A swim spa enquiry rarely fails over style. It stalls because the buyer and the factory are working from different pictures of the same site. Before Outdoor Swim Spa WS-PC01 can be quoted, produced and shipped as part of a villa or hospitality package, we need a defined set of dimensions, access details and equipment choices from your side. Below is the exact input list our project team works from, using WS-PC01 as the reference model.

Start with the shell: what WS-PC01 already fixes

WS-PC01 sits in our configurable outdoor swim and hydrotherapy range. The catalogue record for this model gives a footprint of 3000 × 1050 mm, with a total power figure of 6.65 kW, two water pumps, one filter pump, 53 jets, one control system and one LED light, plus the features shown on the page: water jets, LED lighting and ozone. Treat those numbers as the starting point of a specification conversation, not as a finished schedule — what is included changes with the configuration you select.

Two practical consequences follow. First, the 3000 mm length is a shell dimension, not the space you need on site; deck framing, clearances for access panels and the position of steps all sit outside it. Second, power is quoted as a total for the model as catalogued. Adding a heat pump or a different sterilisation option moves that figure, so the electrical design should wait until the equipment list is closed.

Measurements to send with your enquiry

  • Clear rectangular opening or pad area — length and width of the prepared base, plus whether the spa will sit flush in a deck, partly recessed, or fully above grade on a plinth.
  • Available height envelope — parapet, railing or pergola heights near the unit, since these affect step choice and how the shell is lowered into place.
  • Access route from the delivery vehicle to the final position — gate width, turning radius, overhead obstruction, stair runs and lift dimensions for rooftop or courtyard installations.
  • Structural support — for terraces, balconies and upper-level decks: slab build-up, load capacity confirmation from your engineer, and waterproofing details.
  • Service clearances — how the equipment compartment will remain reachable for routine maintenance after the deck is finished.
  • Drainage and overflow route — where discharge water goes during draining and backwash, and whether a drain is already in position.

Send drawings if you have them. A simple site plan with the four dimensions above answers more questions than any written description, and it lets us flag conflicts while the design is still cheap to change.

Project inputs that shape the quotation

  • Intended use — private villa terrace, resort or hotel guest area, gym or wellness facility. Commercial settings usually change the durability and maintenance choices, and they affect how often filtration runs.
  • Water volume and target temperature — who uses it, in what season, and whether year-round use is expected. This drives heating and insulation decisions.
  • Electrical supply available at site — voltage, phase, dedicated circuit capacity, and where the isolator will sit relative to the spa.
  • Optional equipment you want quoted — the catalogue options across this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against WS-PC01 before it enters the quotation.
  • Quantity and phasing — one unit or several across a development; staged delivery changes packaging and container planning.
  • Destination and delivery terms — port or site address, and whether you want door-to-door delivery handled with the rest of the order.

How this fits a larger fit-out order

Most swim spas we produce leave the factory inside a wider package. A terrace project typically combines the water feature with outdoor furniture, perimeter lighting and wall or ceiling finishes, while the same villa also needs built-in cabinetry and bathroom fixtures indoors. Ordering these through one turnkey project solution removes the coordination burden of matching finishes and synchronising shipments between separate suppliers. As a China-based furniture and building materials manufacturer, we handle production, packing and freight for the combined order under one project schedule.

Where a project needs something other than a standard catalogue footprint, our custom and OEM service covers bespoke sizing, finishes and material selection. In the same swimming pool range there are units with different footprints — WS-PC01A at 3000 × 930 mm and WS-PC02 at 3000 × 3000 × 1050 mm — plus customizable shape outdoor spas in square, round, oval and curved layouts when the plan calls for a non-rectangular form.

What happens after you send the inputs

We return a specification sheet listing exactly what is included in your configuration: pumps, jets, control system, lighting, sterilisation and any heating or insulation option. Your team confirms it in writing. Only then does production start, followed by packing, container loading and the freight arrangements agreed with you.

The most common rework we see is an assumption about electrical requirements made before that confirmation. A site electrician who wires to the catalogue power figure of a base model may find the selected configuration draws differently. Confirming the equipment list first costs nothing; rewiring a completed deck does not.

Quick checklist before you enquire: site plan with clear opening dimensions and installation method; access route measurements; structural sign-off for elevated decks; drainage point; electrical supply details; target equipment options; quantity and destination. Send those, and the quotation for WS-PC01 comes back with a specification your trades can build against.

Dimensions, power figures and equipment counts in this article are transcribed from the WS-PC01 catalogue record on our site and apply to that configuration. Included equipment, electrical requirements and optional accessories for your project must be confirmed on the specification sheet before ordering.