are book-matched or slipped, and which face of each panel is visible. Cut and matching decide whether the grain reads as one continuous surface across a bank of doors or as separate rectangles.
Substrate and construction Board type for carcass, doors and shelves, edge banding method, and how the veneer is pressed and edged at door edges. Edge treatment is where cheap veneered work fails first on a sliding or hinged door.
Finish Sheen level, lacquer or oil system, and whether the finish is applied in the factory or on site. Factory-applied finish travels better and avoids spray work in an occupied dwelling.
Colour reference A physical sample or approved board reference number, signed off before production starts. Screens do not reproduce walnut reliably. An approved physical sample becomes the acceptance benchmark.
Internal layout Hanging zones, drawer banks, shelf spacing and any accessories, shown on a dimensioned drawing. Layout changes after drawings are signed off are the most common cause of variation costs.
Tolerance and fit method How the unit meets an uneven floor or ceiling, scribe or filler widths, and which party prepares the substrate. Built-in wardrobes are judged at the wall junction. Scribing is a scope item, not a surprise.

Our walnut veneer wardrobe line is made to measure with material and finish options selected per project, and dimensions and specifications are confirmed for each order before we cut anything. If a quote you receive does not carry that confirmation step in writing, treat the price as provisional.

Check how the quote handles measurement and drawings

For imported joinery the sequence is fixed: site dimensions taken on the finished floor and wall levels, drawings issued for sign-off, production released. A usable quote says who measures, when the drawing round happens, and what changes are still free at that point. Ask three specific questions:

  • Are dimensions taken from a completed space, including skirting, architraves, cornices and any services running down the wall?
  • Do the drawings show door swing or track clearance, handle positions and drawer fronts relative to the bed and doorway?
  • What is the cut-off for layout changes once drawings are approved, and how are they priced?

This is also where a custom minimalist bedroom wardrobe specification earns its keep: handleless fronts and full-height panels look simple, but they demand accurate walls and a precise drawing set. A quote that offers a seamless look without mentioning how the opening will be prepared is describing an aspiration.

Price structure: what should be itemised

A single line total tells you almost nothing about risk. Ask for the price broken into production, packing, freight to port, ocean or air freight, insurance, destination charges and delivery to site. Then confirm which Incoterms apply and who clears customs and pays duty and taxes in the destination country. For a multi-bedroom order, ask how spare panels and hardware are handled: whether a spare door panel is offered, what it costs, and how quickly it can be produced if one arrives damaged.

A practical test before you sign: read the quote for the words "as agreed", "TBC" or "optional". Every one of them is a decision that has not been made yet, and each will cost more once production has started.

Installation, warranty and after-sales terms

Decide early whether local trades or the supplier's team will install. Our service scope covers design consultation and space planning, custom and OEM manufacturing, logistics with door-to-door delivery, and installation and after-sales support; the exact arrangement, including who installs in your country, is confirmed project by project rather than assumed. In the quote, look for:

  • What inspection happens before packing, and what photographs or records you receive.
  • The warranty period, what it covers for veneer, edges and hardware, and what voids it.
  • How replacement parts are ordered, and the lead time for a single replacement door.
  • Whether on-site guidance or installation is included, and how it is scheduled around your trade programme.

A five-minute check before you send the purchase order

Run the quote past this list. If any answer is missing, get it in writing first — a supplier who answers precisely at quotation stage will answer precisely during production.

  • Veneer species, cut and matching method named on the sheet.
  • Physical finish sample approved and referenced by number.
  • Dimensioned drawing round and change cut-off date stated.
  • Scope of supply for doors, carcass, internal fittings and scribing defined.
  • Incoterms, freight mode, insurance and customs responsibility named.
  • Warranty terms and replacement-part lead time recorded.

Send us your room dimensions, drawings or photographs and the finish you are working to, and we will return an itemised quotation for walnut veneer wardrobes that shows each of these points on the sheet — including what is included, what is optional and what needs site preparation before production begins.