A square swim spa in the garden of a villa or resort looks simple on a rendering: a shell, some jets, a cover, a deck around it. In procurement terms it is one of the least forgiving items in an outdoor package, because the decisions that matter most — power, structure, drainage, access — have to be locked before the shell ever arrives on site. Outdoor Swim Spa WS-PC02 is a configurable hydrotherapy unit in our outdoor swim and spa range, and it suits compact courtyards, villa terraces and resort garden settings where a long lap pool would not fit. Below is the checklist we ask project teams to work through before that model goes on an approved schedule.
Start with the footprint, then check what sits underneath
The catalog footprint for this model is 3000 × 3000 × 1050 mm. A square plan makes placement and deck detailing easier than an elongated tub, but it does not reduce the groundworks: a filled spa of that size carries a very heavy wet load, so the slab or pad beneath it has to be designed by the local structural engineer for the actual installation condition — partially recessed, semi-recessed or fully above grade on a deck. Confirm which of those three the design intends before the landscape contractor pours anything, because the reinforcement and the waterproofing detail differ in each case.
The 1050 mm shell depth also decides two things people often argue about late: water volume, which drives heating and filtration duty, and how the spa reads against the surrounding deck and seating. Where the design calls for a different plan size or an irregular shape, our customizable shape outdoor spa service covers bespoke hydrotherapy pool geometry rather than forcing a standard catalog shell into an awkward courtyard.
Confirm the equipment set in writing, not from a spec sheet
Configurations within this range vary, and two units carrying similar model numbers can ship with different pumps and treatment options. Before approval, ask for the equipment schedule of the exact configuration you are buying. For reference, the catalog entry for WS-PC02 lists:
| Model | WS-PC02 |
| Catalog dimensions | 3000 × 3000 × 1050 mm |
| Control system | 1 set |
| Water pump | 2 pcs |
| Filter pump | 1 pc |
| Jet total | 60 pcs |
| LED lights | 1 pc |
| Total power | 7.35 kW |
| Features shown | Water jets, LED lighting, Ozone |
Two details in that table deserve attention on a project drawing. The catalog does not list a swim training system for this configuration, so if the client brief says "lap swimming" or "counter-current swim", raise it now rather than after installation — a swim unit from another part of the range may be the correct answer. And total power is listed as 7.35 kW without a heat pump in the shown feature set; add the equipment options you want and the electrical load changes with them.
Treat the electrical design as a separate scope
This is where outdoor spa projects most often stall on site. The catalog figure covers the unit as configured; it does not cover the local distribution board, protective devices, cable runs, or the electrician's labour, and those must be specified by a licensed installer to the code that applies at the project address. Work through four questions with that installer before ordering:
- Circuit capacity. Whether the supply can carry the confirmed equipment set, including any heat pump added later, with the correct breaker size and cable length factored in.
- Protection requirements. Residual current protection, bonding and equipotential detailing around the shell, which the local electrical code governs — not the product catalog.
- Plant-room location. Where the control system, pumps and filter live, and how far that is from the spa. Long pump runs cost pressure and money.
- Service access. A removable panel or hatch at the plant end, so a technician can reach the pumps, filter and control without lifting decking or draining the spa.
Decide the options you want at the point of order
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the practical rule is simple: an option that changes plumbing, insulation or load should be chosen before production, not requested as a site modification afterwards.
Three choices usually matter most for project use:
- Heating. A heat pump changes running cost and comfort in cooler months far more than any other option, and it also changes the electrical design — decide it early.
- Insulation. For villas and resorts that run the spa outside a short season, insulation around shell and pipework is what keeps standing losses down.
- Water treatment. Ozone appears in the shown feature set; UV sterilization and sand filtration are options to confirm against expected guest load, especially where the spa serves hotel or clubhouse guests rather than one household.
Plan delivery and lifting before the shell ships
A 3 m square shell is a bulky item to move through a built-up site. Before production starts, walk the delivery route with the site team: gate width, turning radius, overhead cables, the load rating of any driveway or terrace slab it has to cross, and whether a crane or a gang of porters is needed at the last stretch. Recessed installations have an extra constraint — once the pit and perimeter walls are built, the shell must drop in before those walls close, so the sequence in the programme matters as much as the route.
Our logistics and door-to-door delivery service covers freight forwarding, packaging and container loading, customs paperwork and tracking to site; the final lift into position and the connection works stay with the local contractor. Send us your access photos and the site plan early and we will confirm how the unit is packaged for that route.
Coordinate the spa with the rest of the outdoor package
A swim spa rarely stands alone in a landscape design. Decking, loungers, shade structures, storage for chemicals and covers, and the lighting scheme all touch it, and each one is easier to solve while the drawings are still open than after the shell is on site. Where the same supplier handles several of those elements, levels, materials and finish tones stay consistent across the terrace.
That coordination is part of our turnkey project service, which runs from consultation and design through production, logistics, installation support and after-sales — with outdoor furniture, pergolas and loungers, bathroom fixtures, lighting and interior finishes drawn from one catalogue rather than six separate vendors.
A short pre-approval summary
Before WS-PC02 is signed off, the project team should be able to answer yes to each of these:
- The structural support for the chosen installation type has been engineered and drawn.
- The equipment schedule of the exact configuration is in writing, including which options are included and which are not.
- A licensed local electrician has confirmed supply, protection and plant location against that schedule.
- Drainage, overflow and an access point for servicing are shown on the landscape drawing.
- The delivery route and lift method have been walked on site.
- One named party owns the connection, commissioning and handover sequence.
If you are specifying this model for a villa, resort or clubhouse project, send us the plan, the section through the spa area and your required option list, and we will confirm the configuration, packaging and lead time against your programme — and flag any variant in the range that fits the brief better. Enquiry details are on our contact page.