Arched French doors are one of the few openings in a villa drawing set that carry both a structural job and a visual one. The curve sets the proportion of the whole elevation, so an order that is right on the plan can still read wrong on site if the radius, the frame build-up or the opening sequence was never written down. Santerson's Santerson Arched French Doors are made to measure for residential door projects, which means the buyer — not the factory — has to supply the information that keeps the arch true. The checklist below is what an Australian architect, builder or project owner should confirm before a purchase order is raised.
Start with the opening, not the door
The product page for this collection states made-to-measure sizing, material and finish options, and a layout tailored to the project — and it also says plainly to confirm dimensions and selected specifications for each project. That instruction matters more for an arched unit than for a rectangular one. A straight door can absorb a few millimetres at the jamb; an arch cannot, because the curve is fixed once the head piece is cut.
Before anything is quoted, ask the factory to confirm three numbers against your own setting-out drawing: the clear opening width, the springing height (the level where the straight jambs stop and the curve begins), and the rise of the arch above that line. Then state which one governs if the site opening deviates. If your detail is a segmental arch rather than a full semicircle, say so in words on the order — "arched" alone is not a specification.
Decide what the arch is made of and how it is assembled
Santerson's door range covers several constructions under one roof: Santerson Modern Slim Frame French Doors where the sightline is deliberately narrow, and Santerson Decorative Interior Doors where the leaf carries mouldings and panel detail. The same project often needs both — a slim glazed pair to the terrace, paneled pairs internally — and the finishes have to match.
For each unit, get written confirmation of: the substrate behind the finish (veneer, lacquer, solid timber or a metal frame), whether the arched head is a single assembled piece or a jointed one, and how the glazing beads are captured on the curve. Jointed arch heads are normal in factory production; what you need to know is where the joints fall relative to the crown line, because that is the first place an inspector's eye goes.
Fix the leaf count and the opening sequence
A double-leaf pair can meet under a single arch, or the arch can sit above a fixed transom with the leaves below it. These are different products at different prices. Specify: number of leaves; which leaf is active and which is fixed; hinge side for each leaf from a stated reference point on the plan; whether an astragal or rebate post is required; and how the mullion head detail resolves where the two leaves meet the curve.
If the pair must open fully onto a terrace, say so at quotation stage. An active leaf hinged at the extreme jamb of a wide arched opening behaves differently under its own weight than a standard-height door, and the hardware set has to be chosen for that load rather than assumed.
Ask what is included in the price
This is where Australian orders most often go over budget after arrival. Itemise explicitly: frame and arch head, leaves, glazing, glass specification, hardware (handles, hinges, lock keep, any flush bolt for the inactive leaf), architraves or casing, and fixings suitable for your wall build-up — brick veneer, steel frame and lightweight partition all need different anchor types. Then ask what is not included.
Glass in particular should be quoted separately so you can price it locally if needed. Santerson's catalogue spans Windows and Doors alongside flooring, wall panelling, cabinetry and joinery, which is convenient for a single-source villa package — but the glazing specification itself should still be written into your own order document rather than inherited from a brochure.
Put the finishes on paper, not in a mood board
Veneer matching between doors, wardrobes and wall panelling is decided by a physical sample, not a photograph. Request a signed-off finish board for every door type before production starts: substrate, grain direction, stain or lacquer build, sheen level, and hardware metal with its own sample. Keep the approved board on site; it is your only objective reference when a batch arrives.
Coordinate doors with the rest of the package
Doors ordered in isolation tend to clash with what was already bought. Floor levels change door heights — an engineered oak floor laid on a screed lifts the finished level and shortens the clear opening. Skirting has to return into the architrave, not butt awkwardly against it. Santerson's Turnkey Villa Furnishing service exists precisely because these interfaces are easier to resolve in one coordinated order than across six suppliers.
Practical sequence: set the door schedule first, then confirm finished floor levels against it, then release joinery and panelling that abut the frames. Where a door leaf needs to disappear into a wall, that decision belongs to the framing stage, not the finishing stage.
Agree the survey, packing and inspection points
For made-to-measure arched units, ask who verifies dimensions and when. A second check against the as-built opening after the head height is fixed on site costs nothing; re-manufacturing a curved head after shipment does not.
Then specify packing: arch heads are the vulnerable element, so they should be crated with the curve supported, edge-protected and kept flat rather than stood on end. Confirm the crate marking matches your door schedule numbers exactly — every leaf, frame and arch head labelled to the same reference used on your drawings. Photograph each crate before it is opened, and open them in room order.
Write down what happens if something is wrong
Before payment, agree in writing how a discrepancy is handled: who pays for replacement of an incorrect unit, how the replacement ships, and what the notification window is. Ask the same about spare hardware — extra hinges, a spare lock set and glass beads for the curved section are cheap to include in the original container and expensive to source one at a time later.
Santerson lists Furniture Installation and After-sales Support, including on-site installation, inspection and snagging, alongside Furniture Logistics and Door-to-door Delivery with freight forwarding and customs documentation. For an Australian project, treat those as services to be scoped per order rather than as guarantees: confirm the delivery address and Incoterms, who handles Australian clearance, which trades do the fixing, and what snag items are covered after handover.
A short pre-order checklist
- Clear width, springing height and arch rise confirmed against the setting-out drawing, with the governing dimension named.
- Arch type stated in words (segmental or semicircular) and the joint positions relative to the crown confirmed.
- Leaf count, active leaf, hinge side, astragal or rebate post, and hardware set specified per opening.
- Substrate, grain direction, finish build and sheen on a signed finish board; hardware metal sampled separately.
- Inclusions and exclusions itemised: glass, hardware, architraves, fixings for your wall type.
- Finished floor levels checked against the door schedule before frames are released.
- Crate marking matched to the door schedule; photographs taken before unpacking.
- Replacement, notification window and spare-hardware terms agreed in writing before payment.
Arched French doors reward buyers who specify early. Every item above costs nothing while the drawing is still open, and each one becomes expensive once the curve has been cut. If your project needs the arch heads, frames, joinery and panelling resolved together rather than in sequence across separate suppliers, send the door schedule to SANTERSON with the drawings and have the openings reviewed against it before the order is raised.