A sample of acoustic panels rarely tells you much. The panel that looks handsome in the showroom can arrive on site too tall for the opening, sitting on the wrong track, or paired with a finish nobody specified. Acoustic sliding panels are made to measure, so the quality of the finished wall is decided long before production starts. It is decided by the brief. This guide sets out what to put in writing when you commission Santerson Acoustic Sliding Panels, so drawings, quotations and site installation all describe the same wall.
Start with the job the panels have to do
Before dimensions or finishes, state the function in plain words. In villas and apartments these panels are most often used to close off a study corner, hide a wardrobe or utility run, separate a media area from a living space, or divide a flexible room that has to change use through the day. Each of those jobs puts different demands on the same family of product: a dividing wall needs stable full-height leaves and a track that will not bind after years of daily use; a decorative screen behind a sofa needs a finish that reads well up close; a panel concealing plumbing needs access that stays easy.
Write down the room, the use, and how often the panels will actually be moved. A wall operated twice a day behaves differently from one opened once a month, and that difference should reach the workshop with the drawings rather than emerge as a snag at handover.
Give dimensions as an opening, not a panel size
The most common briefing error is sending a panel size when the manufacturer needs an opening. Supply the finished opening width and height, meaning the measurement after plaster, flooring, skirting and ceiling finishes are complete, together with floor level and any threshold. Then state what you want the panels to do at the edges: do they stack into a pocket, overlap a return wall, or close flush against a jamb?
The Sliding Panel Systems listings are configured per project, with made-to-measure sizing and material and finish options, so an opening drawing is what converts your intent into a buildable set of leaves. Alongside the size, confirm three items in the same document:
- Track and running gear. Ceiling-mounted or floor-guided, single or multi-track, and where the traffic line runs relative to the opening.
- Leaf layout and hanging direction. Number of leaves, their widths, which side they stack to, and how they fold or telescope.
- Structural support. What sits above the opening, whether steel, timber, block or plasterboard, because head fixings depend on it.
If you are also specifying a fixed dividing wall in the same rooms, send that as a related enquiry rather than a separate job. Santerson Partition Sliding Systems is specified on the same basis, and coordinating the two keeps tracks, leaf edges and reveals consistent across the project.
State the acoustic expectation as a scenario
Requests such as "soundproof" are not actionable, and no responsible manufacturer can quote against them. Describe the situation instead: which space is being separated from which, what the noise source is, whether conversation, television, plant or footsteps, and whether the priority is airborne sound between rooms or general reverberation inside one room. Those two needs pull the specification in different directions, and only after they are clear can the panel build-up, seals and detailing be agreed.
For a configurable acoustic listing, performance depends on the selected configuration, so acoustic requirements should be recorded as a project requirement to be confirmed for that build-up rather than assumed from a product name. Where a project genuinely needs a tested performance figure, say so in the brief and ask what evidence can be supplied for the proposed make-up. That single sentence protects you at specification stage and at handover.
Specify finishes the way they will be judged on site
Finish decisions are where a made-to-measure product either matches the interior or fights it. Specify the surface material, the colour or grain reference, the sheen level, and whether edges, handles and track covers are to match the panel face or contrast with it. Where a finish is already fixed elsewhere in the project, such as veneer on joinery, paint on frames or metal on ironmongery, say which of those the panels should agree with.
SANTERSON's Custom Furniture Materials and Finishes service covers bespoke finishes and textures alongside design and prototyping, so a brief can legitimately ask for a panel face that continues a wall panel, a wardrobe front or a headboard detail. If the finish must match an existing sample rather than a published option, send the physical sample and note the orientation of the grain or pile; matching under lighting is a visual decision, and it should be made by eye against a reference.
Name the coordination work you expect from the supplier
Sliding panels sit at the junction of several trades: flooring needs to be level under the opening, ceilings need to carry the head detail, lighting and sprinklers need to clear the track, and joinery nearby has to accept the reveal. A brief that lists expected coordination saves weeks. The one-stop scope covers design consultation and space planning, material selection and product specification, manufacturing with quality control, project management and site coordination, then installation and handover. Say explicitly which of those stages the supplier is to carry out and which your local contractor holds.
Also state who signs off the shop drawings, when they are needed, and what happens if a site dimension changes after production starts. That clause is uncomfortable to write and priceless to have.
A short brief template that works
One page is enough if it covers the essentials. The following order works because it mirrors how a quotation gets built:
- 1. Project and location. Building type, room list, stage of construction, target delivery window.
- 2. Function per opening. What each wall separates or conceals, and how often it operates.
- 3. Finished-opening drawings. Widths, heights, floor levels, head condition, stacking direction.
- 4. Acoustic scenario. Source, adjacent space, priority, and any evidence you require for the make-up.
- 5. Finish schedule. Surface, reference, sheen, edges, ironmongery, sample ownership.
- 6. Division of responsibility. Design, production, delivery, installation, snagging and after-sales support.
Send that with your drawings and you will receive a quotation you can compare line by line against other suppliers, rather than three documents describing three different walls.
Before you send the enquiry
Two habits are worth adopting. First, treat the acoustic requirement and the visual requirement as separate lines in the brief; they are confirmed by different evidence and approved by different people on your team. Second, keep one document as the single source of truth once shop drawings begin. Revisions sent by email from three separate consultants are how made-to-measure products fail on site.
If you are sourcing these panels within a wider fit-out, sending them with the rest of the joinery and wall systems in one enquiry usually simplifies both production and delivery. The One-stop Furniture and Building Materials Supplier service brings furniture and building materials into a single procurement scope, which is how most villa and hospitality projects that specify Sliding Panel Systems reach site complete.
Send drawings, the acoustic scenario for each opening, and your finish references. Shop drawings and a written specification come back for sign-off before production begins. See Interior Design Services for how that design-and-production coordination runs on a project.