A sliding panel TV system rarely fails on its own. It fails where it meets everything else: the media wall behind it, the lighting circuit that feeds it, the joinery it has to sit flush against, and the trade on site that installs all three. This guide walks through how we coordinate Santerson Sliding Panel TV Systems with the rest of a fit-out, so the panels, the wall they close and the storage around them read as one detail rather than four separate purchases.
Start from the whole wall, not the panel
Sliding panels are a closing device. They hide a screen, an alcove or a niche when the room is being used and open it when it is needed. That only works if the opening they close was designed first. In our workflow we ask for the wall elevation before anything else: where the screen sits, what sits either side of it, and whether the panels are expected to overlap each other or stack into a pocket.
Because these systems are made to measure, the panel sizes follow the opening rather than the other way round. That is also why we usually start with the wider wall build: Santerson Integrated TV Panels for a screen built into the surface, Santerson Full Height Media Walls where the composition runs floor to ceiling, and Santerson Wall Mounted Media Walls where a lower unit carries the equipment and the panels do the visual work above it. Pick the wall first; the sliding detail then has something fixed to coordinate against.
Match the finish across the family of panels
The most common coordination request is a simple one: the client wants the sliding panels to disappear into the wall they slide across. To do that, panel face and background panel need the same substrate, the same grain direction and the same batch of finish. Our paneling range covers matte lacquer, textured surfaces, stone and marble faces, and glass and glossy faces, so a matching combination is normally available rather than something you have to invent.
- Specify background and sliding panels on the same finish schedule, with the grain or pattern direction written on the drawing.
- Where the wall also carries a door, take the reveal from Santerson Decorative Concealed Doors so panel joint and door leaf line up.
- Where the sliding element has a job beyond hiding the screen, such as dividing a room or softening reflections in an open-plan living space, look at Santerson Acoustic Sliding Panels and Santerson Glass Sliding Panels instead of duplicating the media wall face.
- Where the panels close wardrobes or cupboards as well as the TV zone, keep the track and handle detail consistent with Santerson Closet Sliding Panels so one language runs through the joinery.
Finish names and panel constructions are configured per project. Treat any finish shown on a product page as a starting point, and confirm the actual face material, substrate and edge detail against the drawing you approve for production.
Sort out services before the panels are made
Panels move; cable runs do not. In most sliding panel TV details we have coordinated, the electrical and AV provisions were decided after the panel layout, and then had to be worked around. Reversing that order removes a large share of the arguments on site.
- Fix the screen position and its mounting method before sizing panels, because the bracket, the cable drop and the panel travel all compete for the same few centimetres.
- Keep sockets, terminals and set-top equipment outside the panel travel path, or in a fixed section that does not move when the panels are opened.
- If the wall carries lighting, coordinate it with Santerson Backlit Feature Walls or Santerson Integrated Cabinet Lighting early, so driver access and cable routes are designed in rather than chased later.
- Confirm the track type, hardware and opening dimensions with us before the surrounding plasterboard or joinery is set out, since the head detail depends on which mechanism you choose.
Electrical ratings, driver locations and any low-voltage provisions are project-specific. We record them on the production drawings, and your electrician confirms them against the site installation.
Coordinate storage so the wall is not just a screen
A media wall in a family villa or a guest suite gets used for far more than the television. Once the panel geometry is set, we usually bring the storage into the same elevation rather than letting it appear as separate furniture later. Santerson Storage & Display Combo handles the mixed case, with closed volumes for equipment and clutter and open niches for objects, while Santerson Integrated Media Storage suits projects where the whole wall is being built as one joinery item.
Two practical points worth settling early. First, door and drawer openings need clear swing or run space; a panel that slides across a drawer front makes the drawer useless. Second, keep ventilation to equipment compartments clear of the panel overlap. Both are drawing-stage decisions and both become expensive if they are discovered at installation.
One supplier for the whole fit-out package
Coordination is easier when fewer parties hold the drawings. As a one-stop furniture and building materials supplier, we produce media walls, paneling systems, cabinetry, doors, vanities, lighting accessories and flooring in our own facility, which means a sliding panel TV system, the wall it closes and the joinery beside it come off the same set of dimensions and the same finish schedule. For villa and hospitality projects this is where the savings actually sit: not in unit prices, but in fewer clashes between trades.
Our cooperation follows a fixed sequence: project brief and design proposal, quotation and detail confirmation, then production, shipment and follow-up. Under our Custom & OEM Service, dimensions, materials and finishes are built to the approved drawing rather than chosen from a fixed catalogue. Freight is arranged door to door under our Logistics & Door-to-Door Delivery service, with installation and after-sales support set out under Installation & After-sales Support. Import terms, duties and transit arrangements are confirmed per project, since these vary by destination and shipment type.
What we need from you to price it properly
- A wall elevation with overall width and height, plus the finished floor and ceiling levels.
- Screen size, mounting method and the position of every socket, terminal and equipment bay.
- Panel count, travel direction and where the panels are meant to stack or pocket.
- The finish schedule for the background wall, so panel faces can be matched.
- Any lighting on the wall, whether backlit sections, cabinet lighting or sconces, with control expectations.
- Adjacent joinery items you want carried in the same package, such as wardrobes, sideboards or tall cabinets.
Send those and we can return a proposal with panel layout, mechanism options and a finish schedule that matches the rest of your wall build. If you are specifying several rooms, we review the whole set together so track types and finishes stay consistent across units.
Santerson is a China-based furniture and building materials manufacturer working on villa, hospitality and office projects since 2008, with design, production, logistics and installation handled under one roof. If your fit-out includes a media wall that needs to close cleanly, contact our team with your elevations and we will coordinate the sliding panels, the wall behind them and the joinery around them as a single package.