A request for quote that only carries a cabinet name and a room length will come back with a price you cannot compare. Cabinet quotations are built from panel specification, hardware selection, appliance interface details, delivery terms and site tolerances — and when any of those are missing, the supplier fills the gap with an assumption. That assumption is what later appears on your project as a variation order.
This guide sets out what to put in an RFQ for our Santerson Shaker Style PVC Cabinets, a shaker-front cabinet line we manufacture to project dimensions. The same information structure works across the wider kitchen programme, so you can send one RFQ format to several suppliers and read the answers side by side.
Start with the scope of supply, not the finish
Before any finish or handle is discussed, state what the quotation must cover. A single line reading "kitchen cabinets, 1 set" invites a narrow price that excludes exactly the items most likely to change cost: tall units, appliance housings, end panels, plinths, scribes to an uneven wall, and the fillers between a run and a window reveal.
For this product family we quote made-to-measure sizing, material and finish options, and a layout tailored to the project. Confirm dimensions and selected specifications for each project before treating any figure as final.
Specify the shaker door and the carcass separately
The shaker profile is the visible element, so it is usually described in detail. The carcass behind it is quoted generically, which is where quotations diverge. Give both.
- Door specification: shaker profile style and rail/stile width, front substrate and surface treatment, edge treatment on the panel recess, colour or grain reference from a named sample, and whether the finish is applied to both faces of a visible door.
- Carcass specification: panel type and thickness for sides, tops, bottoms and shelves; edge banding material; back panel thickness and fixing method; and the shelf spans that will carry small appliances or stacked goods, so the supplier can state what they have built into the quotation.
- Consistency across rooms: if the same door is used in the kitchen, laundry and bedroom joinery, say so in the RFQ. Matching a finish across separate orders costs more than ordering it together, and this only surfaces after both are quoted.
One point of naming to settle in writing: this product is listed under a PVC cabinet name, while the page copy also refers to a plywood construction. Do not let an RFQ assume one or the other. Ask us to state, line by line, the substrate of the door front, the substrate of the carcass panel, and the surface treatment applied to each. Where a product family covers more than one construction, we quote against the specification you confirm rather than the page title.
Give hardware its own section
Hardware is where a low quotation usually wins and then loses. List it as separate priced lines rather than folding it into "cabinets supplied".
| Item to state in the RFQ | Why it changes the price |
| Hinge type and closing action | Standard, soft-close and concealed options differ per door; quantity follows door count. |
| Drawer system and runner rating | Side-mount versus undermount runners, and load rating, are priced per drawer, not per unit. |
| Handle specification or handleless detail | A handleless profile needs routed fronts or a channel rail, which is a door-production change, not an accessory. |
| Interior fittings | Pull-out trays, corner carousels, cutlery organisation and larder racking are quoted per fitting. |
| Integrated lighting | Cabinet lighting needs a channel or drilling detail plus a driver location — decide it at quotation stage, not on site. |
Ask for the hardware brand and model reference in the quotation itself. If two quotations both say "soft-close hinges", they are not comparable until the model reference is stated.
Attach the interface details that sit outside the cabinetry
Cabinetry clashes with everything it touches. Include these in the RFQ package so the price reflects your actual build:
- Appliance schedule: model and dimensions for oven, cooktop, dishwasher, refrigerator and any integrated units, plus which are built-in and which are freestanding. Built-in appliance housings are cabinet work; freestanding units only need a recess.
- Worktop interface: worktop material and thickness, whether the top sits on the carcass or on an integrated frame, and the edge detail at the wall.
- Splashback and tiling line: where tiles end and cabinetry begins, and whether scribes are priced or left to the tiler.
- Services: sink cut-out position, tap and waste clearances, electrical outlet positions behind tall units, and ventilation route for any cooker hood.
Send drawings with a dimensioned schedule
A sketch is not enough to price custom cabinetry. The minimum set that produces a firm number:
- Elevations of every run, fully dimensioned, with finished floor level marked.
- Plan showing room dimensions, wall projections, doors, windows and the ceiling height where tall units reach it.
- A unit schedule listing each item, its width, height and depth, door or drawer configuration, and quantity.
- Notes on out-of-square walls, floor level variation and any obstructions you already know about.
Where your site has been measured by others, send the measurement record rather than a redrawn interpretation of it. Tolerance is a production decision: scribing a unit to a 15 mm wall deviation is not the same job as scribing it to 3 mm.
Set the commercial terms you want quoted against
State these explicitly, otherwise each supplier chooses their own basis and the comparison becomes meaningless:
- Pricing basis: unit price, per linear metre, or itemised schedule — and whether packaging is included.
- Delivery terms: destination port or site address, and who carries freight, insurance and import clearance. Our logistics and door-to-door delivery service covers freight forwarding, customs paperwork, packaging and container loading; the Incoterms and scope for your project are confirmed in the quotation.
- Order sequence: whether the joinery is one order or released in batches by room, and which rooms come first.
- Approval steps: sample approval before production, drawing sign-off, and what happens to the price if a change follows sign-off.
- Site support: whether installation is included, and how inspection and snags are handled at handover. See our installation and after-sales support service.
Where custom work belongs in the RFQ
Anything non-standard should be a named line, not a footnote. Curved ends, cut-to-size fillers, integrated appliance tall units, matching joinery for other rooms and branded or project-specific detailing all change production time as well as cost. Our custom and OEM service covers bespoke finishes and materials alongside standard production; if a detail is in your drawings, it should be in the RFQ so that it is priced rather than negotiated later.
A shortlist check before you send
Confirm your RFQ contains:
- Room scope and the full unit schedule with quantities
- Door and carcass specification stated separately, with substrate named for each
- Hardware listed as priced lines with brand and model reference
- Appliance schedule and worktop, splashback and services interfaces
- Dimensioned elevations, plan and site tolerance notes
- Delivery terms, order sequence, approval steps and installation scope
Send that package and the quotations you receive will be directly comparable, because each supplier is pricing the same scope. The items that normally surface later as variations in custom cabinetry — scribes, fillers, appliance housings, hardware grade and delivery basis — are named and priced before production starts. If you are specifying this cabinet line for a villa or hospitality kitchen, send your drawings and unit schedule to us and we will quote against the specification you confirm.