An integrated basin reads as one clean surface: countertop and washbasin flow into each other with no visible seam, no rim to caulk, no lip to trap water. That seamless look is exactly why it fails when it is treated as an off-the-shelf item. The moment a drawing shows a generic rectangle in the corner of a bathroom, the project inherits a set of unresolved questions about size, waste position, substrate and site access.
On villa and hospitality fit-outs we supply, the integrated basin is one of the few fixtures where the drawing, the factory and the site team all have to agree before anything is cut. Below is the sequence we work to, and the specific information we ask a designer or contractor to confirm at each stage.
What an integrated basin actually requires from the drawings
Unlike a Santerson Undermount Basin, which is bought as a separate ceramic bowl and dropped through a cut in the counter, an integrated basin is formed from the countertop material itself. The bowl, the fall to the waste, the overflow detail (where one is specified) and the counter all come from the same fabricated piece. Two consequences follow directly:
- The dimension is a fabrication dimension, not a purchase size. A vanity unit can be adjusted on site by a few millimetres; an integrated basin cannot. Once the slab is cut and the bowl milled, the piece is finished or scrapped.
- The waste and tap positions are fixed at fabrication. Drain, waste fitting, tapware spacing and any wall-mounted spout must be resolved on paper before production starts, because they sit inside the stone.
For this reason our Integrated Basin is made to measure, with material, finish and layout specified per project. There is no standard catalogue size to default to.
Information we need before production starts
The list below is what we check against the design drawings. Missing items are the usual cause of a re-cut, so it is worth resolving them at tender stage rather than at shop-drawing approval.
| Item to confirm | Why it matters on site |
| Overall counter length, depth and thickness | Slab size and edge build-up determine whether the required thickness is achievable; a thinner design intent may need a built-up edge or a different slab. |
| Bowl position, internal bowl dimensions and bowl depth | Sets clearance to the wall, to the mirror and to the adjacent user in a shared counter. Bowl depth also governs how much material can be milled out. |
| Waste location and waste fitting type | Determines where the trap drops into the floor or wall chase. A waste that lands on a joist or a structural wall is a site problem, not a factory one. |
| Tapware selection and hole positions | Deck-mounted, wall-mounted and spout-and-bridge fittings each need different hole patterns or none at all. Late tapware changes can leave visible unused holes. |
| Material and finish | Our Santerson Stone & Marble Surfaces range is specified by slab, with veining direction and surface (honed or polished) agreed per project. Natural stone varies between blocks. |
| Support and carcass detail | A floating counter needs a batten or steel frame sized to the finished weight, including water in the bowl. |
| Access route and piece size | Stair cores, lifts and door widths decide whether the counter arrives as one piece or is jointed. This has to be settled before fabrication, not on delivery day. |
Reading the design drawings against site reality
Design intent and as-built rarely match exactly. Our shop drawing stage exists to close that gap, and it works best when a measured survey or the latest architectural setting-out plan is available.
1. Verify against site measurements, not the tender plan
Take finished-floor level, finished-wall face, and the actual position of soil and waste outlets from site. Wall tiling build-up moves the finished wall face by a margin that is enough to change a basin's setback from the wall, so measure it rather than assume it.
2. Resolve the wet services before the stone is cut
The plumber's first fix has to follow the approved shop drawing, not the other way round. We mark out waste centre, tap centres and any overflow on the drawing; the trades set the pipework to those coordinates. Where a project uses a Santerson Integrated Countertop Vanity, storage carcass, basin geometry and services all sit on the same drawing, which keeps the drawer run clear of the trap.
3. Coordinate the surrounding finishes
Back splashes, wall tiling lines, mirror position and Vanity Lighting all reference the counter edge. A single coordinated setting-out line running through counter, mirror and light keeps those three trades from working to different dimensions.
4. Agree the joint strategy where counters run long
In shared family bathrooms and hotel vanity runs, a long counter is often better delivered in two pieces with a joint positioned under a bowl or away from the front edge. That decision changes the fabrication drawings, so it belongs at approval stage.
Delivery, handling and installation
Integrated basins arrive crated upright, with the bowl face protected and the piece individually packed. On arrival, check the crate for shift in transit before it moves off the truck, then dry-lay the counter on the prepared support to confirm level and front alignment before any adhesive or sealant is applied. Final connection of waste and tapware happens after the piece is set and levelled.
As part of our turnkey scope, we handle door-to-door delivery to site and provide installation and after-sales support, so the same team that fabricated the counter is available through fitting rather than handing it over at the factory gate.
Why sourcing it with the rest of the fit-out helps
Bathrooms rarely fail on one item; they fail where two trades pass work between them. When the counter, the vanity carcass, the mirror cabinet and the wall finishes come from one supplier, a single set of shop drawings governs all of them. For a full bathroom package we produce coordinated Santerson Double Vanity and single vanity units alongside the stone worktops, so basin geometry, storage layout and tiling lines are resolved once.
SANTERSON has been manufacturing furniture and building materials since 2008, supplying custom and OEM work for villa, hotel and office projects. Because the basin is fabricated to the drawing rather than selected from a catalogue, unusual sizes, non-standard bowl depths and specific stone selections are handled as normal project work.
Common coordination problems we see
- Bowl too close to the wall. Splash zone shrinks and users knock wrists on the backsplash. Fix by setting the bowl centre from the finished wall face, not the structural face.
- Tap holes drilled for the wrong fitting. Confirm tapware model before fabrication; wall-mounted spouts need no deck holes at all.
- Waste dropping into a joist bay. Check the ceiling or floor below before signing off waste centre.
- Counter too deep for the access route. Measure lift and stair dimensions early, then decide on joints.
- Veining running the wrong way. For natural stone, specify the cutting direction against the slab template when the pattern matters visually.
FAQ
Can an integrated basin be repaired if it cracks on site?
Small chips in stone can often be filled and re-finished on site by the fitting team. A crack through the bowl usually means remanufacture, which is why packing, access and dry-laying matter.
Which is easier to coordinate: integrated or undermount?
An undermount basin is more forgiving because the bowl is a separate item and the cut can be adjusted slightly during fitting. An integrated basin needs complete dimensions up front in exchange for the seamless surface.
When should we place the order?
After the shop drawing is approved and before first-fix pipework is set. Ordering earlier means guessing services; ordering later means the trades wait.
Send us your drawings
If you have a bathroom layout in mind, send the plan, elevations and your preferred material or finish. We will return a shop drawing showing bowl geometry, waste and tap positions, and the fabrication size for confirmation — before any stone is cut. Contact PHILLIP to start that coordination stage on your project.